Market observation, traffic organization
features, Corridor VII
The DC‘s contribution to the EUSDR
Pjotr S. Suvorov
Danube Commission, Budapest
Budapest, September 17th, 2013
Scheme of main gauging stations for
assessment navigational conditions
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Scheme of main control points for monitoring
fleet traffic and cargo flows
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Level indicators from gauging station KIENSTOCK in 2011-2013
Level indicators from gauging station PFELLING in 2011-2013
1100
900
1050
850
1000
800
950
750
700
900
HNN/HNL
659
850
800
650
750
600
HNN/HNL
708
700
500
450
400
650
600
MW/MW
311
550
500
450
350
400
300
RNW/LNRL
290
200
150
300
2011
250
2012
200
2013
150
100
100
50
RNW/LNRL
164
2011
2012
50
2013
0
0
JAN
JAN
JAN
FEB
FEB
MART
MART
MART
APR
APR
APR
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
250
350
JAN
JAN
JAN
FEB
FEB
MART
MART
MART
APR
APR
APR
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
water levels in cm
water levels in cm
MW/MW
397
550
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Level indicators from gauging station BUDAPEST in 2011 - 2013
Level indicators from gauging station DUNAFÖLDVAR in 2011-2013
900
750
850
700
800
650
750
600
700
HNN/HNL546
HNN/HNL 668
550
500
650
450
2012
400
2013
500
450
MW/MW
272
400
water levels in cm
550
2011
2011
2012
350
2013
300
250
MW/MW
61
200
350
150
300
100
250
50
200
0
150
-50
100
-100
RNW/LNRL
92
0
-150
RNW/LNRL
-116
-200
JAN
JAN
JAN
FEB
FEB
MART
MART
MART
APR
APR
APR
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
50
JAN
JAN
JAN
FEB
FEB
MART
MART
MART
APR
APR
APR
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
water levels in cm
600
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Level indicators from gauging station ZEMUN in 2011-2013
Level indicators from gauging station MOHÁCS in 2011-2013
650
1000
950
600
900
HNN/HNL 815
850
HNN/HNL 623
550
800
500
750
2011
700
2012
2011
2012
450
2013
2013
650
400
MW/MW 270
500
450
400
water levels in cm
550
MW/MW 343
350
300
250
350
200
300
250
RNW/LNRL
213
150
200
100
150
100
RNW/LNRL
124
50
50
JAN
JAN
JAN
FEB
FEB
MART
MART
MART
APR
APR
APR
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
0
0
JAN
JAN
JAN
FEB
FEB
MART
MART
MART
APR
APR
APR
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
water levels in cm
600
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Level indicators from gauging station CORABIA in 2011 - 2013
Level indicators from gauging station CALAFAT in 2011 - 2013
700
650
HNN/HNL
686
650
600
600
550
2011
550
2012
500
HNN/HNL
640
2011
2012
500
450
400
400
300
250
200
350
250
200
150
100
100
50
50
-50
RNW/LNRL
27
-100
MW/MW
265
300
150
0
2013
RNW/LNRL
18
0
-50
-100
JAN
JAN
JAN
FEB
FEB
MART
MART
APR
APR
MAI
MAI
JUNI
JUNI
JULI
JULI
JULI
AUG
AUG
SEPT
SEPT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
MW/MW
286
350
water levels in cm
450
JAN
JAN
JAN
FEB
FEB
MART
MART
APR
APR
APR
MAI
MAI
JUNI
JUNI
JULI
JULI
JULI
AUG
AUG
SEPT
SEPT
SEPT
OKT
OKT
NOV
NOV
DEC
DEC
DEC
water levels in cm
2013
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Level indicators from gauging station SILISTRA in 2003 , 2012 and 2013
Level indicators from gauging station GIURGIU in 2011 - 2013
750
750
700
700
HNN/HNL
717
650
650
600
600
550
550
HNN/HNL
658
2011
2012
2013
2003
500
500
2012
2013
450
450
400
250
300
250
200
200
150
150
100
RNW/LNRL
77
MW/MW
277
350
100
50
50
0
0
-50
-50
-100
-100
-150
-150
RNW/LNRL
-17
JAN
JAN
JAN
FEB
FEB
FEB
MART
MART
MART
APR
APR
MAI
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
NOV
DEC
DEC
DEC
300
water levels in cm
MW/MW 308
350
JAN
JAN
JAN
FEB
FEB
FEB
MART
MART
MART
APR
APR
MAI
MAI
MAI
JUNI
JUNI
JUNI
JULI
JULI
JULI
AUG
AUG
AUG
SEPT
SEPT
OKT
OKT
OKT
NOV
NOV
NOV
DEC
DEC
DEC
water levels in cm
400
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
JAN
JAN
JAN
JAN
JAN
JAN
FEB
FEB
FEB
FEB
MART
MART
MART
MART
MART
MART
APR
APR
APR
APR
APR
MAI
MAI
MAI
MAI
MAI
JUNI
JUNI
JUNI
JUNI
JUNI
JULI
JULI
JULI
JULI
JULI
AUG
AUG
AUG
AUG
AUG
SEPT
SEPT
SEPT
SEPT
SEPT
OKT
OKT
OKT
OKT
OKT
NOV
NOV
NOV
NOV
NOV
DEC
DEC
DEC
DEC
DEC
water levels in cm
Level indicators - gauging station BRAILA
2011- 2013
650
600
150
HNN/HNL
623
550
2011
2012
500
2013
450
400
350
MW/MW
288
300
250
200
RNW/LNRL
93
100
50
0
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Budapest, September 17th, 2013
Workshop 2013 - a prosperous future for the Danube navigation
1.000
95.000
374.100
13/03/12
01/03/12
02/03/12
07/03/12
433.000
02/03/12
24/02/12
17/02/12
06/02/12
09/02/12
07/02/12
10/02/12
08/02/12
09/02/12
10/02/12
07/02/12
12/02/12
10/02/12
07/02/12
08/02/12
484.000
23/02/12
27/02/12
551.000
22/02/12
23/02/12
645.000
845.650
975.000
1005.000
1075.000
1155.000
1205.000
1434.000
17/02/12
20/02/12
20/02/12
1811.000
1819.000
1864.000
1921.050
1979.580
1987.000
1994.000
2060.150
2074.900
2095.100
18/02/12
21/02/12
2111.830
20/02/12
23/02/12
2119.700
2146.800
13/02/12
05/02/12
2182.500
23/02/12
2201.000
2203.000
2206.000
07/02/12
05/02/12
2223.200
26/02/12
2231.000
07/02/12
06/02/12
2243.000
2414.720
Dates of interruption and reopening of navigation
PERIODS OF INTERRUPTION OF NAVIGATION ON THE DANUBE SECTIONS CAUSED BY ICE
PHENOMENA IN 2012
01/02/12
05/02/12
06/02/12
08/02/12
11/02/12
16/02/12
12/03/12
Scheme of critical "bottlenecks" limiting navigation on the
Danube, and announced projects
(as of 2009)
- Construction of retaining section
- Implemented hydrotechnical projects without retaining schemes
- Local hydrotechnical projects
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Budapest,
Vigado ter,
June 2013
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
PASSAGE OF PASSENGER CABIN VESSELS through locks GABCIKOVO and MOHÁCS in
2012 -2013
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0
-20
-40
-60
-80
-100
-120
-140
-160
-180
-200
-220
-240
-260
-280
-300
229
223
209
134
109
18
8
47
21
145
215
104
253
36
246
1
-1
-25
-5
-7
-21
-169
-225
-101
-255
-239
-37
-42
-113
-150
-190
-222
JANV
100
80
60
40
20
0
-20
-40
-60
-80
-100
237
223
2013
FEBR UP MART
DOWN 2013
MAI
JUNI
APRIL
56
42
3
-2
0
-2
-3
28
-37
-2
53
-58
FEBR
MART
42
-45
APRIL
MAI
-220
-233
UP
2012
AUG
57
SEPT
DOWN 2012
OKT
NOV
45
4
-53
-4
JUNI
-3
-60
JULI
AUG
SEPT
OKT
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
2
-34
-39
-41
-60
DEC
39
56
-31
-52
JANV
JULI
48
31
5
-232
NOV
DEC
VESSELS’ PASSAGE through GABCIKOVO BY
TYPES OF MOTORIZED VESSELS in 2013 by month
VESSELS’ PASSAGE through MOHÁCS BY TYPES OF
MOTORIZED VESSELS in 2013 by month
225
225
200
200
9
175
11
150
175
13
150
125
125
9
100
8
75
50
100
11
18
178
154
149
112
110
92
75
7
81
16
25
12
25
49
32
33
-36
-36
45
19
14
31
32
-42
-36
12
7
14
54
49
-53
-47
24
0
0
-25
13
50
-54
-56
-75
-50
-85
-40
-68
-25
-72
-8
-50
-101
-26
-45
-10
-16
-11
-24
-3
-12
-21
-75
-100
-75
-42
-75
-63
-51
-20
-49
-98
-125
TMS LEER
-100
TMS LEER
TMS
-125
TMS
GMS LEER
-150
-108
GMS
GMS LEER
-150
-175
-175
-200
-200
GMS
-225
-225
JANV FEBR MART APR
MAI
JUNI JULI AUG SEPT OKT NOV DEC
JANV FEBR MART APR
MAI
JUNI
JULI
AUG SEPT OKT
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
NOV
DEC
VESSELS’ PASSAGE through GABCIKOVO BY TYPES OF
CONVOY UNITS in 2013 by month
325
325
300
300
275
275
RORO
250
TL LEER
225
TL
SL LEER
SL
PUSHER
200
204
175
150
164
114
100
131
125
150
125
122
57
64
44
47
52
56
0
-57
-50
-56
-46
-56
-50
-46
-75
-71
-77
-73
100
-175
20
-24
-10
74
147
179
156
160
163
119
50
53
25
0
-72
-25
-62
-47
-75
-49
-63
-82
24
28
38
35
-26
-30
-30
-35
-32
24
-17
-26
-86
-89
-101
-68
31
28
-43
-29
-77
-122
-100
-125
-76
-69
32
-50
-49
-75
-125
-150
192
186
75
50
-100
225
175
75
-25
RORO
TL LEER
TL
SL LEER
SL
PUSHER
250
200
155
125
25
VESSELS’ PASSAGE through MOHÁCS BY TYPES OF
CONVOY UNITS in 2013 by month
-150
-109
-175
-127
-155
-181
-71
-95
-77
-33
-73
-200
-200
-135
-225
-225
-250
-250
-275
-275
-300
-300
-325
-325
-32
-128
-350
-350
JANV FEBR MART APRIL MAI
JUNI
JULI
AUG SEPT OKT
NOV
DEC
JANV FEBR MART APRIL MAI
JUNI
JULI
AUG SEPT OKT
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
NOV
DEC
STRUCTURE OF FREIGHT TRANSPORT BY TANKERS, DRY CARGO
VESSELS and BARGES through GABCIKOVO in 2013 in tonnes by month
STRUCTURE OF FREIGHT TRANSPORT BY TANKERS, DRY CARGO
VESSELS and BARGES through MOHÁCS in 2013 in tonnes by month
450,000
400,000
400,000
350,000
350,000
191,666
450,000
28,525
23,121
38,466 45,191
65,319
171,351
43,736
150,000
201,890
204,741
290,562
247,135
224,164
212,901
-91,978
-83,106
-193,804
-103,978
-23,867
-11,097
-28,545
-165,811
TMS
TL
GMS
152,327
248,690
50,000
-71,423
120,660
250,943
100,000
0
-50,000
-150,000
-100,000
-39,372
-39,173
-11,994-37,947
-150,000
-12,391
-30,930
-32,781
-36,953
-25,415
-56,478
-35,142
-200,000
-200,000
-250,000
-250,000
-300,000
-300,000
-114,589
-81,372
-72,271
-42,477
-65,745
-52,326
-85,609
-78,144
0
-59,090
-100,000
34,487
250,000
55,784
72,589
199,673
168,920
170,322
146,451
208,020
100,000
-50,000
30,714
300,000
200,000
150,000
50,000
TMS
TL
GMS
SL
134,402
92,083
99,416
200,000
163,830
250,000
122,746
300,000
-46,956
-32,697
-35,378
JANV FEBR MART APRIL MAI
JUNI
JULI
AUG SEPT OKT
NOV
DEC
JANV FEBR MART APR
MAI
JUNI
JULI
AUG SEPT OKT
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
NOV
DEC
Forecast of the traffic density
for the Danube (2020)
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
CARGO FLOWS ON THE DANUBE BY EXPORT, CABOTAGE, IMPORT AND TRANSIT BY COUNTRY in 2011 in tonnes
7,500,000
4,924,720 2,886,749
3,129,600
781,500722,400
3,129,600
2,050,370
417,126
7,000,000
6,500,000
EXPORT
6,000,000
TRANSIT
5,500,000
5,000,000
1,914,208
95,300
4,500,000
599,500
2,828,568
1,447,706
4,000,000
0
164,500297,812
1,030,100266,81223,208
3,500,000
0
3,000,000
439,502
2,500,000
0
2,000,000
6,029,853
6,029,853
-2,247,077
-2,247,077
3,317,379
-956,103
6,029,853
4,396,609
-331,775
-2,247,077
3,317,379
3,235,179
-956,103
-956,103
3,235,179
-956,103
3,368,491
-1,210,907
3,368,491
3,368,491
-1,210,907
-1,210,907
3,124,887
-942,638
2,361,599
-551,842
2,361,599
2,361,599
-551,842
-551,842
4,180,507
-992,689
4,180,507
2,142,536
-992,689
2,142,536
-421,464
4,180,507
761,674
-1,061,947
-992,689
761,674
-1,061,947
-125,682
2,142,536
761,674
500,000
74,578 21,640
-1,061,947
1,000,000
-421,464
1,500,000
-500,000
-1,000,000
-1,500,000
-26,277
-2,000,000
-421,464
0
-760,387
-189,162
-556,916
-1,197,399
-138,400
-579,247
-318,104 -28,835
-708,900
-62,300-338,104
-599,500
-2,500,000 -1,062,011
-3,000,000
-1,468,600
-1,468,600
-2,092,928
-177,626
-3,500,000
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
-394,400
-781,500
Cargo flows by Rhine, Main, Danube waterway
in 2012 in tonnes
6,000,000
5,000,000
4,000,000
3,000,000
6,169,476
5,514,995
4,383,614
2,000,000
2,899,959
1,000,000
2,364,622
3,043,556
2,767,741
-1,782,824
-1,680,719
JOCHENSTEIN
DE/AT
2,740,267
0
-1,000,000
-2,791,563
-2,553,438
VIERETH
KELHEIM
-1,267,309
-1,664,861
-2,697,078
-2,000,000
-3,000,000
-4,000,000
-5,000,000
-10,568,592
-6,000,000
-7,000,000
-8,000,000
-9,000,000
-10,000,000
-11,000,000
KOSTHEIM
AT/SK
GABCIKOVO
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
MOHACS
Cargo volumes transported through the Sulina
channel in 2012 in tonnes
100,000
22,195
33,780
44,330
43,519
44,241
23,642
35,809
11,216
20,311
11,433
-125,395
43,288
-126,984
57,448
50,000
0
-150,000
-122,727
-168,029
-141,795
-210,229
-217,710
-286,991
-185,391
-100,000
-204,807
-50,000
-154,199
-36,972
-200,000
-250,000
-300,000
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013
Thank you for your attention!
Pjotr S. Suvorov
Deputy Director-General for Development of the Danube Navigation
Secretariat of the Danube Commission
[email protected]
H-1068 Budapest
Benczur utca 25
Workshop 2013 - a prosperous future for the Danube navigation
Budapest, September 17th, 2013