Overview
MT Continuum overview
• Application to other communities
• Project status
• Lessons learned for other NETC
communities
•
MT Continuum Project
•
Strategic Systems Programs (SSP) re-engineering 30+ week
training pipeline for TRIDENT Ballistic Submarine (SSBN)
Missile Techs (MTs) into blended just-enough/just-in-time ILEconformant Instructor Led (ILT) and self-paced segments
•
AIM CPM and LO Module toolsets part of SSP’s baseline
business process for this re-engineering
•
First major end-to-end design, development, and maintenance
project that’s defining CPM/LO Module business rules and data
exchange mechanisms
•
MT Continuum team:
–
–
–
–
–
SSP - Requirements Owners
Contractor team – ILT dvlp, self-paced input, SMEs
NAWCTSD / AIM team - CPM/LO Module support
LSI, Inc. - ISD and self-paced content design/development
CFS – CM/QA agent for SSP
Application to Other Communities
•
Based on NETC-mandated JDTA as fleet performance
requirement basis for learning content design and
development
•
Closely coordinated with NAVEDTRA 136 development
•
Hands-on production phase development of complete LO
Module ILT lessons/sections and design of self-paced
lessons/sections
•
Integrated development and maintenance environment for
blended, SCORM and 136-compliant learning content
•
Bi-directional interface between LO Module and LSI
Venus.net CBT toolset for self-paced development/maint.
Project Status
•
•
Plan, Analyze and Design Completed
–
JDTA
–
Establishment of initial 3 major projects
–
Revised 9-project structure

Approval of learning objectives

Ongoing development of ISD considerations elements as part of
script-storyboard effort
Development (production) Phase underway 15 May 11
–
9 projects exported from CPM to LO Module for production
development in AIM I Rel 5.0 on fedsun
–
SWS AIM I instance to transition to NETPDTC hosting by 1 Oct
11
Lessons Learned for Other NETC
Communities
•
Completion of supporting documentation in Design
Phase is crucial – (IMDP, ASDD, process documents)
•
Establish standard for estimating TTT in Design
Phase
•
Establish change request process in Design Phase
•
Complete Development IMS/POA&M in Design
Phase – better activity duration estimates for
process steps.
Questions?
Backup Slides
Issues/Concerns
•
“End to end” surveillance/maintenance test on TLO/ELO
in process to:
–
confirm existing change impact identification functionality in
CPM and LO Module
–
identify near-term updates
–
refine longer-term enhancements

Testing begun by Mark Campbell and Mike Lueken (LMMS) w/
favorable results

Identified critical issues addressed as part of AIM I Rel 5.0

Further testing surveillance testing on LDC is still required and ongoing
with Rel 5.0 by Jamie Swaim (CSF)

Team continues to refine versioning business rules/process
Modernized AIM
Technical Data Repository
Links to Authoritative Tech Data /
Updates
Performance
Reqts
(Navy Job Duty
Task Analysis /
Competency
data)
Baseline
Performance
Reqts
Performance
Reqts
Updates
Learning
Content
Planning
and Design
(learning objectives,
content outline,
content mgmt data)
Content
Outline Draft
w Versioned
Learning
Objectives
and Metadata
Versioned
Learning
Objective
Updates
[CPM]
AIM focus
areas
Other govt
repositories
COTS/GOTS
CBT toolsets
Change
Impact
Reporting
(based on
performance
reqts updates;
specifies
learning
objectives that
may need
changing)
Learning
Content
Dvlp
And
Maint
(complete ILT /
storyboards for
learner-directed
content)
Baseline ILT
Learning
Content
Learning
Content
Storage and
Delivery
Versioned
ILT Learning
Content
Updates
(learning object
aggregations
managed via ties to
learning objectives)
[LO Module]
List of
learning
objects
linked to
impacted
learning
objectives
List of
learning
objects
linked to
impacted
tech data
Learner-directed
Content
Development and
Maintenance
[Venus]
Change Impact
Reporting
(based on learning
objective updates;
specifies learning
objects that may
need changing)
Baseline and Updated
Learner-directed Learning
Content
Modernized AIM can
tie the entire
process together
10
MT Continuum Process
Technical Data Repository
Links to Authoritative Tech Data / Updates
CPM
- baseline JTA data
- learning objectives
- content outline
Content Outline Draft w Versioned Learning
Objectives and Metadata
Versioned Learning Objective Updates
- content mgmt data)
List of learning
objects linked
to impacted
learning
objectives
List of
learning
objects
linked to
impacted
tech data
metadata,
links to IETMs,
SME inputs on
narrative,
interactions, &
graphics
LDC Dvlp/Maint
Change Impact
Reporting
(based on learning
objective and tech
data updates;
specifies learning
objects that may
need changing)
Baseline
Learning
Content
Versioned
Learning
Content
Updates
Updated
metadata
and graphics
files
Venus.net
Change
Impact
Reporting
(based on
performance
reqts updates;
specifies
learning
objectives that
may need
changing)
LO Module
Outputs:
- complete ILT lessons/sections
- storyboards for learner-directed
content incl. metadata, links to IETMs,
SME inputs on narrative, interactions,
& graphics
Inputs:
- updated storyboard content from
Venus.net
- amplify and
finalize storyboard
data from LO
Module
- dvlp initial LDC
lessons/sections
- coord review
comments
- finalize LDC
content
- export data back
to LO Module
Baseline
and
updated
run-time
learnerdirected
content
CM’d source
files for LDC
Lessons/
Sections
?????
11