PennDOT Load Rating of Gusset Plates GUSSET PLATE EVALUATION • Tom Macioce, P.E. • Chief Bridge Engineer 1 of 27 April 2009 www.dot.state.pa.us PennDOT Load Rating of.
Download ReportTranscript PennDOT Load Rating of Gusset Plates GUSSET PLATE EVALUATION • Tom Macioce, P.E. • Chief Bridge Engineer 1 of 27 April 2009 www.dot.state.pa.us PennDOT Load Rating of.
Slide 1
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 2
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 3
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 4
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 5
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 6
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 7
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 8
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 9
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 10
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 11
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 12
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 13
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 14
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 15
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 2
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 3
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 4
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 5
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 6
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 7
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 8
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 9
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 10
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 11
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 12
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 13
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 14
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us
Slide 15
PennDOT Load Rating of Gusset Plates
GUSSET PLATE EVALUATION
• Tom Macioce, P.E.
• Chief Bridge Engineer
1 of 27
April 2009
www.dot.state.pa.us
PennDOT Load Rating of Gusset Plates
Overview
•
•
•
•
•
PennDOT Gusset Plate Evaluations
PennDOT Inspection Requirements
PennDOT Rating Spreadsheet
Target Dates
Summary
2 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Inventory - 320 steel trusses identified (174
state-owned, 146 locally-owned)
• PennDOT required all deck trusses (54) be reinspected by August 30, 2007, and all non-SD
deck truss bridges by November 30, 2007
• Cost - $2M for the re-inspection of deck trusses
• Cost - $2M for rating of gusset plates
3 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• PennDOT began development of gusset plate
analysis spreadsheet in February 2008
• Permit load analysis approach
– Heavy hauling permits evaluated using Bar 7
– Assume reduced capacity of truss members framing into
gusset plates
– Reduced member capacity approach will be used until
the gusset plate analysis option is incorporated into
BAR7
4 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Spreadsheet development completed in accordance
with FHWA technical advisories- October 2008
• Both LFD and ASD analysis methods supported
• BAR 7 output file load data used in spreadsheet
• Evaluates O.R. only
• 3 man-days to analyze and check a truss bridge
• 1.5 Hours per joint for a standard truss
• 2.5 hour per joint for a complex truss
• Additional hours required for field inspections
5 of 27
www.dot.state.pa.us
PennDOT Truss Gusset Plate Evaluation
• Administration
– Strike Off Letter (431-09-02) issued February 11,
2009
• Updates to Publication 238 Chapters 3 and 6 addressing
gusset plate analysis.
• Developed Deck Truss Geometry Field Inspection Sheet
6 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
• Revised inspection training September 2008
• Issued policy February 2009 Strike-Off Letter
7 of 27
www.dot.state.pa.us
PennDOT Inspection Requirements
Emphasis on• Distortion or bowing
• Corrosion documentation
• Tack weld documentation
• Slippage of connections
• Repairs/retrofits (condition and performance)
• NDE follow-up
• Capture necessary field data to properly load
rate the gusset plate
8 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Annotated data extraction from BAR 7
BAR 7
or
STAAD
Field
Data
Analysis
• Inspection
– Forms
– Digital Photo Measurements
Shop
Drawings
9 of 27
www.dot.state.pa.us
PennDOT Rating Spreadsheet
• Several months to develop
• Tested on 7 bridges, primarily Interstate
bridges
• 5 engineers involved in verification
10 of 27
www.dot.state.pa.us
Target Dates
• Important Milestones • Strike Off Letter (431-09-04) issued March 10,
2009
– State owned bridges analyzed by December 31, 2009
– Local owned bridges analyzed by December 31, 2010.
• Revise BAR7 to include gusset plate analysis
December 2009
11 of 27
www.dot.state.pa.us
Status of Analysis
• Districts to provide monthly status reports for
tracking progress
• State - 183
– Completed 54
– Under Analysis 98
– Future Work Orders 31
• Local - 149
– Completed 52
– Under Analysis 11
– Future Work Orders 86
12 of 27
www.dot.state.pa.us
Issues
• Continuous chord members through gusset plate
• Welded connections
– Plates are analyzed for shear
– Weld strengths analyzed by supplemental hand
calculations
• QA reviews of analysis is required
• 1 bridge has required posting due to gusset plate
rating
– Deck Truss
– Bearing location
– Section loss along top chord
• Leaking deck joint
13 of 27
www.dot.state.pa.us
Summary
• Evaluation will provide additional level of bridge
safety
• FHWA Technical Guidance is appropriate
• Elected to perform rating as opposed to a
screening process
• Revise BAR7 to include gusset plate analysis
December 2009
14 of 27
www.dot.state.pa.us
Thank You
15 of 27
www.dot.state.pa.us