East Pelham TS Project Alabaster SS E. Pelham – Alabaster SS 115kV TL 2009 W-1 Carriere Southwest 230/115 kV Project New Kiln – Carriere SW.
Download ReportTranscript East Pelham TS Project Alabaster SS E. Pelham – Alabaster SS 115kV TL 2009 W-1 Carriere Southwest 230/115 kV Project New Kiln – Carriere SW.
East Pelham TS Project Alabaster SS E. Pelham – Alabaster SS 115kV TL 2009 W-1 Carriere Southwest 230/115 kV Project New Kiln – Carriere SW 230 kV T.L. 2010 W-2 C.A.E.S. Generation Addition / APCO TL Impacts 2010 W-3a 356 MW GENERATION ADDITION TOTAL GENERATION CAPACITY = 694 MW (12-31-2010) CIBA SPECIALTY CHEMICALS BAY GAS PRAXAIR WASHINGTON CO. CO-GEN CT ST OLIN CORP. WEST MCINTOSH T.S. C.A.E.S. MCINTOSH T.S. “B” LINE TATE & LYLE SUCRALOSE 2011 Summer Peak Washington County #1 Off Loss of West McIntosh – C.A.E.S. 115 kV TL McIntosh T.S. – C.A.E.S. 115kV TL Bundled (2) 795 45/7 ACSR, R = 2126 A TL Loading = 122% (2602 A) 2010 Winter Loading = 106% (2489 A) BARRY S.P. ELLICOTT T.S. BARRY S.P. Planned Improvements for McIntosh Area 2010 W-3b UPGRADE THE C.A.E.S. AND BARRY “B” 115KV TERMINALS AT MCINTOSH T.S. TO 3000A. UPGRADE TRANSFER SWITCHES AND BREAKERS TO 3000A. (12-31-2010) CIBA SPECIALTY CHEMICALS BAY GAS PRAXAIR WASHINGTON CO. CO-GEN CT C.A.E.S. ST LOWMAN WEST MCINTOSH T.S. “B” LINE MCINTOSH SW OLIN CORP. TATE & LYLE SUCRALOSE LOOP BARRY S.P. – MCINTOSH T.S. “B” 115KV TL INTO C.A.E.S. (POWERSOUTH TO CONVERT BUS AT C.A.E.S. TO A BREAKER AND HALF) (12-31-2010) BARRY S.P. MCINTOSH T.S. TL RECONDUCTOR: MCINTOSH T.S. – BAY GAS – C.A.E.S. 115KV CIRCUIT #2 1.47 MI BUNDLED (2) 795 26/7 ACSS, R = 2908A (Spring 2010) TL RECONDUCTOR: MCINTOSH T.S. – C.A.E.S. 115KV CIRCUIT #1 1.47 MI BUNDLED (2) 795 26/7 ACSS, R = 2908A (Fall 2010) ELLICOTT T.S. BARRY S.P. Laguna Beach 230 / 500 kV Substation Laguna Beach Substation 2011 W-4 Laguna Beach – Holiday 115 kV T.L. 2011 W-5 Holiday – Hathaway Tap 115 kV T.L. Laguna Beach – Holiday 115 kV Line Holiday – Hathaway Tap 115 kV Smith – Laguna Beach 115 kV Transmission Line 2011 W-6 Smith – Laguna Beach Line Conversion to 230 kV Networked Mobile 115 kV Transmission System RACETRACK DS 2012 W-7 LOTT ROAD NORTH MOBILE SEMMES DS CHICKASAW #4 (2015) #5 (2015) #1 #6 (2015) N CRICHTON SS #3 (2014) ORCHARD WOLF RIDGE ALPINE SCHILLINGER RD SPRINGHILL DS WHEELERVILLE CRICHTON #7 (2015) BEL AIR BIG CREEK SOUTH MOBILE DS U.S.A. W. GRELOT RD SPRINGDALE DS PROVIDENCE #8 (2015) MICHAEL BLVD DS GRELOT RD SNOW RD DS DAWES DS McDUFFIE ISLAND SKYLAND DS COTTAGE HILL DS NAVCO DS LYNNDELL DS #2 (2012) #10 (2016) DEMETROPOLIS DS HALLS MILL RD DS DOG RIVER DS CLOVERLEAF DS #9 (2015) DEE’S DS KRONER DS THEODORE DS NORTH THEODORE Shoal River – Santa Rosa – Laguna Beach 230 kV T.L. 2012 W-8 New Shoal River – Santa Rosa 230 kV TL (73 miles) Shoal River Substation Laguna Beach Substation Santa Rosa Substation 2013 W-9 2013 W-10 Hillabee – Danway S.S. 230 kV T.L. Upgrade Hillabee – North Opelika 230 kV T.L. Upgrade Hillabee Upgrade Hillabee – North Opelika 230kV Line – 38 miles Upgrade Hillabee – Danway 230kV Line – 32 miles Danway SS N. Opelika N. Auburn Goatrock Franklin CC Barry – Chickasaw 230 kV T.L. Reconductor the Barry – Chickasaw 230 kV TL (19.2 miles) 2013 W-11 Plant Greene County Substation 2013 W-12 Green County – Duncanville 230 kV T.L. CPL EPES MANNINGTON WOOD FLOORS Add 400MVA 230 / 115 kV Autobank EPES Greene County – Meridian NE 230LIVINGSTON kV T.L. BIRDEYE D.S. PLANT GREENE COUNTY BIRDEYE T.S. DEMOPOLIS WEST CEMEX DEMOPOLIS BELLAMY S.S. BELLAMY CUBA BW EMC COATOPA GreenSONAT Co.GALLION – N. Selma 230 kV T.L. FAUNSDALE DEMOP. IND. PK. ROCK –TENN SONAT YORK Greene County – Sykes S.S. 230 kV T.L. LINDEN Pinckard – Slocomb 115 kV T.L. Slocomb – AL / FL Line 115 kV T.L. Rebuild Pinckard – Slocomb – Holmes Creek 115 kV TL (23 miles) 2013 W-13 2014 W-14 Snowdoun – Pike Co. 230 kV T.L. 2014 W-15 Madison Park W. Montg Montg. SS S. Montg Dixie ECI Cecil Hope Hull Snowdoun Upgrade 32.42 miles Snowdoun – Pike Co 230kV Union TL to 100ºC Springs Pike Co Troy S.S City of Troy Luverne Kemper County Generation 2014 W-16 Gaston – East Pelham 230 kV T.L. Gaston – Twelve Oaks – E. Pelham 230 kV TL 2009 W-17 2016 W-18 Tuscaloosa Solution Phase 2 PLANT GORGAS TAYLORS FERRY SONAT EL PASO LAKELAND YACHT CLUB CARROLLS CREEK STANSEL BANKHEA D DAM KELLERMAN JWR #4 GORDO TO GORDO J.W. #5 FAYETTE TUSC. HWY. T.S. HOLT DAM HOLT T.S. HUNT OIL GOODRICH BLACK WARRIOR EUTAW HWY ROMULUS ALICEVILLE SHOAL CREEK STOKES LAKEVIEW MERCEDES SOUTH TUSC. T.S. BRADLEY ROAD SOUTH BESSEMER T.S. ENGLEWOO D BIG SANDY BLACK WARRIOR LEWISTON DUNCANVILLE S.S. South Tuscaloosa T.S. COLONIAL D.S. CPL MOUNDVILLEGULF STATES PAPER EUTAW PPL AKRON CPL EPES EPES T.S. MANNINGTON WOOD FLOORS LIVINGSTON BIRDEYE T.S. BIRDEYE D.S. New South Duncanville 230 / 115kV Substation PLANT GREENE COUNTY 1257 MW Generation New Epes – Eutaw 115 kV T.L. (22.5 miles) Barry – Crist 230 kV T.L. 2016 W-19 Upgrade Barry – Crist 230 kV T.L. to 125 degree C Operation from Alabama State Line to Plant Crist Orange Grove 230/115 kV Substation Project 2017 W-20 Reconductor 2.5 mile 230 kV Line with 1033 ACSS at 200°C Elmore County Area 2019 W-21 Gaston Steam Plant New Elmore County 800MW CC Plant 2019 W-22 New 30 mile Elmore CountyMadison Park 230 kV Line Bouldin Dam Wetumpka TS Elmore Russell Coosa 1 & 2 ECI Speigner County Line Rd Reconductor County Line Road – Elmore County 230 kV Line – 18.2 miles Prattville ECI Wetumka DS Cent AL ECI Redland Rd Robinson Springs Millbrook Prattville Prattmont E. Prattville S. Prattville Madison Park TS IP Prattville Madison Park Forbes Rd N. Mont . Hunter SS Maxwell West Mont AFB Jeff St Autaugaville Mont SS Montgomery WW To Snowdoun Washington Holt St Park Gunter Park Gunter AFB Capitol Heights S. Gunter Park E. Mont. State Capitol Carter Hill Masonic. Rd Home Eastdale AUM Woodmere Mt Meigs Dixie ECI Arrowhead 2011 PS-1 Liberty– Defuniak 115 kV T.L. Liberty Defuniak Dale County – Bay Springs Junction Dale County Bay Springs 2011 PS-2 Upgrade line to 100 deg C operation (167) MVA Clio Area Upgrades 2012 PS-3 Current 62 MVA Path limited under contingencies Current 62 MVA Path limited under contingencies 2012 PS-4 Baldwin County Alabama MIFLIN JCT. Wolf Bay Miflin Junction New 115 kV line 115 kV line Uprate Capacitor Additions Florida Avenue Brewton – Freemanville 115 kV T.L. Uprate line to 100 deg C operation (142 MVA) Brewton Freemanville 2012 PS-5 Northern System Voltage Problem Gantt-Fuller 115 or 230kV line 2014 PS-6 Cole Road Transformer 2009 SME-1 Polkville 161 kV Source 2010 SME-2 Purvis Bulk Transformer Upgrade 2010 SME-3 Silver Creek Interconnection 2011 SME-4 Moselle 161 kV Generation Expansion 2012 SME-5 South Hoy 161 kV Source 2012 SME-6 Prentiss 161 / 69 kV Substation 2013 SME-7 East Waynesboro 230 / 69 kV 2017 SME-8