SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 2

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 3

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 4

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 5

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 6

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 7

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 8

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 9

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 10

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 11

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 12

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 13

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 14

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 15

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 16

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 17

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 18

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 19

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 20

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21


Slide 21

SIMONE as a key support for operating

transmission system of Plinacro

Authors:
Josip Jovanovac, Plinacro d.o.o.
Martin Styblo, SIMONE Research Group s.r.o.

1

Existing transmission system
ROGATEC

VARAŽDIN

Hungary

Slovenia
ZABOK
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG
KUKULJANOVO

BOSILJEVO

OSIJEK

UGS
Okoli

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

- 2085 km of pipelines

Bosnia
and Hercegovina
ZADAR
KNIN

-18 supply points
-1 border interconection
-151 offtake stations
SPLIT

-1 underground gas storage
- no compressors

PLOČE

Montenegro

2

Existing transmission
system + possible future
extensions
Slovenia

ROGATEC

VARAŽDIN

Hungary

ZABOK

DRAVASZERDAHELY
ZAGREB

BJELOVAR

LUČKO

Serbia

D. MIHOLJAC
BELIŠĆE

KARLOVAC

UMAG

OSIJEK

UGS
Okoli

KUKULJANOVO
BOSILJEVO

KUTINA

POŽEGA

JOSIPDOL

S. BROD

OMIŠALJ

NOVA
KAPELA
B. BROD

VODNJAN

PULA

GOSPIĆ

Italy

Bosnia
and Hercegovina
ZADAR
KNIN

- 1000 km of new pipelines

BENKOVAC

- new border interconnections - transit
- new UGS
SPLIT

- compressor stations
PLOČE

Montenegro

3

Supervision and Control System
National Dispatching Center
Communication system

- microwave link PDH ring
- radio links to RTU-s

- fiber-optic network

4

Supervision and Control System
National Dispatching Center
Communication system

5

Supervision and Control System
National Dispatching Center

Built during 2006. as integrated turn key project
- real-time supervision of major entry and exit points
98% of entry and 90% of exit flow
- remote flowrate/pressure control on important network nodes
- SIMONE real time model + leak detection
support for decision in real-time balancing activities

6

Plinacro – Transmission System Operator NOW
Technical conditions for operating transmission system
• stable flat flow rates on supply points
• 40% of transmission for households consumption - seasonal character
• no established full transmission nomination regime
• UGS flow rate set by TSO, based on actual state and partially known plans

Bussines enviroment for operating transmission system
• Plinacro - unbundled TSO, 100% state owned

• basic legal framework for opening gas market exist
• lower legal acts in preparation (market rules, network codes etc.)
• one shipper - one transmission contract
• no compettion for transmisson capacity acces

7

Plinacro – Transmission System Operator IN NEAR FUTURE
• transmission system extension – new border interconnections - transit
• real gas market opening - new market players – new shippers
• nondiscriminatory and transparent TPA
• nomination, allocation, balancing - required IT support
New IT infrastructure
• telereading system - all exit points daily metered and fiscal data acquired via GPRS
• Gas Transmission Management System
− contract management (interconnection, capacity booking)
− transmission nomination process
− allocation, balancing, reporting
− upgrade SIMONE instalation
evaluation of capacity requests and nominations
automated scenario preparation and result presentation

8

Focus on pipeline simulation (MS)
• Online system
– Installed functions
– Performance

• Offline simulations
• Customizations
• Benefits, experience, future

9

SIMONE online - functions
• State reconstruction
(PRSIM)
– SCADA data
– Manual entries (PRSIM_INC)
– Pig tracking

• Leak detection and
localization (LDSIM)
– Detection – jump of mass
correction signal for network
areas
– Localization – test & trial for
nodes/milepost within area

• Look-ahead simulation
(ZYSIM)
– Forecasted/scheduled flows
from UDW
– Manual entries (ZYSIM_INC)

• On-request simulation
– Save ZYSIM as…
– Data preparation from UDW

• Computational features
– Quality tracking, heat
dynamics

10

SIMONE online - performance
• State reconstruction (PRSIM)
– Linepack always well captured – pressure readings…
– Influence of manually entered offtakes
• Mass correction
• Flow distribution within loops

• Look-ahead simulation (ZYSIM)
– Flow-flow simulation starting from last state
– Smoothness of concatenation with PRSIM
• Mass correction in PRSIM

11

SIMONE – LIVE network model

12

Network balance figures

13

PRSIM performance
Distribution of pressure differences

Cumulative count

.

SCADA measurements vs. SIMONE online
100%
80%
60%
40%
20%
0%
0

0.5

1

1.5

2

Max24 h |P-PM| [bar]
14

Leak detection & localization
• Feasibility study
– Leak caused by hole of equivalent diameter 30 mm is
detectable within area
– Localization to node/milepost not 100%

• Test case
– Filling new part of pipeline, flow measured but unknown to
real-time model

• False alarms
– Known areas – few measurements & manually entered
offtakes
15

Test “leak”

16

First detection & localization (+6 min)

17

Final size & position (~45 min)

18

Offline simulations
• 2 offline workplaces
• Usage
– System development
– Operation planning
– Capacity studies

• Highly transient behavior of Plinacro pipeline
system
– Flat supplies vs. modulated consumptions
– Daily average static vs. Dynamic analysis
19

Customizations - “Stars” of control valves

20

Benefits, experience, future
Current state
• Online
– Supplies network balance
data for operators
– Brings “another” view on
readings
– Enables short-term what-if
analysis by expert
– Continuous extensions and
improvements

• Offline
– Useful for complex analysis
– Input data needed

Future
• Online
– More integration for operators
– Redundancy

• GTMS project
– Capacity calculations
– Nomination handling
– Easy access to data

“Human element”
Dedicated team - user, vendor
and integrator

21