Fort Saskatchewan Boundary Review New K-9 School Elk Island Public Schools 2014-2015 What is a boundary review? ● A boundary review is a process by which.

Download Report

Transcript Fort Saskatchewan Boundary Review New K-9 School Elk Island Public Schools 2014-2015 What is a boundary review? ● A boundary review is a process by which.

Slide 1

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 2

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 3

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 4

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 5

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 6

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 7

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 8

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 9

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 10

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 11

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 12

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 13

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 14

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 15

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 16

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 17

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 18

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 19

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 20

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 21

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 22

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 23

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 24

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!


Slide 25

Fort Saskatchewan
Boundary Review
New K-9 School

Elk Island Public Schools
2014-2015

What is a boundary review?
● A boundary review is a process by which the
division reviews school boundaries to determine
the best possible use of facilities and
programming.

● This review has been identified as a priority by the
Board of Trustees in preparation for the new
K-9 school being built in Fort Saskatchewan.

Purpose of the boundary review
● To create a school boundary for the new K-9
school opening in Fort Saskatchewan.
● To determine the best possible use of facilities and
programming.

● To ensure facilities and resources are used
efficiently for the maximum benefit of students.
● To create transportation efficiencies (number of
buses, bus capacity, and ride times) where
possible.

Schools Potentially Impacted
● Fort Saskatchewan Elementary (K-6)
● James Mowat Elementary (K-6)
● Win Ferguson Elementary (K-6)

● Rudolph Hennig Junior High (7-9)

Schools Not Impacted in the Boundary Review
● École Parc Élémentaire (K-6)
● Fort Saskatchewan Christian (K-9)
● Fort Saskatchewan High (10-12)

● Next Step Senior High – Fort Saskatchewan
(10-12)
● Surrounding schools in Strathcona County or
Lamont County

Fort Saskatchewan Boundary Map – Current
Elementary Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Elementary Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (urban area)

Fort Saskatchewan Boundary Map – Current
Junior High Schools (rural area)

Fort Saskatchewan Boundary Map – Current
Senior High Schools

Working Assumptions
●

Recommendations that are brought to the Board will
not increase the division’s operating costs.

●

Board approved recommendations resulting from this
project will be implemented once the new school opens
– scheduled for September 2016.

●

EIPS encourages families to enroll their children at their
designated school as all schools in the division provide
quality educational programming.

●

Through the boundary exemption process, the division
recognizes some individual student needs may be best
addressed at a non-designated school.

Working Assumptions (con’t)
Any boundary changes will:
● Not cause schools to exceed their optimal
enrolment limits (OEL) nor be impacted by
significant declines in enrolment.

● Where possible, direct busing of students will be
favoured.

In Scope
What will change:
● Attendance boundaries
What might change:

● Busing routes
● School start and finish times
● Location of EIPS System Special Education
Programs

Out of Scope
What will not change:
● Location of the EIPS French Immersion program
(École Parc Élémentaire).
● Location of Alternative Christian and Next Step
Outreach programs.
● No Fort Saskatchewan schools will be closed as a
result of this boundary review.

How are we going to do this important work?
● Sharing information and gathering feedback
through school council meetings and an online
survey (Phase 1 of public consultation).
● Presenting boundary map options at Open Houses
to gather public feedback through a paper and
online survey (Phase 2 of public consultation).
● Bringing forward a recommendation to the Board
for their consideration.

Who will be making the decisions?
● The Board of Trustees is responsible for making
the final decision on the recommendations.
● The Board will be observing the consultation
process and will be updated frequently.

● The Board will be using a sustainable decisionmaking model.

Sustainable Decision-Making Model

*Adapted from © International Association of Public Participation

Project Timeline
January-February 2015
● Gathering input from school community members at
school council meetings.
● Interested staff, parents, and community members provide
input through an online survey.
● Gathering naming suggestions for the new school.
February-March
● Reviewing the information collected at school council
meetings and posting a summary on the division website.
● Redrawing boundary lines, reviewing transportation
implications, and developing options.

Project Timeline (con’t)
March-April
● Open Houses: presenting best options and key
information for public feedback and receiving feedback on
the strengths and challenges of each option.
● Gathering community feedback on shortlisted school
name suggestions.
May
● Analysis of all information and feedback collected.
● Refining of boundary options as required.
June 2015
● Recommendation of new boundaries is presented to the
Board of Trustees.

Enrolment and Optimal Enrolment Limits of Potentially
Affected EIPS Schools (2013/2014 Numbers)
School

Enrolment
(14-15)

Alberta
Infrastructure
Capacity
(Feb 2014)

Optimal
Enrolment Limit
(OEL) (15-16)

Fort Saskatchewan
Elementary (K-6)

401

400

380

James Mowat Elementary
(K-6)

355

379

400

Win Ferguson Elementary
(K-6)

471

416

380

Rudolph Hennig Junior High
(7-9)

432

620

500

New School (K-9)

Opening
capacity of 500

So…
we’re looking for your input

Phase 1 of public consultation

In Redrawing Boundary Lines
Criteria to be considered:
●

Keeping communities and sub-divisions together;

●

Length of bus rides times, number of buses, and
associated costs;

●

Use major roads and highways as natural breaks,
where possible;

●

Physical proximity to school;

●

Maintaining a feeder school framework, where
possible.

Your Input
● As we continue our work in redrawing Fort
Saskatchewan boundary lines, what things would
you like us not to lose sight of?
● Do we need to add/remove any criteria we will use
to draft new boundary map options?
● Are there any other considerations?
● Naming suggestions for the new school.

Next Steps
EIPS will:
●

Analyze feedback gathered during this first phase of
the process – online survey.

●

Shortlist new school name suggestions.

●

Begin to redraw boundary lines and explore options.

●

Circulate map options and naming suggestions for
further feedback as part of the second phase of the
consultation – open houses.

●

Recommendations will go to the Board at the June
2015 public meeting.

Thank you

Thank you

Thank you

Thank you!