Political objectives in Oslo

Download Report

Transcript Political objectives in Oslo

Oslo kommune
Energigjenvinningsetaten
Political objectives in Oslo
• 50 % reduction in emissions of greenhouse gases by 2030
• 50 % recovery of materials by 2014
• Source sorting of food waste and plastic packaging by 2012
• Increased use of renewable energy:
– Decision of sustainable cycle of waste handling, energy recycling and
District heating in Oslo (1 - 2 TWh.)  Change from fossil fuels to
renewable waste-based fuel for the district heating system.
– Use biogas as renewable fuel in vehicles
Oslo kommune
Energigjenvinningsetaten
Oslo and EGE –
in a climate perspective
• Based on the political objectives, Oslo has
defined the scope of work in EGEs
building programme :
• Scope of work, EGE:
–
–
–
–
New Waste-to-energy line, Klemetsrud – KA3
Optical sorting plant at Haraldrud
Optical sorting plant at Klemetsrud
Biogas plant at Nes in Romerike
Oslo kommune
Energigjenvinningsetaten
Circular
Waste Management in Oslo
•
•
•
The climate perspective, realised
through circular waste
management
Circular waste management is
based on total recovery of
materials and energy that waste,
as a resource, represents.
EGE’s new plants at Klemetsrud
and Haraldrud have been
developed in pursuance of this
perspective, focusing on
production of renewable energy,
such as district heating,
electricity and biogas, and the
best possible materials recovery
from food waste.
Oslo kommune
Energigjenvinningsetaten
PROSJEKT: ”EGE 2010" - ORGANISASJONSPLAN 27.08.2008
Referansegruppe:
Øystein Ihler
Silja Bjerke Vestre
Johnny Stuen
Lillian D. Oterholt
Ole Gregert Terjesen
EGE fagforeninger
- Roy Ståle Haug
- Jørn Gude
- Stig Skauby
- Skjalg Holter
Runar Skretteberg, HVO
Prosjekteier:
Helge Heier
Controller:
Cato Ryd
Prosjekteiers representanter:
Marked/Logistikk/Info : Øystein Ihler
Produksjon
: Johnny Stuen
Prosjekteiers representant
Silja Bjerke Vestre
EGE Ressurspersoner
Driftskoordinator
: Terje Opsahl
Logistikkkoordinator : Erik Ulberg
Anleggskoordinator BA: Thor Kristiansen
Utsortering
: Knut Martinsen
Anna Karin Eriksson
Biogass
: Birgit Rindal
Ovnslinje
: Thor Kristiansen
SRO
: Skjalg Holther
KS
: Monica Solheim
HMS
: Hans-Kristian Beck
Prosjektdirektør:
Knut Heieren
Utsorteringsanlegg
Prosjektleder: Petter Thorbeck
Prosjektstyring:
Prosjektassistent
Anskaffelser
- Oppf. Reinertsen
Prosjektcontroller
KS/HMS
Myndighetskontakt
Plan/ dok.
Teknisk
- El / SRO
- Generelt
Biogassanlegg
Prosjektleder : Knut O. Furuseth
- Biometan
: Kjetil Hansen
Ovnslinje 3 KA
Prosjektleder
- Del. prosj. leder el/mek
- Prosjekteringsleder
: Ole Poulsen
: Dorthe L. Baun
: Tore Bjønnstu
Bygg & Infrastruktur
Prosjektleder
- Byggeleder bygg KA
- Byggeleder infr KA
- Byggeleder BA
- Prosjekteringsleder
- Teknisk byggeledelse
- HMS-leder utførelse
: Elisabeth Nedgaarden
: Nils Buskenes
: Per Ø. Gøystdal
: Henriette Berntsen
: Anne Grete Helbostad
: Jarle Martinsen
: Jørgen Waak Viken
: Bjørn Halvorsen
: Ingvar Birkeli
: Johan Thorbeck
Leverandør:
ENVAC Norge AS
Leverandør:
(September 2009)
Leverandør:
Ovn/kjel
Gassrenseanlegg
Turbin /el generator
: Von Roll Umwelttechnik AG
: Von Roll Umwelttechnik AG
: (Sept 2008)
: Erik Madsen *
: Geir Simonsen
: Stein Ole Innset
: Karl Otto Vehus
: NN
: NN (El/Mek, etc)
: Kjetil Øvensen
Hovedentreprenør:
Reinertsen AS
* Stedfortredende Prosjektdirektør
Oslo kommune
Energigjenvinningsetaten
Optical sorting plant
Oslo kommune
Energigjenvinningsetaten
Biogas plant:
From food waste to biogas and
biofertilizer
Biogas plant
Oslo kommune
Energigjenvinningsetaten
Environment and Climate Aspects
•
Using biogas as fuel offers global
environmental benefits, as this replaces
and reduces fossil CO2 emissions and
recuce local emissions.
• Nitrogen and phosphorus are
nonrenewable
resources, which are in
short supply on a global scale. Proper
use of bio fertilizer will return these
nutrients to the ground.
Oslo kommune
Energigjenvinningsetaten
Klemetsrud W-t-E plant : KA 3
Signal building when arriving Oslo
Oslo kommune
Energigjenvinningsetaten
Situation of Line 3 at
the existing facility in
Klemetsrud
Line 3
Oslo kommune
Energigjenvinningsetaten
Main Supplies for the KA, Line 3
Contractor: Von Roll Inova  AE&E Inova  Hitachi Zosen Inova
•
•
•
•
Automatic waste reception
system with fully automatic
waste cranes (Kranwerke)
Boiler/incinerator unit
Wet Flue Gas Treatment System
with SCR catalytic NOx reduction
Turbine/Generator (Man Turbo
AG)
•
•
Waste Water Treatments
System
Regulation coolers to cool
excess heat production during
summer time.
Oslo kommune
Energigjenvinningsetaten
Energy Production
•
Overall energy efficiency: 99 %
•
•
Nominal electrical efficiency 20%
Maximum electrical efficiency 24%
•
Nominal energy production:
– 55,4 MW heat corresponding to heat
demand for 40.000 households
– 10,5 MW electricity corresponding to
electricity consumption for 20.000
households
Oslo kommune
Energigjenvinningsetaten
Challenges 2006 vs 2011:
Changed Scandinavian waste market
•
•
•
•
Competition of waste Avfallsmängder och behandlingskapacitet i Sverige (maj 2009)
Rentability
International waste
8
[Mton/år]
Develop district heating?
7
6
Ca 2 000 000 ton
5
Ca 800 000 ton
–
–
–
–
Profu
2009: Stop in landfills
Renewable energy, district heating
Circular waste management
2009 : Svenskesuget The competition with the Swedish W-t-E-plants
4
3
2
Avfallsmängd grundfall
Avfallsmängd Scenario låg och hög
Behandlingskapacitet inkl. alla planer
Behandlingskapacitet inkl. planer med tillstånd
Behandlingskapacitet inkl. definitivt beslutade planer
1
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Oslo kommune
Energigjenvinningsetaten