MEG実験用液体Xe scintillation detector
の40MeV γ線を用いた性能評価II
東京大学
久松康子
東大素セ、早大理工総研B、阪大理C、高エ研D、
BINP-NovosibirskE, INFN-PISAF, PSIG
岩本敏幸、大谷航、小曽根健嗣、菊池順B、
久野良孝C、澤田龍、鈴木聡B、寺沢和洋B、道家忠義B、西口創、
服部紘二B、春山富義D、真木晶弘D、真下哲郎、三原智、
森俊則、八島純D、山口敦史B、山下了、
山下雅樹B、山田秀衛、吉村浩司D、吉村剛史B、
A.A.GrebenukE, D.GrigorievE I.IoudineE, D.NicoloF, S.RittG, G.SignorelliF
2003年9月12日
日本物理学会秋季大会
The current status and
schedule of MEG experiment
Outline
Development of MEG Experiment Detectors
*Gamma beam test @PSI
*Liq. Xe Calorimeter
-Filler study for the Liq. Xe calorimeter
*COBRA Magnet
Schedule of MEG experiment
Summary
東大素セ、早大理工総研B、阪大理C、高エ研D、
BINP-NovosibirskE, INFN-PISAF, PSIG
久松康子、岩本敏幸、大谷航、小曽根健嗣、菊池順B、
久野良孝C、澤田龍、鈴木聡B、寺沢和洋B、道家忠義B、西口創、
服部紘二B、春山富義D、真木晶弘D、真下哲郎、三原智、
森俊則、八島純D、山口敦史B、山下了、山本明D、槙田康弘D、
山下雅樹B、山田秀衛、吉村浩司D、吉村剛史B、
A.A.GrebenukE, D.GrigorievE I.IoudineE, D.NicoloF, S.RittG, G.SignorelliF
Development of MEG
Detectors
Gamma beam test @ PSI
*π-p→π0 n
π0(28MeV/c)→γγ
*π-p→nγ
E(γ)=129MeV
Beam test using the monochromatic gamma beam at PSI πE1
beam line.
*monochromatic γ beam
the Energy Calibration
*2γ from the reaction: π0→2γ
the absolute timing
measurement
kinematics
γ
Eγ
θ
γ
θ
2 gamma rays emitted back to back in lab.
frame:
55 & 84 MeV
δEγ/Eγ < 1%
θ<5°
5°=87mrad=8.7cm@1m
piE1 beam line @ PSI
Beam properties:
Max. momentum: 280 [MeV/c]
Solid angle 32[msr]
π-flux:
8 * 105 /sec @ 1.6 mA
expected
Momentum acceptance 7.8%
Momentum resolution 0.8 %
Dipole Magnet
Graphite target
Vertical & horizontal slits
Quadruple Magnet
Experimental Setup
NaI
counter
Timing Counter
-- beam
degrader
TA
Veto counter
Trigger : coincidence
2 Counters
target
Liq. Xe
& Timing counter
& Liq.Xe
Experimental Setup Cont’d
Target
Liq. H2 target
Target cell: 41mm dia. 103mm length
NaI
64bars NaI (assembled to form an
8×8array)
63.5×63.5×406 mm3
Position resolution (radial) : σr=4.8 cm
@100MeV
Timing Counter
Installed in front of NaI detector
2plastic scintillators over lapped (5×5cm2)
Lead plate (6mm thick)
Prospects
γ beam from π0→2γ will be used to calibrate
the Liq. Xe calorimeter in MEG experiment @
piE5, PSI
Resolution required in MEG experiment
Beam Time : Sep. 24th to Dec. 10th
MEG experiment detectors
Liq. Xe calorimeter
Design of liq.Xe calorimeter
has almost completed.
The start of the construction:
2004
Subjects to be solved:
Stress, Deformation,
Heat Load, Need of filler
Filler study for the Liq.Xe
detector
Signal cable
Some incident photons
lose their energy in
Liq.Xe, which fills space
between the detector wall
and PMTs.
Honeycomb
(SUS314)
vacuum
γ
Liq.Xe
PMT
Incident
window
PMT
holder
(G10)
PMT cover
(acrylic)
To fill the space with
materials of long
radiation length (“Filler”)
will improve the
efficiency of this detector.
Filler study
Requirement for Filler:
Long radiation length
Do not contaminate liq.Xe
The same expansion coefficient
as the glass used in Stem
A mixture of Epoxy resin
and glass.
Filler is attached directly
to the PMT.
Cooling Test
PMTs with
Filler are cooled
down to 150K.
PMT
heater
The temperature
of PMT is
controlled by
Liq.N2, a cold
finger (Cu pipe)
and a heater.
Now studying…
The difference between the thermal
expansion rate of epoxy resin and of SUS.
Stress on the PMT cover
COBRA Magnet
Construction finished!
Superconducting coil in cryostat.
Compensation coil
potentiometer
Support frame
COBRA Magnet: Solenoid magnet for positron spectrometer
Gradient field for high rate events
Final Excitation Test completed.
*Magnetic field inside the SC was
measured.
→Good Agreement with the
calculation!
*Fringe field around the photon
detector region was measured.
→Suppressed by compensation coils.
OnOn
thethe
axisaxis
The Schedule of MEG
experiment
Photon detector
: Large prototype @PSI
background estimation
The construction start in 2004.
COBRA magnet
: Shipping to PSI on Sep. 26th
Installation & Engineering runs in piE5
Beam line
: Ready by the spring of 2004
Positron tracker
: The construction start in 2004.
Electronics & DAQ system : Start assembling in 2004.
All the detectors will be installed in piE5 beam line by 2005.
Engineering runs will start in 2005.
MEG experiment starts at the beginning of 2006.
Summary
Beam test using monochromatic gamma beam starts on Oct.
2nd.
The design of the photon detector has almost completed and
now studying details. (Filler problems and so on)
The construction of COBRA Magnet has finished. (Good
performance! )
Engineering runs will start in 2005, and MEG experiment at the
beginning of 2006.