May 20, 2015 – Oman Energy and Water Conference
Service Experiences with the World
Record Gas Turbine SGT-8000H
Jens Klingemann
siemens.com/energy
Agenda
 SGT-8000H Introduction
 Fleet Experience / Operational Status
 Service-Friendly Design
 Service Tools
 Summary
Page 2
May 2015
Jens Klingemann
Siemens Large Scale Gas Turbines:
Product Portfolio for 50 Hz and 60 Hz
375 MW
SGT5-8000H
50 Hz
295 MW
SGT5-4000F
172 MW
SGT5-2000E
274 MW
SGT6-8000H
60 Hz
232 MW
SGT6-5000F
112 MW
SGT6-2000E
50 MW
SGT-800
37 MW
SGT-750
SGT-700
33 MW
SGT-600
25 MW
SGT-500
19 MW
SGT-400
14 MW
SGT-300
SGT-200
SGT-100
Heavy-duty gas turbines
Page 3
May 2015
8 MW
7 MW
5 MW
Industrial gas turbines
Jens Klingemann
SGT5/6-8000H engine concept is based on
harmonization and new technology
Siemens V Design
 Single tie bolt
 Compr. stat. design
Harmonized
Compressor
 Turbine cylinder
 Turbine vane carrier
 Exit housing
ULN can-annular
combustion system
Siemens W Design
 Front hollow shaft
 Bearings
 Compressor cylinder
 Turbine features
 Turbine diffuser
Secondary Air
System
The SGT-8000H concept uses proven features from Siemens
and (former) Westinghouse engines and introduces new technology
Page 4
May 2015
Jens Klingemann
Technical innovation as the basis of power and
efficiency increase
Evolutionary 3D blading
4 stages of fast acting variablepitch guide vanes (VGV) allowing
for improved part load efficiency
and high load transients
Advanced Can Annular
combustion system
> 60% combined
cycle efficiency
Proven rotor design
(Hirth serration,
central tie rod, internal
cooling air passages)
for world class fast
(cold) start and hot
restart capability
HCO for reduced
clearance losses
3D Four stage turbine with
advanced materials and
thermal barrier coating
High cycling capability due
to fully internally air cooled
turbine section
Transient protection of clearances
for reduced degradation with
hydraulic clearance optimization
(HCO) active clearance control
Performance features
Flexibility features
Designed for >60% efficiency in combined cycle
and best in class operational flexibility
Page 5
May 2015
Jens Klingemann
Global Fleet Overview of SGT-8000H
50
Hz
60
Hz
15
8
3
15
4
2
8
1
6
• Siemens has sold 62 units* worldwide so far
• H-class fleet has achieved more than 2.200 starts & 131.000 EOH*
* 50Hz and 60Hz combined
Page 6
May 2015
Jens Klingemann
SGT-8000H
Service-Friendly Design
Easy-to-service design features
 Defined combustor handling tool
envelope (blue frame)
 Utilize engine symmetry to
optimize maintenance tasks
 Provides multi-task environment
 Does not require cover lift for
Combustion Inspection
 Access under engine for
tooling installation
 One toolkit for burner and
transition assembly
Page 7
May 2015
Jens Klingemann
Simple and efficient service concept
with three types of inspections
Combustor Inspection
Hot Gas Path Inspection
(Rotor in Place)
Major Inspection
(Rotor in Place)
Page 8
May 2015
Jens Klingemann
SGT-8000H Core Engine
Designed for easy and fast maintenance
All rotating blades including compressor are replaceable
without a rotor lift.
Row 1 Turbine Blades/Vanes/Ring Segments & Row 4
Blades can be replaced with or without cover lift.
Roll out/in capability of the turbine vane carrier enables
exchange of stationary turbine hardware without rotor lift.
Roll out/in capability also allows for optional assembled
spare vane carrier exchange concept which further reduces
outage durations.
Page 9
May 2015
Jens Klingemann
Outage Naming and Duration
Duration* 50Hz
Duration*
60Hz
Combustor Inspection
8 days
7 days
Hot Gas Path Inspection
21 days
21 days
Major Inspection / Outage
29 days
29 days
Major Inspection / Outage
with Rotor Lift
35 days
35 days
-
-
Name
Rotor Inspection
Graphic
* Estimated outage durations for turnkey inspections depending on several conditions (labor, site, etc.)
* Shift model: 6 days per week / 2 shifts per day / 10 hours per shift
* It’s working days only, counted form turning gear off to turning gear on
Page 10
May 2015
Jens Klingemann
SGT- 8000H
Service-Friendly Combustor Maintenance Concept
Benefits
TLC 44 / TLC45 Single Shaft Configuration
 No external crane or other support devices required
 Easy access for Field Service personnel
 Better protection of combustor components against
handling issues
 Pre-assembled burner system for fast installation
 Optimized outage durations due to simultaneous
work flow & packaging
Berlin Factory Test
Similar baskets and similar assembly procedure for transition
Page 11
May 2015
Installation and Container Concept
Combustor components pre-assembled prior to delivery to site!
Jens Klingemann
Burner and Transition Handling Tool Test
Purpose:
Tool
50Hz
60Hz

Dismantling and assembly of transitions
and burners
w/o TLC45
10 d
9d

Dealing with indoor environment
w/ TLC45
8d
7d

Designed for use of Mobile platform and
support cranes
→ 20% reduction in Outage duration
Tool Test 10 / 2013 in Berlin, Germany
Page 12
May 2015
Jens Klingemann
SGT- 8000H Plant Platform Concept
3D Plant Design Model Power Plant Concepts with integrated Service Requirements
1. All power plant components included in the design model
2. Simulation of service activities
3. Optimization of overall power plant concept
Page 13
May 2015
Jens Klingemann
SGT- 8000H Serviceability
3D model supports service requirements
Based on the 3D model the best service concept will be developed and customized, e.g.
1. Rotor Inspection can be conducted on site
2. Upending fixture foundation installed during plant construction
3. Lower cost and higher availability as repair possible without factory visit
Destacking Service Option: upending fixture foundation installed during plant construction.
Page 14
May 2015
Jens Klingemann
Summary: SGT-8000H benefits
Arial 16 pt.,
Experience
& Quality
Line leadership
spacing 1.1@lines
Market
Siemens quality, proven in >131’000* EOH
Fast Outages
Short outage times with use of innovative service tools and concepts
Serviceability
Easy maintenance on site
Cost
Fast Outages
Cost
programs
cost benefit
for tools
customer
Shortreduction
outage times
due toand
innovative
service
*status December 2014
Page 15
May 2015
Jens Klingemann
Service Experiences with the World Record Gas Turbine SGT-8000H
Thank you!
Jens Klingemann
Vice President Sales
Siemens Power Generation Services
Middle East & West Asia
siemens.com/energy