Transcript Document

K2 FOR SHAREPOINT

RELEASE CANDIDATE

PRESENTED BY: ERIC SCHAFFER PRODUCT MANAGER K2.COM

AGENDA

    

Beta Wrap up Feature Overview Availability Support QA

K2.COM

BETA WRAP UP

Thank you for your participation and feedback!

 If you have something cool that you have built that you would like to share with us please email ( [email protected]

)  There may be a prize in it for you  The beta virtual machines will be expired when RC releases  A new RC virtual machine will be made available when the RC releases (or shortly thereafter)  The recorded beta sessions will still be available (linked to from RC documentation pages)

K2.COM

WHAT HAS CHANGED IN RC

              Settings Page Management Pages Permissions Management moved to Settings (removed from App registration) Reports Uninstall Manual Start Changes (runtime and design time) Visual Studio and K2 Studio wizards Full Control (create site, etc.) Worklist App Part Async loading forms Form UI cleanup Out of sync warning Deployment wizard Wizard enhancements  Minimum questions first time through  Item reference assumptions   Error handling Item reference of related items

K2.COM

WHAT IS STILL PLANNED FOR RTM BUT IS NOT IN RC

  Document Sets Recycle Bin

K2.COM

WORKLIST APP PART

In Beta a temporary worklist control was used for the worklist App Part  In RC the new HTML 5 worklist control is now being used by the App Part

K2.COM

OUT OF SYNC WARNING

If changes are made to the structure of a list or library a warning will display about the SmartObjects being out of date when opening the K2 App

K2.COM

FULL CONTROL

The Beta app only requested Site.Manage permissions in SharePoint  Site.Manage does not allow for being able to create/manage sites/groups  The RC app requests Site.FullControl to allow for these site/group provisioning scenarios  SharePoint App Store apps are not allowed to request full control  At RTM there will be two versions of the K2 for SharePoint app  Full Control (on prem and manual deploy to online)  Manage (SharePoint App store)  There will be a KB that will guide you on how to go from Manage to Full Control if you install from the store.

K2.COM

SETTINGS / MANAGEMENT

Changes have been made to the Settings and Management pages for the App  Multi Auth / Oauth / Claims Management pages have been added  Permissions has been separated from the registration wizard  Uninstall wizard has been added

K2.COM

REPORTS

In the beta you could generate reports for each app or custom build reports to report across multiple apps  In the RC some high level reports have been added

K2.COM

ERROR HANDLING

Options have been added to some of the wizards to allow the workflow to continue when a known error (like a document already being checked in) is encountered

K2.COM

  

MANUAL START CHANGES

Changes have been made to the manual start pages (design and runtime) Design Time  It is now possible to change a manual workflow to an event workflow and vice versa  It is now also possible to have an event workflow that is NOT able to be started manually Runtime  Simpler Interface  Item level reporting

K2.COM

K2 STUDIO / K2 FOR VS

In the Beta all the event wizards were available in K2 Studio and K2 for Visual Studio however…  There was no Process level wizard for being able to connect a workflow to a SharePoint event.

 In the RC the K2 for SharePoint Process wizard has been added

K2.COM

Demo

K2.COM

TECHNICAL DETAILS

K2 for SharePoint RC will be upgradeable to RTM  K2 for SharePoint Beta

will NOT be upgradeable

to RC  K2 for SharePoint RC requires:    K2 blackpearl 4.6.7 RC K2 smartforms 1.0.6 RC K2 control pack 1 RC

K2.COM

AVAILABILITY

K2 for SharePoint RC (and dependent components) will available on the portal under beta components when it is released (single download)  Release date is the week December 17 th  All customers/partners will be given access to the RC  Only customers/partners interested in the K2 for SharePoint beta should work with the RC

K2.COM

SUPPORT

Support for the K2 for SharePoint RC will continue to be through the beta support process

K2.COM

K2.COM

Q&A

K2.COM