Philippe BLOCH Seureca MD PAEW’s Water Sector Master Plan Richard Burd – Hydraulic and Asset Management Expert Guillaume Merere – Water Planning Manager Oman Energy.
Download ReportTranscript Philippe BLOCH Seureca MD PAEW’s Water Sector Master Plan Richard Burd – Hydraulic and Asset Management Expert Guillaume Merere – Water Planning Manager Oman Energy.
Philippe BLOCH Seureca MD PAEW’s Water Sector Master Plan Richard Burd – Hydraulic and Asset Management Expert Guillaume Merere – Water Planning Manager Oman Energy and Water Exhibition & Conference Integrated Veolia Consulting Engineers’ PAEW’s Water Sector Master Plan: Why? Group o Main challenge: expand coverage by pipe supply – est. at 57% today in PAEW’s service area o Follow rapid changes in Oman: population (+3.5% p.a.), changes in population repartition across the country (urban centres, new developments eg. Duqm), life habits (habitat, water consumptions) o Anticipate and revise constantly the forecast (eg. new population forecast 2014 by NCSI) and the solutions… o …proposing secure systems, from production to transmission to distribution…. and improving efficiency Oman Energy & Water 2 Agenda for Veolia today Consulting Engineers’ Group Integrated o Building the PAEW strategic hydraulic model o A dynamic water demand forecast tool allowing for comprehensive regional projections o Security of supply and concept designs from strategic to local level o CAPEX programme planning and delivery o Concluding remarks: planning as a live and continuous process in the organization Oman Energy & Water 3 PAEW’s Water Sector Master Plan o Building the PAEW strategic hydraulic model o A dynamic water demand forecast tool allowing for comprehensive regional projections o Security of supply and concept designs from strategic to local level o CAPEX programme planning and delivery o Concluding remarks: planning as a live and continuous process in the organization 4 Building theVeolia PAEWConsulting hydraulic model Integrated Engineers’ Group o Step 1 – Schematics of the Network Oman Energy & Water 5 Building theVeolia PAEWConsulting hydraulic model Integrated Engineers’ Group o Step 2 – Data Collection Oman Energy & Water 6 Building theVeolia PAEWConsulting hydraulic model Integrated Engineers’ Group o Step 3 – Strategic Model Oman Energy & Water 7 Building theVeolia PAEWConsulting hydraulic model Integrated Engineers’ Group o Step 4 – All mains model of Muscat Oman Energy & Water 8 Building theVeolia PAEWConsulting hydraulic model Integrated Engineers’ Group o Step 5 – Regional All mains models Using AutoCAD, Google Earth and Billing Data o Step 6 – Join them up as one model Oman Energy & Water 9 PAEW’s Water Sector Master Plan o Building the PAEW strategic hydraulic model o A dynamic water demand forecast tool allowing for comprehensive regional projections o Security of supply and concept designs from strategic to local level o CAPEX programme planning and delivery o Concluding remarks: planning as a live and continuous process in the organization 10 Regional Projections Integrated Veolia Consulting Engineers’ Group o Regional Models constitute a comprehensive forecast of the distribution systems in each region o Lengths of networks, based on existing infrastructure, acquired networks, new PAEW projects o water demand and population coverage, including population growth as well as customers integrated through acquired networks and projects o Non domestic demand, including tankers and “Special Demand” eg. Sohar o Outputs by governorate and wilayat Oman Energy & Water 11 Regional Projections Integrated Veolia Consulting Engineers’ Group o Architecture Oman Energy & Water input output 12 Regional Projections Integrated Veolia Consulting Engineers’ Group o Updated annually in PAEW o Changes in PAEW (customers, unit consumptions, strategies incl. NRW, projects planning, etc.) o Changes outside of PAEW (population, new strategic projects, eg. Batinah Logistic Hub, Oman University, etc) o Vision 2040 – Supreme Council for Planning o Internalization of planning function (Veolia strategy) o Technical support + knowledge transfer Oman Energy & Water 13 Regional projections + Strategic hydraulic model = long term Strategic Planning Prioritized service expansion programme Regional projection model (demand, etc.) Strategic Hydraulic Model Strategic backbone (Strategic networks, storage, PS) SEURECA Annual Meeting - March 2015 - PAXTON Ferrières-en-Brie 14 PAEW’s Water Sector Master Plan o Building the PAEW strategic hydraulic model o A dynamic water demand forecast tool allowing for comprehensive regional projections o Security of supply and concept designs from strategic to local level o CAPEX programme planning and delivery o Concluding remarks: planning as a live and continuous process in the organization 15 Security of supply Integrated Veolia Consulting Engineers’ Group o Criticality ranking and analysis Oman Energy & Water 16 Security of supply Integrated Veolia Consulting Engineers’ Group o From the strategic level Oman Energy & Water 17 Security of supply Integrated Veolia Consulting Engineers’ Group o To the local operational modelling Oman Energy & Water 18 PAEW’s Water Sector Master Plan o Building the PAEW strategic hydraulic model o A dynamic water demand forecast tool allowing for comprehensive regional projections o Security of supply and concept designs from strategic to local level o CAPEX programme planning and delivery o Concluding remarks: planning as a live and continuous process in the organization 19 CAPEX Programme Integrated Veolia Consulting Engineers’ Group o PAEW Strategy and Master Plan: 150 MOMR CAPEX per year o 2.5 Billion OMR CAPEX to be delivered between 2016 and 2040 (2011 value) – excluding IWP/IWPP (OPWP) o Oman Energy & Water 20 CAPEX Programme Integrated Veolia Consulting Engineers’ Group o Distribution networks: x3 by ~2035 PAEW – projected Length of network Oman Energy & Water 21 CAPEX Programme Integrated Veolia Consulting Engineers’ Group o Strategic transmission reinforcements planned across entire service area: o Muscat: ongoing, from Qurayyat / Wadi Dayqah to Seeb, through Al Amrat, Muscat East and West o Dhahirah interconnection with MIS o Reinforcements and extensions in Sharqiyah, Dakhliyah, Batinah, Musandam, Al Wusta Oman Energy & Water 22 CAPEX Programme Integrated Veolia Consulting Engineers’ Group o Production – close coordination with OPWP o In the last 4 years, water put into supply increased by 60,000 m3/d yearly avg. o 2015: New Ghubrah o 2016:Sur extension o 2017: Qurayyat desalination Oman Energy & Water o 2018: Sohar, Barka o … 23 PAEW’s Water Sector Master Plan o Building the PAEW strategic hydraulic model o A dynamic water demand forecast tool allowing for comprehensive regional projections o Security of supply and concept designs from strategic to local level o CAPEX programme planning and delivery o Concluding remarks: planning as a live and continuous process in PAEW 24 Concluding remarks: Integrated Veolia Consulting Engineers’ Group « … when a plan comes together » o Live tools o Adaptable to a changing environment o Serving a variety of purposes o Internalization of strategic functions in PAEW - Training and knowledge transfer o Plan is dependent in particular on population growth forecast and also on continuing efforts in terms of NRW reduction and demand management Oman Energy & Water 25 شكراً لحسن إصغائكم Thank you for your attention