May 20, 2015 – Oman Energy and Water Conference Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann siemens.com/energy Agenda SGT-8000H Introduction Fleet.
Download ReportTranscript May 20, 2015 – Oman Energy and Water Conference Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann siemens.com/energy Agenda SGT-8000H Introduction Fleet.
May 20, 2015 – Oman Energy and Water Conference Service Experiences with the World Record Gas Turbine SGT-8000H Jens Klingemann siemens.com/energy Agenda SGT-8000H Introduction Fleet Experience / Operational Status Service-Friendly Design Service Tools Summary Page 2 May 2015 Jens Klingemann Siemens Large Scale Gas Turbines: Product Portfolio for 50 Hz and 60 Hz 375 MW SGT5-8000H 50 Hz 295 MW SGT5-4000F 172 MW SGT5-2000E 274 MW SGT6-8000H 60 Hz 232 MW SGT6-5000F 112 MW SGT6-2000E 50 MW SGT-800 37 MW SGT-750 SGT-700 33 MW SGT-600 25 MW SGT-500 19 MW SGT-400 14 MW SGT-300 SGT-200 SGT-100 Heavy-duty gas turbines Page 3 May 2015 8 MW 7 MW 5 MW Industrial gas turbines Jens Klingemann SGT5/6-8000H engine concept is based on harmonization and new technology Siemens V Design Single tie bolt Compr. stat. design Harmonized Compressor Turbine cylinder Turbine vane carrier Exit housing ULN can-annular combustion system Siemens W Design Front hollow shaft Bearings Compressor cylinder Turbine features Turbine diffuser Secondary Air System The SGT-8000H concept uses proven features from Siemens and (former) Westinghouse engines and introduces new technology Page 4 May 2015 Jens Klingemann Technical innovation as the basis of power and efficiency increase Evolutionary 3D blading 4 stages of fast acting variablepitch guide vanes (VGV) allowing for improved part load efficiency and high load transients Advanced Can Annular combustion system > 60% combined cycle efficiency Proven rotor design (Hirth serration, central tie rod, internal cooling air passages) for world class fast (cold) start and hot restart capability HCO for reduced clearance losses 3D Four stage turbine with advanced materials and thermal barrier coating High cycling capability due to fully internally air cooled turbine section Transient protection of clearances for reduced degradation with hydraulic clearance optimization (HCO) active clearance control Performance features Flexibility features Designed for >60% efficiency in combined cycle and best in class operational flexibility Page 5 May 2015 Jens Klingemann Global Fleet Overview of SGT-8000H 50 Hz 60 Hz 15 8 3 15 4 2 8 1 6 • Siemens has sold 62 units* worldwide so far • H-class fleet has achieved more than 2.200 starts & 131.000 EOH* * 50Hz and 60Hz combined Page 6 May 2015 Jens Klingemann SGT-8000H Service-Friendly Design Easy-to-service design features Defined combustor handling tool envelope (blue frame) Utilize engine symmetry to optimize maintenance tasks Provides multi-task environment Does not require cover lift for Combustion Inspection Access under engine for tooling installation One toolkit for burner and transition assembly Page 7 May 2015 Jens Klingemann Simple and efficient service concept with three types of inspections Combustor Inspection Hot Gas Path Inspection (Rotor in Place) Major Inspection (Rotor in Place) Page 8 May 2015 Jens Klingemann SGT-8000H Core Engine Designed for easy and fast maintenance All rotating blades including compressor are replaceable without a rotor lift. Row 1 Turbine Blades/Vanes/Ring Segments & Row 4 Blades can be replaced with or without cover lift. Roll out/in capability of the turbine vane carrier enables exchange of stationary turbine hardware without rotor lift. Roll out/in capability also allows for optional assembled spare vane carrier exchange concept which further reduces outage durations. Page 9 May 2015 Jens Klingemann Outage Naming and Duration Duration* 50Hz Duration* 60Hz Combustor Inspection 8 days 7 days Hot Gas Path Inspection 21 days 21 days Major Inspection / Outage 29 days 29 days Major Inspection / Outage with Rotor Lift 35 days 35 days - - Name Rotor Inspection Graphic * Estimated outage durations for turnkey inspections depending on several conditions (labor, site, etc.) * Shift model: 6 days per week / 2 shifts per day / 10 hours per shift * It’s working days only, counted form turning gear off to turning gear on Page 10 May 2015 Jens Klingemann SGT- 8000H Service-Friendly Combustor Maintenance Concept Benefits TLC 44 / TLC45 Single Shaft Configuration No external crane or other support devices required Easy access for Field Service personnel Better protection of combustor components against handling issues Pre-assembled burner system for fast installation Optimized outage durations due to simultaneous work flow & packaging Berlin Factory Test Similar baskets and similar assembly procedure for transition Page 11 May 2015 Installation and Container Concept Combustor components pre-assembled prior to delivery to site! Jens Klingemann Burner and Transition Handling Tool Test Purpose: Tool 50Hz 60Hz Dismantling and assembly of transitions and burners w/o TLC45 10 d 9d Dealing with indoor environment w/ TLC45 8d 7d Designed for use of Mobile platform and support cranes → 20% reduction in Outage duration Tool Test 10 / 2013 in Berlin, Germany Page 12 May 2015 Jens Klingemann SGT- 8000H Plant Platform Concept 3D Plant Design Model Power Plant Concepts with integrated Service Requirements 1. All power plant components included in the design model 2. Simulation of service activities 3. Optimization of overall power plant concept Page 13 May 2015 Jens Klingemann SGT- 8000H Serviceability 3D model supports service requirements Based on the 3D model the best service concept will be developed and customized, e.g. 1. Rotor Inspection can be conducted on site 2. Upending fixture foundation installed during plant construction 3. Lower cost and higher availability as repair possible without factory visit Destacking Service Option: upending fixture foundation installed during plant construction. Page 14 May 2015 Jens Klingemann Summary: SGT-8000H benefits Arial 16 pt., Experience & Quality Line leadership spacing 1.1@lines Market Siemens quality, proven in >131’000* EOH Fast Outages Short outage times with use of innovative service tools and concepts Serviceability Easy maintenance on site Cost Fast Outages Cost programs cost benefit for tools customer Shortreduction outage times due toand innovative service *status December 2014 Page 15 May 2015 Jens Klingemann Service Experiences with the World Record Gas Turbine SGT-8000H Thank you! Jens Klingemann Vice President Sales Siemens Power Generation Services Middle East & West Asia siemens.com/energy