CONTROL SURVEYING
UNIT II Control Surveying
CONTENTS
•
•
•
•
•
•
•
•
•
•
•
•
Working from whole to part
Horizontal and vertical control methods – Triangulation
Signals
Base line
Instruments and accessories
Corrections
Satellite station
Reduction to centre
Trignometric levelling
Single and reciprocal observations
Modern trends
Bench marking
Sivapriya Vijayasimhan
2
UNIT II Control Surveying
Introduction
Plane Survey :
Adopted for small distances
Curves in earth is ignored
Lines connecting two points is a straight line
Figure formed by joining straight lines is plane triangle
Geodetic Surveying or Trignometric Surveying
Long distances and large areas
Curvature of earth is taken care
Joining any two points on surface of earth is curved and forms arc of
circle
Absolute and high precision
Sivapriya Vijayasimhan
3
UNIT II Control Surveying
Working from whole to part
Horizontal points are established precisely
Area dived into large traingles or same equilateral
Large triangles are subdivided into small traingles, surveyed with less accuracy
To prevent accumulation of error and to control and locate minor error
Working from whole to part is effective
In Part to whole, error will be magnified and uncontrollable
CONTROL POINTS
A system of control stations, local or universal, must be established to locate the positions of
various points, objects, or details on the surface of the earth
Establish system of control points with high precision
Points can be vertical or horizontal
Sivapriya Vijayasimhan
4
UNIT II Control Surveying
Horizontal Control Points
To establish supplementary control stations for use in construction surveys
Supplementary control stations usually consist of one or more short traverses run close to or
across a construction area to afford easy tie-ins for various projects
Prevent excessive accumulation of error
Forms contour and gives more details
Established by means of triangulation or traversing
Two systems are adopted
1.Primary Control
Done by triangulation
Stations are established with less precision (leads for secondary control)
2.Secondary Control
Done by transit and tape traverse
Horizontal Control Methods
Location of points described by distance and direction from a reference point
Measurement of distance using Tape, Chain, Tacheometry, Electronic Distance
Measurement ,Total station, GPS
Measurement of direction using
Sivapriya Vijayasimhan
Compass, Plane Table, Theodolite, Total Station
GPS
5
UNIT II Control Surveying
Vertical Control Points
To determine elevation of primary control stations or to establish bench mark
Precise levelling
Primary stations located by triangulation and trigonometric levelling
Secondary vertical control points traverse station or bench mark
Done by ordinary spirit levelling
Vertical Control Methods
Direct Levelling
Trigonometrically Levelling
Tacheometry :Stadia Method
Tacheometry :Tangential Method
Sivapriya Vijayasimhan
6
UNIT II Control Surveying
BENCH MARKS
It is a relatively permanent point of reference whose elevation w.r.t some assumed
datum is known.
BM is used as a starting point for levelling or as point upon which to close as a check.
GTS BM : Great Trigonometric Survey Bench Mark.
In India, elevation of all such BMs are established w.r.t MSL at Karachi.
A bronze plate provided on the top of a concrete pedestal with its elevation engraved
serves as GTS BMs.
GTS BMs are depicted on topo sheets published
Permanent BM : Fixed points of reference , established w.r.t the GTS BM.
Fixed by State Government i.e PWD.
Arbitrary BM : For conducting small projects, arbitrary BMs are assumed.( 100.00m).
In most of the engg. projects, difference in elevation is more important than their RL w.r.t
MSL.
Temporary BM : Established at the end of the day’s work, so that work can be continued
from this point onward.
TBM should be established on permanent points which can be identified easily next day.
Sivapriya Vijayasimhan
7
UNIT II Control Surveying
Azimuth: Angular distance measures
towards the east from the north along
the astronomical horizon to the
intersection of great circle passing
through the point and the astronomical
zeinth with arstronmical horizon
Sivapriya Vijayasimhan
8
UNIT II Control Surveying
Triangulation
• Proposition :that if one side and two angles of a triangle are known, the remaining sides can
be computed
• If the direction of one side is known, the directions of the remaining sides can be
determined
• Triangulation system consists of a series of joined or overlapping triangles in which an
occasional side is measured and remaining sides are calculated from angles measured at the
vertices of the triangles
• The vertices of the triangles are known as triangulation stations
• The side of the triangle whose length is predetermined, is called the base line
• The lines of triangulation system form a network that ties together all the triangulation
stations
• Since a triangulation system covers very large area, the curvature of the earth has to be
taken into account
A
G
B
O
F
E
Sivapriya Vijayasimhan
C
D
9
UNIT II Control Surveying
Triangulation :Objective
Sivapriya Vijayasimhan
10
UNIT II Control Surveying
Triangulation Principle
•Consider two interconnected triangles ABC and BCD. All the angles in both the triangles and
the length L of the side AB, have been measured.
•Also the azimuth θ of AB has been measured at the triangulation station A, whose
coordinates (XA, YA), are known.
•The objective is to determine the coordinates of the triangulation stations B, C, and D by the
method of triangulation
Sivapriya Vijayasimhan
11
UNIT II Control Surveying
Sivapriya Vijayasimhan
12
UNIT II Control Surveying
Sivapriya Vijayasimhan
13
UNIT II Control Surveying
Sivapriya Vijayasimhan
14
UNIT II Control Surveying
Steps in Triangulation Survey
1.
2.
3.
4.
5.
6.
7.
Reconnaissance
Selection of stations and base line
Decision of triangle formation
Erecting of signals and towers
Measurement of base line
Horizontal angles of the triangles are measured
Computations of various sides of triangles
1.Reconnaissance
- Short
and rapid survey
- Factors to be considered
Terrain selection
Selection of site for base line
Suitable triangulation stations
- Needs
Great skill, experience and judgment
- Instruments used
Angle measuring instrument : Theodolite
Bearing Measuring instrument :prismatic compass
Elevation measuring Instrument : Aneroid barometer
Intervisibility testing
Tape, chains, telescope, drawing instrument
Sivapriya Vijayasimhan
15
UNIT II Control Surveying
2.Selection of Triangulation Stations
-
-
Well conditioned traingles nearly equilateral triangles (less than 300 and not more than
1200 )
Stations should be clearly visible from all adjacent stations
Stations should be accessible
Communication facilities
Transportation facilities
Length of site should neither too long nor too small
Selection of station to cover a wide area from main triangulation station so number substations may be controlled
Location should be on firm ground
Line sight should pass through areas free from atmospheric disturbances
Forest area: cutting of woods shld be minimised
Cost of erection of scaffolds and signals shld be minimum
All stations shld be shown on topographic plan on area along their latitudes and longitudes
considering RL of station w.r.t to MSL
Sivapriya Vijayasimhan
16
UNIT II Control Surveying
3.Selection of Triangulation figure or system
-
Magnitude of angles in each individual triangles
Arrangement of triangles
Classification of Triangulation
•First-order triangulation is used to determine the shape and size of the earth or to cover a
vast area like a whole country with control points to which a second-order triangulation
system can be connected.
•Second-order triangulation system consists of a network within a first-order triangulation.
It is used to cover areas of the order of a region, small country, or province.
•Third-order triangulation is a framework fixed within and connected to a second-order
triangulation system. It serves the purpose of furnishing the immediate control for detailed
engineering and location surveys.
Sivapriya Vijayasimhan
17
UNIT II Control Surveying
“
Sivapriya Vijayasimhan
18
UNIT II Control Surveying
Arrangements of Triangles
1.Single chain of triangles
2.Double chain of triangles
3.Central point of figures
4.Quadrilateral or interlacing triangles
1.Single Chain of Triangles
Narrow strip of terrain
Economical and rapid
Adjustment is relatively small
Not accurate for primary work
Sivapriya Vijayasimhan
19
UNIT II Control Surveying
2.Double chain of triangles
Economical and rapid
Similar to single chain
3.Central Point Figure
Cover more area on flat terrain
Figures may be quadrilateral, pentagon or hexagon
Adequate checks
Program is slow
Sivapriya Vijayasimhan
20
UNIT II Control Surveying
4.Quadrilateral or interlacing triangles
Four corner station and observed signal
Forms best figure
Suitable for hilly terrain
Length can be determined by different combination of sides and angles
System is accurate
Selection of best system
1.Atleast one route should be well conditioned triangle
2.Very long length is neglected
3.Independent routes are available
Sivapriya Vijayasimhan
21
UNIT II Control Surveying
C
Well Conditioned Triangles
Error in measurement of angle have minimum effect upon length of
calculated sides
Error in another two sides may affect rest of figure
Two sides are equally accurate: equal length and isosceles triangle
A
θ
c
B
Δ ABC is an isosceles triangle with AB of known length
Sides BC and CA are computed
Triangles is isosceles A = B
By Sine rule
𝑺𝒊𝒏 𝑨
𝒂 = 𝒄 𝑺𝒊𝒏 𝑪1
δA, error in angle measurement
δa1 , error in side a. Differentiate eq 1 by A
𝜹𝒂𝟏 =
𝒄 𝑪𝒐𝒔 𝑨 𝜹𝑨
𝑺𝒊𝒏 𝑪
𝜹𝒂𝟏
𝑪𝒐𝒔 𝑨
=
𝜹𝑨 = 𝜹𝑨 𝐜𝐨𝐭 𝑨
𝒂
𝑺𝒊𝒏 𝑨
Sivapriya Vijayasimhan
2
22
UNIT II Control Surveying
δC, error in angle measurement C
δa2 , error in side a. Differentiate eq 1 by C
𝜹𝒂𝟐 = -
𝑺𝒊𝒏 𝑨 𝑪𝒐𝒔 𝑪
𝜹𝑪
𝑺𝒊𝒏𝟐 𝑪
𝜹𝒂𝟐 𝑪𝒐𝒔 𝑪
= - 𝑺𝒊𝒏 𝑪 𝜹𝑪
𝒂
= −𝜹𝑪 𝑪𝒐𝒔 𝑪
δA and δC probable errors in angles and are equal to ± β
Probable fraction error in side a = ±𝜷 𝑪𝒐𝒕𝟐 𝑨 + 𝑪𝒐𝒕𝟐 𝑪
𝑪 = 𝟏𝟖𝟎° − 𝑨 − 𝑩 = 𝟏𝟖𝟎° − 𝟐𝑨 (𝑪𝒐𝒕𝟐 𝑨 + 𝑪𝒐𝒕𝟐 𝑪shld be minimum)
Differentiate the above equation wrt A and equating to zero
𝟒𝑪𝒐𝒔𝟐A + 2 𝑪𝒐𝒔𝟐 𝑨 − 𝟏 = 𝟎
A = 56⁰14’ (Approximately)
For Practical purpose, equilateral triangle is most suitable
Triangles angle smaller than 300 or greater than 1200shld be avoided
Sivapriya Vijayasimhan
23
UNIT II Control Surveying
Strength of Figure
The U.S. Coast and Geodetic Surveys has developed a convenient method of evaluating the
strength of a triangulation figure
It is based on the fact that computations in triangulation involve use of angles of triangle and
length of one known side
The other two sides are computed by sine law
– For a given change in the angles, the sine of small angles change more rapidly than those of
large angles.
(Angles less than 30° should not be used in the computation of triangulation
If angles less than 30° is used, then it must be ensured that this is not opposite the side
whose length is required to be computed for carrying forward the triangulation series)
Factor to be considered during Triangulation
– Triangulation system within a desired degree of precision
– Deciding the layout of a triangulation system
The square of the probable error (L²) that would occur in the sixth place of the logarithm of
any side, if the computations are carried from a known side through a single chain of
triangles after the net has been adjusted for the side and angle conditions.
The expression for L² is
L² = (4/3)d ²R
d - probable error of an observed direction in seconds of arc
R - shape of figure
Sivapriya Vijayasimhan
24
UNIT II Control Surveying
1
1
Sivapriya Vijayasimhan
25
UNIT II Control Surveying
Sivapriya Vijayasimhan
26
UNIT II Control Surveying
Signals and Towers
- Device erected to define the exact position of an observed station
- A tower is a structure over a station to support the instrument and the observer, and is
provided when the station or the signal, or both has to be elevated
Requirements of Signals
1.
2.
3.
4.
Clearly visible against any background
Feasible to centre accurately over the station mark
Suitable for accurate bisection
Free from Phases
Types of Signals
1.
2.
3.
Daylight or Non-luminous Signals
Sun or Luminous Signals
Night Signals
Sivapriya Vijayasimhan
27
UNIT II Control Surveying
Requirements of Signals
-It should be conspicuous and clearly visible against any background. To make the
signal conspicuous, it should be kept at least 75 cm above the station mark.
-It should be capable of being accurately cantered over the station mark.
-It should be suitable for accurate bisection from other stations.
-It should be free from phase, or should exhibit little phase
Sivapriya Vijayasimhan
28
UNIT II Control Surveying
1. Daylight or Non-luminous Signals
-
Timber post, Masts and tin-cone
Used for sight upto 30 km
For less than 6 km, pole signals are used
2. Sun or Luminous Signals
-
Sun rays reflected to the theodolite (Heliographs and Hebiostats)
Length of sight exceeds 30 km
3. Night Signals
-
Observing the angles of the triangulation system during night
Oil lamps and acetylene lamps
Phase of Signals
- Error of bisection of some type of signals when they are in partly light and partly in
shade
-Common when there are cylindrical signals and when the observer sees the illuminated
portions and bisect it
- Leads to apparent displacement of the centre of signals
- Corrections is required (for bright portion and bright line)
Sivapriya Vijayasimhan
29
UNIT II Control Surveying
1.Observation made on Bright Portion
A – Position of observer
B – Centre of Signal
FD – Visible portion of illuminated surface
AE – line of Sight
E – Mid portion of FD
β –phase correction
Θ1 and Θ2 – angles which extremities of visible portion make with A
α –angle which the direction of sun makes AB
r-radius of signal
D- distance of AB
β = θ1 +
(
)
1
1
θ 2 θ1 = (θ1 +θ 2 )
2
2
r
radians
D
r sin(90° α) r cosα
θ1 =
=
radians
D
D
θ2 =
β=
Sivapriya Vijayasimhan
1 r cosα r r (1 +cosα)
+ =
=
2 D
D
2D
206265r cos2
D
1
α
2 sec onds
30
UNIT II Control Surveying
2.Observation made on Bright Line
Let β be equal to ΔEAB
SE and S1A are parallel
ΔSEA = 180⁰-(α-β)
ΔBEA = 1 ΔSEA =180° 1 [180° (α β)]= 90°+ 1 (α β)
2
2
2
( )
1
ΔEBA =180° (β +ΔBEA) =90°
α +β
2
r cosα
206265r cosα
2 radians=
2 sec
β=
D
D
Correction is applied to observed angle according to the relative position of sun and
signal
Common in cylindrical signals
Sivapriya Vijayasimhan
31
UNIT II Control Surveying
INTERVISIBILITY AND HEIGHT OF STATIONS
• Distance between stations is more or difference in elevation is less – intervisibility
is checked
•
Hence raise both instrument and signal to overcome the curvature of earth and
intervening obstruction
Following condition decide the height of instrument and signal
1. Distance between stations
2. Elevation of stations
3. Intervening Ground
Sivapriya Vijayasimhan
32
UNIT II Control Surveying
1.Distance between stations
No intervening ground
Horizontal distance of visible horizon from station of known elevation
D2
h  (1 - 2m)
2R
h – height of station above datum
D – distance to visible horizon
R – mean radius of earth
m– co-efficient of refraction
0.07 for sights over land
0.08 for sights over sea
Taking D and R in km, m=0.07
h = 0.06735D 2
Sivapriya Vijayasimhan
h in m
33
UNIT II Control Surveying
2.Elevations of Stations
No Obstruction due to intervening ground
Elevation of station at a distance may be calculated, when it can be visible from another
station of known elevation
D2
h  (1  2 m)
2R
h  0.0 6 7 3 5D 2
m=0.07 and R in km
h1  0.0 6 7 3 5D12
h1 – known elevation of station A above datum
D1- distance from A to point of tangency
D – known distance between A and B
D1 =
h1
0 .0 6 7 3 5
D1 = 3.8 5 3 h1
Knowing D1, D2=D - D1
Knowing D2, h2 , the elevation of B above datum is
h2  0.06735D22 (m)
Line of sight shld be atleast 2 to 3 m above
Sivapriya Vijayasimhan
34
UNIT II Control Surveying
3. Intervening Ground
Condition 1 (hc>hc’)
Signal station B has to raised
Intervening ground at C is obstructed by the intervisibility between stations A and B
DA =3.853 hA
Distance DT of peak C from the point of tangency T,
DT  DA - Dc
Sivapriya Vijayasimhan
35
UNIT II Control Surveying
From ΔA’C’C’ and A’B’B” we get
B”
hc "
hB "

Dc
D
D
hB " 
hc "
Dc
hc "  hc - hc '
The required height of signal above station Bo,
BoB” = (BB’ + B’B”) - BBo
= (hB’ + hc”) - hB
Condition 2 (hc’>hc)
Line of sight is clear and assumed it is not obstructed by ground
Sivapriya Vijayasimhan
36
UNIT II Control Surveying
Station Mark
The triangulation stations should be permanently marked on the ground so that the theodolite
and signal may be centred accurately over them.
The following points should be considered while marking the exact position of a triangulation
station :
- The station should be marked on perfectly stable foundation or rock. Generally, a hole 10 to
15 cm deep is made in the rock and a copper or iron bolt is fixed with cement.
- If no rock is available, a large stone is embedded about 1 m deep into the ground with a
circle, and dot cut on it. A second stone with a circle and dot is placed vertically above
the first stone.
- A G.I. pipe of about 25 cm diameter driven vertically into ground up to a depth of one meter
which serves as a good station mark.
- The mark may be set on a concrete monument. The station should be marked with a copper
or bronze tablet. The name of the station and the date on which it was set, should be
stamped on the tablet.
- In earth, generally two marks are set, one about 75 cm below the surface of the ground, and
the other extending a few centimeters above the surface of the ground. The underground
mark may consist of a stone with a copper bolt in the centre, or a concrete monument with
a tablet mark (Fig 1)
Sivapriya Vijayasimhan
37
UNIT II Control Surveying
-The station mark with a vertical pole placed centrally, should be covered with a conical
heap of stones placed symmetrically. This arrangement of marking station, is known
as placing a cairn (Fig 2)
- Three reference marks at some distances on fairly permanent features, should be
established to locate the station mark, if it is disturbed or removed.
- Surrounding the station mark a platform 3 m × 3 m × 0.5 m should be built up of earth.
Figure 1
Sivapriya Vijayasimhan
Figure 2
38
UNIT II Control Surveying
BASE LINES
Longest of the main survey lines.
– Main reference line for fixing the positions of various stations and also to fix the
direction of other lines.
– Accuracy of entire triangulation critically depends on this measurement.
Length of depends on magnitude of triangulation
Check bases are provided at suitable intervals
Location of Base lines
- Ground shld be flat terrain
- Triangulation shld be visible from both ends of base line
- Well proportioned triangles
- Site shld be free from obstructions
- Ground shld be firm( no water gaps and not wider than the length of tape)
- Site shld be possible for extension to primary triangulation
Standards of Length
- International meter
- Meter is marked on three platinum-iridium bars kept in standard conditions
Disadvantage: standard length in metal changes its dimensions
Sivapriya Vijayasimhan
Great Britain
1 Imperial Yard = 0.91439482 m
United States
1 meter = 39.37 inch
India
10 feet bar = 9.9999566 British feet
39
UNIT II Control Surveying
Forms of base measuring apparatus
1.Standarad Tape
-Steel and invar tapes
-Length : 30 to 50 m
-co-eff of expansion does not exceed 9 x 10-7 /0C
2.Straining Device
-End of tape attached to hook of a chain which passes over a block
-Load applied at bottom of chain
3.Spring Balance
-Sensitive and accurate spring balance
4.Thermometers
-To measure temperature of steel tape
5.Steel tape
-For spacing of tripods or stakes
6.Tripod
-For marking and supporting
Sivapriya Vijayasimhan
40
UNIT II Control Surveying
Corrected Length of Base Line
1. Correction for absolute length
2. Correction for temperature
3. Correction for pull or tension
4. Correction for Sag
5. Correction for slope or vertical alignment
6. Correction for horizontal alignment
7. Reduction to mean sea level
1.Correction for absolute length
Actual length of tape ≠ designated length of tape
Ca 
Lc
l
Ca – correction for actual or absolute length
L- measured length of line
C-correction per tape length
I-nominal or designated length of tape
Condition
1. Actual length of tape > nominal length, then then length is too short & correction is
additive
2. Actual length of tape < nominal length, then length is too great and correction is
subtractive
Sivapriya Vijayasimhan
41
UNIT II Control Surveying
2. Correction for temperature
Ct  αTm - To L
Ct – correction for temperature
α- coeff of thermal expansion
Tm-mean temperature in field during measurement
To-temperature during standardisation of the tape
L- measured length of line
Condition
1. Field Temperature > Standardised tape temperature : measured distance is less and
correction is additive
2. Field Temperature < Standardised tape temperature : measured distance is more and
correction is subtractive
Sivapriya Vijayasimhan
42
UNIT II Control Surveying
3. Correction for Pull or tension
P  P0
Cp 
L
AE
Cp – correction for pull
P- pull applied during measurement (kg)
P0-standarad Pull (kg)
A-cross section area of the tape (cm2)
E-Young’s modulus of elasticity (kg/cm2)
L- measured length of line (m)
Condition
1. Pull applied > Standardised tape pull: measured distance is less and correction is
additive
2. Pull applied< Standardised tape pull : measured distance is more and correction is
subtractive
Pull applied in field should be less than 20 times the weight of tape
Sivapriya Vijayasimhan
43
UNIT II Control Surveying
4. Correction for Sag
-sags due to self weight and takes horizontal catenary
-horizontal length is less than length along the curve
Sag correction = horizontal length – measured length
2

8 h  
l1  d1 1  
d 
 
3

 l  


8 h2
C s1  d1 - l1  3 d1
1
2
wl1 d1
wl1d1

2 4
8
wl1d1
h
8P
Ph 
3 (Sub the value of h in eqn 1)
Substituting the values of h in eqn 2
2
2
8 1  wl1d1 
l1 ( wl1 ) 2 l1W
Cs1 


 
3 d1  8 P 
24P 2
24P 2
If l is total length of tape and it is suspended in ‘n’ equal intervals, then the sag correction is
as follows
Cs  nCs1 
Sivapriya Vijayasimhan
2
nlW
24P 2
Cs – tape correction per tape length
W – total weight of tape
l -total length of tape
n -number of equal spans
P -pull applied
44
UNIT II Control Surveying
5. Correction for slope or Vertical Alignment
Distance measured along slope > horizontal distance ( correction is subtractive)
AB – measured inclined length ‘L’
AB1 - horizontal length
h – difference in elevation between ends
Cv – slope correction due to vertical alignment

h2
h2 
C  AB  AB1  L  L  h  L  L1  2  4 
 2 L 8L 
2
2
h2
h4

 3  ..... Slope flatter than 1 in 25, second term is neglected
2 L 8L
h2
C
2L
L1,L2 etc length of successive uniform gradients
H1,h2 etc difference in elevation between the ends
Total slope correction =  h 2
2L
If the slope angle θ is measured instead of h, then correction
Cv  L  L cos  L(1  cos )
Sivapriya Vijayasimhan
Cv  2 L sin 2 
2
45
UNIT II Control Surveying
6.Correction for Horizontal Alignment
In case of base line with obstructions – broken base
Ac – Straight base
AB and BC two section of broken base
Β – exterior angle measured at B
Correction for horizontal alignment,Ch = (a + c) – b
By Sine rule b is given as , b 2  a 2  c 2  2ac cos 
(subtractive)
a 2  c 2  b 2  2ac cos 
2
4
ac
sin
1 2
By adding 2ac on both sides of equation we get (a  c)  b 
( a  c)  b
4ac sin 2 1 2
 Ch 
acb
Sin 1/2β ~ 1/2β and express β in minutes and b ~ (a+c)
ac 2
Ch 
 4.2308108
ac
Sivapriya Vijayasimhan
46
UNIT II Control Surveying
7.Reduction to Mean Sea Level
AB – measured horizontal distance
A’B’ –equivalent length at MSL (D)
h-mean equivalent of base line above MSL
R-radius of earth
Θ – angle subtended at centre of earth, by AB

D
L

R Rh
1
R
Lh
 h
DL
 1    L 
Rh  R
R
Correction, Cmst  L  D  Lh
R
Sivapriya Vijayasimhan
(Subtractive)
47
UNIT II Control Surveying
Measurement of Horizontal Angles
Methods: 1. Repetition Method and 2. Reiteration Method
1.Repetition Method
P
R
1. Measure angle between PQR. Station at Q
2. Use upper screw and tangent set vernier A reading zero
and note vernier B reading
3. Unclamp the upper clamp, turn instrument clockwise about
Θ
inner axis towards R. Clamp upperclamp and bisect R .Vernier
A and B readings are noted
Q
4. Unclamp lower clamp. Turn clockwise to view the target P. Bisect P using lower tangent screw
5. Unclamp the upper clamp, turn telescope clockwise and sight R. Bisect R by upper tangent screw
Elimination of errors
1.Eccentricity of verniers and centres : both vernier readings
2. Inadjustments of line of collimation and trunnion axis are eliminated by taking both face reading
3. Inaccurate graduation :readings at different parts of circle
4.Inaccurate bisection of object: taking different obervations
Sivapriya Vijayasimhan
48
UNIT II Control Surveying
2.Reiteration Method
A
1.Signals are bisected successively and a value is obtained
for each direction of several rounds of observation
2.Several angles at station are measured in terms of direction
of their sides from sn initial station
3.Direction of theodolite are provide with optical micrometer
4.Primary work
B
C
O
D
Elimination of errors
1. Eccentricity errors of vertical axis and microscope are rectified by taking micrometers
2. Imperfect adjustments of line of collimation and horizontal axis are eliminated by both
face readings
3. Graduations are eliminated by reading values of each angle on different parts
4. Error due to manipulation: ½ the observation from left to right and ½ observation from
right to left
5. Accidental error due to bisection and reading are eliminated by taking number of
observation
Sivapriya Vijayasimhan
49
UNIT II Control Surveying
Satellite Station - Reduction to Centre
- To obtain well-conditioned triangle or better visibility, object such as church pier, steeples,
flag pole, tower etc., are selected as triangulation stations.
- Setting up instrument over the such station and observations is difficult to take
- Subsidiary stationary can be termed as satellite station or eccentric station or false station is
selected near to the main stations and measurements are taken
Observations are taken to other triangulation station with same precision of
measurements
- Satellite station is not preferred in primary triangulation
- Corrections are later applied
Correction applied to eccentricity of station – reduction to centre
Distance between true station and satellite station is determined by trigonometric levelling or
by triangulation
Sivapriya Vijayasimhan
50
UNIT II Control Surveying
Let A,B,C - triangulation station
S - satellite station
d-BS – eccentricity between B and S (determined by trignometric levelling or by
triangulation)
Θ-ΔASC = observed angle at S
α-true angle at B
γ-ΔCSB –observed angle at S
β1- ΔSAB
β2-ΔSCB
O-point of intersection of lines AB and CS
Sides AB and BC of ΔABC can be calculated using Sine rule,
BC = 𝒂 =
𝒃𝑺𝒊𝒏 𝑪𝑨𝑩
𝑺𝒊𝒏𝑨𝑩𝑪
and AB=𝒄 =
𝒃𝑺𝒊𝒏𝑨𝑪𝑩
𝑺𝒊𝒏𝑨𝑩𝑪
SB sin ASB d sin(   )

AB
c
SB sin BSC d sin 
CBS , sin  2 

BC
a
sin 1
d sin(   )
d sin(   )
1 


206265
sin 1"
c sin 1"
c
sin  2
d sin 
d sin 
2 


206265
sin 1"
a sin 1"
a
ABS, sin 1 
Sivapriya Vijayasimhan
51
UNIT II Control Surveying
ABC    AOC   2    1   2
  
d sin(   ) d sin 

c sin 1"
a sin 1"
Conditions
Case I : S1 left to B (Figure a)
    1  2
Case II : S2 right to B (Figure b)
    1  2
Case III : S3 between Ac and B (Figure c)
    1  2
Case IV : S4 below to B (Figure d)
    1  2
Sivapriya Vijayasimhan
52
UNIT II Control Surveying
TRIGONOMETRIC LEVELLING
- Observation to find small elevations and short distances (plane survey)
- Observations to find higher elevations and large distances (geodetic survey)
Curvature and Refraction
Effect of Curvature : To make objects sighted to appear lower than the real position
Effect of Refraction: To make objects sighted to appear higher than the real position
Correction
Plane Survey : curvature or refraction or combined correction is applied linearly to the
observed staff reading
Geodetic Survey : curvature or refraction or combined correction is applied to the observed
angles
Sivapriya Vijayasimhan
53
UNIT II Control Surveying
Correction for Refraction
Angle measure at A towards B
Corrected angle BAO'  A' AO'O' AB  1  r
Angle measure at B towards A
Corrected angle ABB2  B' BB2  B' BA  1  r
Correction for refraction is subtractive to angle of elevation
Correction for refraction is additive to angle of depression
Co-efficient of refraction(m)
m=angle of refraction (r)
angle of subtended at centre of earth (θ)
Methods to Determine ‘m’
1.Distance d small and H large
2.Distance d large and H small
Sivapriya Vijayasimhan
54
UNIT II Control Surveying
1.Distance d small and H large
1  1   (1  2m)
2.Distance d large and H small
1  1   (1  2m)
CORRECTION FOR CURVATURE
Correction =

2
(+ve for angle of elevation and -ve for angle of depression)
COMBINED CORRECTION
Combined angular correction =
(1  2m)d
sec
2 R sin 1"
(+ve for angle of elevation and -ve for angle of depression)
Sivapriya Vijayasimhan
55
UNIT II Control Surveying
AXIS SIGNAL CORRECTION
If the height of the signal is not same as that of height of
instrument axis but above the station
( s2  h1 ) cos2 
tan1 
d cos / 2
( s1  h2 ) cos2 
tan 2 
d
(Subtractive)
(Additive)
If vertical angles α and β are very small,
t an 1   1
s 2  h1
sec
d sin 1"
s  h2
 1
sec
d sin 1"
1 
2
After calculating δ1 and δ2 ,
Sivapriya Vijayasimhan
1 (elevation)    1
1 (depression)     2
56
UNIT II Control Surveying
Difference in elevation
Difference of elevation between the stations A and B.
1.Single Observation
2.Reciprocal Observation
1.Single Observation
i. Correction for curvature
ii. Correction for refraction
iii. Correction for axis signal
(Sign of correction depends on angle of elevation or angle of
depression)
Sivapriya Vijayasimhan
57
UNIT II Control Surveying
Angle of elevation
d 

H  d tan1  (1  2m)

2R sin 1" 

Sivapriya Vijayasimhan
Angle of Depression
H  d tan1  (1  2m)
d


2 R sin 1" 
58
UNIT II Control Surveying
Correction to linear Measurement
If α is the observed angle, uncorrected for curvature, refraction, axis signal
H= d tan α – (Height of signal) - (height of instrument) + Curvature correction) (Refraction correction)
d 2 m d2
H  d tan   ( s1  h2 ) 

2R
R
For angle of depression β,
H= d tan α + (Height of signal) - (height of instrument) - Curvature correction) +
(Refraction correction)
d2
H  d tan   ( s1  h2 )  (1  2m)
2R
Sivapriya Vijayasimhan
59
UNIT II Control Surveying
Reciprocal Observation
Observation made from both the station so that the refraction effect is same
More accurate, when ‘m’ value is not known
   1 
d sin  1

 2 
H
   1  
cos 1
 
2
 2
   1 
d sin  1

2


H
   1  
cos 1
 
2
2

Sivapriya Vijayasimhan
+ve for angle of
elevation
-ve for angle of
depression
60
UNIT II Control Surveying
BASE NET
Base lines are shorter than average length of triangle sides
- When there in no possibility to get a favourite site for a longer base
- Difficult and expensive to measure long base line
Connecting shorter base lines to the main triangulations. These group of triangles
meant for extending the base is called base net
Points to be considered
1. Small angles opposite the known side must be avoided
2. Net should have sufficient redundant lines to provide 3 to 4 equations
3. Quickest extension with fewest stations
Sivapriya Vijayasimhan
61
UNIT II Control Surveying
Various forms of Base Extension
Sivapriya Vijayasimhan
62
UNIT II Control Surveying
Criteria for selection of triangulation stations
• Triangulation stations should be inter-visible. For this purpose the station
points should be on the highest ground such as hill tops, house tops, etc.
• Stations should be easily accessible with instruments.
• Station should form well-conditioned triangles.
• Stations should be so located that the lengths of sights are neither too
small nor too long.
• Small sights cause errors of bisection and centering.
• Long sights too cause direction error as the signals become too indistinct
for accurate bisection.
• Stations should be at commanding positions so as to serve as control for
subsidiary triangulation, and for possible extension of the main
triangulation scheme.
• Stations should be useful for providing intersection points and also for
detail survey.
• In wooded country, the stations should be selected such that the cost of
clearing and cutting, and building towers, is minimum.
• Grazing line of sights should be avoided, and no line of sight should pass
over the industrial areas to avoid irregular atmospheric refraction.
Sivapriya Vijayasimhan