Process, methods and instruments implemented at Inprofood DIALOGIK Stuttgart Germany The Team Dialogik Ludger Benighaus Christian Hofmaier Lisa Kastl Leonie Steckermeier Phases Pre-Phase Prepare the event or the series.
Download ReportTranscript Process, methods and instruments implemented at Inprofood DIALOGIK Stuttgart Germany The Team Dialogik Ludger Benighaus Christian Hofmaier Lisa Kastl Leonie Steckermeier Phases Pre-Phase Prepare the event or the series.
Process, methods and instruments implemented at Inprofood DIALOGIK Stuttgart Germany The Team Dialogik Ludger Benighaus Christian Hofmaier Lisa Kastl Leonie Steckermeier 2 Phases Pre-Phase Prepare the event or the series of events Conduct, organize and facilitate the event Post-Phase and report 3 Pre-phase First ideas Preliminary list of actors 4 Phase Prepare Think about groups of actors Recruitment, follow the usual ways, or try out new ones? 5 Phase Conducting Consider all types of established techniques of stakeholder engagement 6 Dialogue Well established Methods Group Delphi Literature review and expert survey Delphi survey Expert hearings Expert Consensus Conference, expert workshops Technical discussions Expert committees Focusgroups Scenario Workshop The round table as a discursive procedure Mediation Gaming (online and Face-to-face) Negotiations between important stakeholders Hearing for stakeholders Open Space Conference, World Cafe Dialogue Well established Methods Group Delphi Delphi survey Literature review and expert survey Expert hearings Expert Consensus Conference, expert workshops Technical discussions Focusgroups The round table as a discursive procedure Mediation Gaming (online and Face-to-face) Negotiations between important stakeholders Expert committees Scenario Workshop Hearing for stakeholders Open Space Conference, World Cafe Phase Reporting Professional reporting with additional staff Evaluation both quantitative and qualitative, including feedback from participants and facilitators 9 Conclusion • All processes of stakeholder and public participation need careful preparation and sufficient resources • People in charge should consider all forms and instruments that are available to design a stakeholder process • If needed, adjust existing ones, invent new ones • Neutral documentation and feedback loops with the people involved are absolutely necessary (for gaining trust and show transparency) 10 Partners