PREZENTAREA FIRMEI – DIVIZIA DE OTEL COMPANY PRESENTATION – STEEL BUILDING DIVISION DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION Activitatea principala Constructia.

Download Report

Transcript PREZENTAREA FIRMEI – DIVIZIA DE OTEL COMPANY PRESENTATION – STEEL BUILDING DIVISION DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION Activitatea principala Constructia.

PREZENTAREA FIRMEI – DIVIZIA DE OTEL
COMPANY PRESENTATION – STEEL BUILDING DIVISION
2011
DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION
Activitatea principala
Constructia de nave (proiectare, confectie,
asamblare si montaj sectii);
Constructii metalice civile si industriale;
Reparatii nave (inlocuire tabla si structura);
Subansamble poduri feroviare si rutiere;
Confectie si montaj tubulatura;
Procesare tabla cu grosimi intre 2 si 50 mm;
Prelucrare profile laminate din otel, toata gama
tipo-dimensionala.
Asamblare sectii – Blocks construction
Main activity
Ship building (engineering, welding, building
assembling blocks);
Civil and industrial steel structures building;
Ship repairs (replacing plates and structure);
Assembling units for railway and road bridges;
Confectioning and mounting pipe systems;
Processing of plate between 2 and 50 mm
thickness;
Processing laminate profiles, all range.
Montaj sectii – Blocks assembling
DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION
Dotare
-
-
Echipamente de sudura semiautomata in mediu de
gaz protector (KEMPY, MAGTRONIC);
Mese de sudura si echipamente auxiliare;
Echipamente de sudura manuale (KEMPY,
MINARC);
Scule si dispozitive de taiat si prelucrat metal
(debitare oxigaz, polizoare cu disc, masini de gaurit,
etc);
Echipamente de ridicare specifice (prese, palane,
cricuri, etc);
Dispozitive de masurare si control specifice pentru
activitati de constructii metalice;
Hala de confectionat;
Transport, incarcare – descarcare materiale;
Echipamente de metalizare in arc electric (zinc si
aluminiu).
Equipment
-
-
Welding semiautomatic (MIG) equipment
(KEMPY, MAGTRONIC);
Welding tables and auxiliary equipment;
Manual welding equipment (KEMPY, MINARC);
Tools and devices for cutting and processing
metals (gas cutting devices, disc cutting
machines, drilling machines, etc);
Specific lifting equipments (presses, hand tackles,
jack screws, etc);
Specific for steel building activities measuring and
control devices;
Assembling hall;
Transport, loading – unloading materials;
Arc metalizing equipment (zinc and aluminium).
DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION
Calitate
-
-
Personal tehnic calificat;
Sudori autorizati cu diverse Societati de
Clasificare (Lloyd’s Register of Shipping,
DNV, GL, etc);
Certificare ISO 9001.
Controlul calitatii
-
Radiografiere (raze X, gamma);
Pulbere magnetica;
Lichide penetrante;
Testare cu ultrasunete.
Quality
-
-
Skilled technical personnel;
Welders authorized by various Classification
Societies (Lloyd’s Register of Shipping,
DNV, GL, etc);
ISO 9001 certified.
Quality control
-
Radiography (X-Ray, Gamma);
Magnetic powder;
Penetrating fluids;
Ultrasound tests.
DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION
Echipament de metalizare a suprafetelor
metalice, cu zinc sau aluminiu (doua seturi)
– Metalizing equipment for metal surfaces,
with zinc and aluminium (two sets)
Echipament de sudura – Welding
equipment
DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION
Constuctie capace pentru barje. Client – NAVROM Galati
In progres – In progress
Building hatch covers for barges. Client – NAVROM
Galati
Livrate - Delivered
DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION
Sudura ancore in furnalul Nr. 5 Arcelor Mittal
In progres – In progress
Welding anchors inside blast furnace No. 5, Arcelor
Mittal
Aspect final – Final condition
DIVIZIA DE CONSTRUCTII DE OTEL – STEEL BUILDING DIVISION
Portofoliu
Portfolio
-
-
-
STX – OSV Tulcea (asamblat, montaj sectii nave);
Damen Shipyards Galati;
NAVROM Galati (constructie capace magazii de
marfa navale, etc);
Arcelor Mittal Galati (constructii metalice diverse);
Sea Metal Italia (constructii grinzi metalice si poduri
rulante).
-
STX – OSV Tulcea (construction, assembling ship
block sections);
Damen Shipyards Galati;
NAVROM Galati (building hatch covers for ship
cargo holds, etc);
Arcelor Mittal Galati (miscellaneous steel building);
Sea Metal Italy (building girders and lifting bridges).
Altele
Others
-
-
Firma detine proceduri de sudare recunoscute
pentru urmatoarele metode: sudare manuala
electrica, sudare automata si semiautomata in strat
protector de gaze (CO2 and Argon) si sudare
automata sub strat de flux. Firma detine personal
calificat, autorizat de BV, GL, DNV, LR, ABS.
The Company owns recognized welding procedures
for the following methods: manual electric welding,
automatic and semiautomatic welding MIG (CO2
and Argon) and automatic welding under slag layer.
The Company has qualified personnel, authorized
by BV, GL, DNV, LR, ABS.
DIVIZIA DE TUBULATURA – PIPING DIVISION
Instalatii navale construite de Sandblasting. Operatii
complete de indoire, sudura, armare cu flanse,
robineti, aparate de masura, etc
Marine pipe systems built by Sandblasting. Complete
operations of bending, welding, outfitting with
flanges, valves, measuring devices, etc
DIVIZIA DE TUBULATURA – PIPING DIVISION
Instalatii navale construite de Sandblasting. Operatii
complete de indoire, sudura, armare cu flanse,
robineti, aparate de masura, etc
Marine pipe systems built by Sandblasting. Complete
operations of bending, welding, outfitting with
flanges, valves, measuring devices, etc
POMPE DE APA LA PRESIUNE INALTA SI ULTRA INALTA - HIGH AND ULTRA HIGH PRESSURE WATER PUMPS
Firma opereaza pompe de apa de inalta presiune (500
bar) si de ultra inalta presiune (2500 bar).
The Company operates high pressure (500 bar) and ultra
high pressure (2500 bar) water pumps.
Pompele de 500 bar sunt utilizate pentru:
The 500 bar pumps are used for:
-
-
-
Lucrari de decontaminare a suprafetelor inainte de
vopsire;
Indepartarea vegetatiei de pe opera vie a navelor in
reparatie;
Indepartarea vopselei vechi inainte de aplicarea
unui sistem nou de vopsire.
Pompele de 2500 bar se utilizeaza pentru:
-
-
-
Indepartarea tencuielii vechi inainte de aplicarea
uneia noi;
Demolarea structurilor de beton si beton armat;
Indepartarea unui strat de beton pentru
descoperirea barelor de otel, in vederea
reabilitarii/imbunatatirii structurilor. Structura
sanatoasa nu este afectata de socuri, vibratii, etc
-
-
-
Decontamination works on surfaces before
painting;
Removing fouling on the underwater area of ships
under repairs;
Removing old paint layers before application of a
new painting system;
The 2500 bar pumps are used for:
-
-
-
Removing old plaster layer before to apply a new
one;
Demolition of concrete and reinforced concrete
structures;
Removing a concrete layer for revealing rebar, in
view of structure rehabilitation/upgrading. The
sound structure is not affected by shocks, vibration,
etc
SPALARE LA INALTA PRESIUNE – HIGH PRESSURE WATER WASHING
Pompa de spalare cu apa la inalta presiune (500 bar)

High pressure water washing pump (500 bar)
POMPA DE ULTRA INALTA PRESIUNE – ULTRA HIGH PRESSURE WATER JETTING
Pompa de apa la ultra inalta presiune (2500 bar)
Ultra high pressure water jetting pump
DREPT DE AUTOR - COPYRIGHT
Acest material este proprietate a Sandblasting TL. Se
interzice reproducerea in integrum sau partiala si
utilizarea in alte scopuri dacat cele aprobate in mod
expres de catre proprietar.
This material is property of Sandblastin TL. It is
prohibited multiplication in integrum or partly and
use for other purposes than the ones expressly
approved by the owner.
Tel/Fax: 0040 (0)236 414 588
Adresa E-mail: [email protected]
www.sandblasting.ro
Phone/Fax: 0040 (0)236 414 588
E-mail address: [email protected]
www.sandblasting.ro