Transcript Province of Terni
LARISSA 27-28 September 2007
PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk
Adopted by DCP 127 18/07/05
Landslide risk
Adopted by DCP 89 18/09/06
Seismic risk
Adopted by DCP 79 17/09/07
CIVIL PROTECTION PLAN
SEISMIC HAZARD funded by MEDACTHU
www.provincia.terni.it/protezionecivile
PLAN STRUCTURE
Territorial Informations Seismic hazard Seismic classification Anthropic arrangment items and their vulnerability Expected seismic event scenario
Operating cartography
DAMAGE SCENARIOS EVALUATION INTERVENTION MODEL Organizational structure Procedures
DATABASE OF AVAILABLE RESOURCES
DAMAGE SCENARIOS EVALUATION
Census of high risk buildings and of infrastructural strategic works.
Study of the vulnerability of the public structures, in particular of schools, in function of the characteristic parameters of every building: period of construction, constructive and typologic characteristics.
Development of one methodology of analysis of statistical type
PLAN STRUCTURE
INTERVENTION MODEL
Organizational structure
Command and Control System Operating centres
PREFECTURE OF TERNI 33 Municipal Operating Centre 4 Intermunicipal Operating Centre
14 Support Functions Monitoring system
National Monitoring system INGV
Comunication system
Procedures
Intervention phases
Specific meetings have been organized with all municipality with the aim to analyze the city structure of every municipal territory, therefore to characterize the exact positioning of meeting point in case of an earthquake for people and the ways of exodus. Several meetings have been organized with all the subjects interested (about 100) for the definition of common procedures to adopt in an earthquake emergency, reaching to a shared model. A protocol of understanding among the Province of Terni, Prefecture, local and regional authorities and volunteers has been signed for the definition of the modalities of a management after an earthquake sharing standardized procedures.
EARTHQUA KE ALLARM PHASE
I EMERGENCY PHASE SCENARIO TYPE 1 I>VII SCENARIO TYPE 1 SCENARIO TYPE 2 ALLARM PHASE • This phase begins after an earthquake • Each authority puts the procedures into practice • Each authority communicates to Prefecture about the damages further to eartyhquake • Prefecture establishes the real seismic effect SCENARIO TYPE 1 Seism V - VII (Mercalli scale)- Magnitude 3,5 - 5. EMERGENCY PHASE SCENARIO TYPE 2 Seism >VII Mercalli Scale - Magnitude > 5 LIKE Umbria-Marche Earthquake 26.09.97 (10 years ago) First main shock = VIII Mercalli (5,6 R) time: 02:33 Second main shock = IX Mercalli (5,8 R) time: 11:40 Over 2.000 aftershock in 15 days Over 20.000 homeless Like Vulcain scenario, a second mainshock ( IX Mercalli -5,8 R), during rescue activities, caused a lot of damages and death of 4 persons during an inspection to assess damages on the Abbey ALLARM PHASE EMERGENCY PHASE SCENARIO TYPE 1 EMERGENCY PHASE SCENARIO TYPE 2 WHO SIGNED THE PROTOCOL OF UNDERSTANDING •Province of Terni •Prefecture of Terni •Region of Umbria •Firebrigades •Municipalities •Local Authorities •Italian Red Cross •Volunteers •Police •Traffic Police •Provincial Headquarters of Carabinieri •Local health authorities •Road operator •Railway operatorASSISI ABBEY
26.09.07 - 11:40
FOLIGNO
The emergency plan contains each action for each authority Prefecture, local and regional authorities and volunteers know what they have to do thanks to a set of forms