VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION JON CHENEY, TRAFFIC ENGINEER Traffic Engineering Organizational Chart Traffic Engineer Jon Cheney, P.E. Traffic Studies Traffic Signals Traffic Counts & Studies Computerized Signal Systems Development Review Isolated Signals Crash.

Download Report

Transcript VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION JON CHENEY, TRAFFIC ENGINEER Traffic Engineering Organizational Chart Traffic Engineer Jon Cheney, P.E. Traffic Studies Traffic Signals Traffic Counts & Studies Computerized Signal Systems Development Review Isolated Signals Crash.

VOLUSIA COUNTY
PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION
JON CHENEY, TRAFFIC ENGINEER
Traffic Engineering Organizational Chart
Traffic Engineer
Jon Cheney, P.E.
Traffic Studies
Traffic Signals
Traffic Counts
& Studies
Computerized
Signal
Systems
Development
Review
Isolated Signals
Crash Data
Mgmt System
School Flashers
Administration
Employees: 20 (5 currently vacant)
Transportation
Planning
Holly Hill TMC
What do we do??
Traffic signals and
systems design,
construction and O&M
Development, Rezoning,
Land Use Amendments,
& Use Permits
Short & Long range
planning of key
countywide roads & Levelof-Service of roads
Engineering studies to
justify signs & markings
Traffic Engineering Division
Provides for the safe and efficient movement of
both vehicular and pedestrian traffic throughout the
County.
• 533 traffic signals and flashers
• Traffic Management
• 24 coordinated traffic
signal systems
• 21 local & 100 traffic
monitoring cameras
• Reduced Speed School Zone
signals
Consolidated Services Countywide;
except Daytona Beach
Challenges
Special Events
Disasters &
Evacuations
Photos provide by Daytona News-Journal
Challenges - Growth
Volusia County Population Growth Rate
6%
• New Economy
• New Issues
• New Strategies
5%
4%
Growth Rate
4%
3%
2%
0.6%
1%
Growth Rate
1%
0%
1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040
Source: Bureau of Business and Economic Research
Challenges:
Transportation System Needs
A variety of sources used to develop system, mainly consisting
of:









2025 Volusia County MPO’s LRTP
2035 LRTP: E+C Model Runs, Subcomm. Input & Make Your Mark
Workshop
2007 County Needs Plan & Economic Development
myRegion.org & East Central Florida RPC effort
2050 FDOT Max # of Lanes analysis
SE Volusia Regional Transportation Study
SW Volusia Regional Transportation Study
Volusia County 5-Year Road Program: City Mtgs, Zone Mtgs,
Council Workshop, Annual County Budget
Annual County CIE Report to DEO
Challenges:
Transportation System Needs
A variety of sources used to develop system, mainly consisting
of:









2025 Volusia County MPO’s LRTP
2035 LRTP: E+C Model Runs, Subcomm. Input & Make Your Mark
Workshop
2007 County Needs Plan & Economic Development
myRegion.org & East Central Florida RPC effort
2050 FDOT Max # of Lanes analysis
SE Volusia Regional Transportation Study
SW Volusia Regional Transportation Study
Volusia County 5-Year Road Program: City Mtgs, Zone Mtgs,
Council Workshop, Annual County Budget
Annual County CIE Report to DCA
Challenges:
Transportation
Needs - Congestion
2050
Roadway Deficiencies
Future Conditions
• The transportation network and the
traffic volumes are based on 2050
Central Florida Regional Planning
Model (CFRPM)
• The population and employment data is
based on the CFRPM
• Model generated V/C ratios are used
to determine network deficiencies
Challenges:
Transportation System Needs
NOT Funded System Needs
– highlighted in yellow
Needs Plan migrating to
STRATEGIC PLAN due
to fiscal constraints
Traffic Engineering Division
Current Issues
• Update to 20 Year MPO Long Range Transportation Plan & new Federal
MAP-21 Transportation Bill
• 6 of 7 Council members on MPO Board
• Comprehensive Plan Amendments (additions/deletions to County
Thoroughfare System)
• Growth Management Legislation vs Economic Development
• Cost Saving & Greenhouse Gas Reduction Programs:
• Signal power – County LED’s replacement complete
City LED replacement underway
135 watts vs 10 watts
• Next Step in traffic technology - Adaptive Signal Control
• Signal Retiming (system & isolated)
• Sunrail – VOTRANs customer delivery to station on-time
• Variable work load in cities
QUESTIONS?