Province of Terni

Download Report

Transcript Province of Terni

LARISSA 27-28 September 2007

PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk

Adopted by DCP 127 18/07/05

Landslide risk

Adopted by DCP 89 18/09/06

Seismic risk

Adopted by DCP 79 17/09/07

CIVIL PROTECTION PLAN

SEISMIC HAZARD funded by MEDACTHU

www.provincia.terni.it/protezionecivile

PLAN STRUCTURE

Territorial Informations Seismic hazard Seismic classification Anthropic arrangment items and their vulnerability Expected seismic event scenario

Operating cartography

DAMAGE SCENARIOS EVALUATION INTERVENTION MODEL  Organizational structure  Procedures

DATABASE OF AVAILABLE RESOURCES

DAMAGE SCENARIOS EVALUATION

Census of high risk buildings and of infrastructural strategic works.

 Study of the vulnerability of the public structures, in particular of schools, in function of the characteristic parameters of every building: period of construction, constructive and typologic characteristics.

 Development of one methodology of analysis of statistical type

PLAN STRUCTURE

INTERVENTION MODEL

Organizational structure

 Command and Control System  Operating centres

PREFECTURE OF TERNI 33 Municipal Operating Centre 4 Intermunicipal Operating Centre

 14 Support Functions  Monitoring system

National Monitoring system INGV

 Comunication system

Procedures

 Intervention phases

Specific meetings have been organized with all municipality with the aim to analyze the city structure of every municipal territory, therefore to characterize the exact positioning of meeting point in case of an earthquake for people and the ways of exodus. Several meetings have been organized with all the subjects interested (about 100) for the definition of common procedures to adopt in an earthquake emergency, reaching to a shared model. A protocol of understanding among the Province of Terni, Prefecture, local and regional authorities and volunteers has been signed for the definition of the modalities of a management after an earthquake sharing standardized procedures.

EARTHQUA KE ALLARM PHASE

I

EMERGENCY PHASE SCENARIO TYPE 1

I>VII

SCENARIO TYPE 1 SCENARIO TYPE 2

ALLARM PHASE

• This phase begins after an earthquake • Each authority puts the procedures into practice • Each authority communicates to Prefecture about the damages further to eartyhquake • Prefecture establishes the real seismic effect

SCENARIO TYPE 1

Seism V - VII (Mercalli scale)- Magnitude 3,5 - 5.

EMERGENCY PHASE SCENARIO TYPE 2

Seism >VII Mercalli Scale - Magnitude > 5

LIKE Umbria-Marche Earthquake 26.09.97 (10 years ago) First main shock = VIII Mercalli (5,6 R) time: 02:33 Second main shock = IX Mercalli (5,8 R) time: 11:40 Over 2.000 aftershock in 15 days Over 20.000 homeless

ASSISI ABBEY

26.09.07 - 11:40

Like Vulcain scenario, a second mainshock ( IX Mercalli -5,8 R), during rescue activities, caused a lot of damages and death of 4 persons during an inspection to assess damages on the Abbey

FOLIGNO

The emergency plan contains each action for each authority Prefecture, local and regional authorities and volunteers know what they have to do thanks to a set of forms

ALLARM PHASE EMERGENCY PHASE

SCENARIO TYPE 1

EMERGENCY PHASE

SCENARIO TYPE 2

WHO SIGNED THE PROTOCOL OF UNDERSTANDING

•Province of Terni •Prefecture of Terni •Region of Umbria •Firebrigades •Municipalities •Local Authorities •Italian Red Cross •Volunteers •Police •Traffic Police •Provincial Headquarters of Carabinieri •Local health authorities •Road operator •Railway operator