Danube Navigation – a European Perspective
"
The current list of projects on bottlenecks on the Danube river
Horst Schindler Danube Commission, Budapest Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters Basis
Belgrade Convention TEN-T priority areas Waterway Classification Reports of Memberstates
Structure
Introduction Status Quo Development of Infrastructure Identification of priority areas Masterplan
Masterplan
Structure follows Classification Bridges and fairway distinguished Fields of action General descriptions of projects
Adopted
through Decision DK/TAG 77/13 from the 25th December 2011 Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters
Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters
Wachau Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters
Port Devinska Nova Ves Bratislava/Wolfsthal Gabcikovo/Nagymaros Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters
Study Szob Mohács Danube Navigation – a European Perspective Budapest, October 9th, 2013
Masterplan for achieving recommended fairway parameters
ISPA 2 ISPA 1 Sulina Canal Danube Navigation – a European Perspective Budapest, October 9th, 2013
Thank you for your attention
Horst Schindler Chief Engineer Danube Commission Benczúr utca 25 1068 Budapest [email protected]