ROADS Services Training Group
LOCAL AUTHORITY ROADS CONFERENCE 2013
OUR ROADS – PLANNING FOR THE FUTURE/ROLE IN
NATIONAL AND LOCAL DEVELOPMENT
HODSON BAY HOTEL, ATHLONE, MAY 2013.
1
Our Roads - Planning for the
Future/Role in National and Local
Development
Community Involvement in
Roadworks
Simon Walton, Senior Engineer
Kilkenny County Council
Background to CIR in County Kilkenny

Circular RW 4/94


LAs should ‘actively seek the support of local
communities for improvement and
maintenance work on non-national roads’
Restoration Improvement Programme ’95


5% of Restoration Grants can be set aside for
CIR Schemes
Focus on the improvement of the road network
on which the LA is not in a position to carry
out regular maintenance work
Background to CIR in County Kilkenny

Restoration Programme/CIR


Prepare multi annual programmes in line with
the strategic needs of the road network
Set aside 5% (7.5%) of Restoration Grant for
CIRs so as to;




Enable structural improvements to the local tertiary
network
Harness community support where it most available
Reduce the maintenance burden on the LA
Facilitate Elected Representatives
Non-National Road Network Co. Kilkenny




Regional
Local Primary
Local Secondary
Local Tertiary

421km
795km
1350km
397km
Total No. LT Roads 748
(14%)
(27%)
(46%)
(13%)
CIR Schemes in County Kilkenny since 1995

Total Number of Schemes
303 (41%)

Total Length Improved
156km (39%)

Total Investment
€8,141,213


Rest. Grant
Local Contributions
€6,534,554
€1,606,659
LT Condition Index Rating for Co. Kilkenny 2013
1
2
3
4
5
6
7
8
9
10
Total
83
112
64
68
42
43
86
102
143
5
748
11% 15%
8%
9%
6%
6%
11% 14%
19% 1% 100%
43% of LT Roads require reconstruction/structural overlay
12% of LT Roads require surface restoration
45% of LT Roads are Condition Rating 7 – 10
41% of LT Roads have had a CIR Scheme since 1995
CIR Schemes in County Kilkenny 2013

Waiting list of 69 applicants/LT Roads



56 (81%) expressed ongoing commitment to
CIR
1 requested withdrawal
12 did not reply
CIR Summary Position for Co. Kilkenny





Well established community support for CIR
Schemes on the LT Network
Significant support from Elected Members for the
Restoration Grant discretion (7.5%)
Including LT roads in Restoration Programmes
removes requirement for local contributions
Many LT Roads are beyond the provisions of
routine/localised maintenance
Suggest retention of discretion for individual local
authorities to reserve 7.5% of Restoration Grants
for CIR Schemes.