High-level meeting

2013

"

Danube Navigation – a European Perspective

"

The current list of projects on bottlenecks on the Danube river

Horst Schindler Danube Commission, Budapest Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters Basis

Belgrade Convention TEN-T priority areas Waterway Classification Reports of Memberstates

Structure

Introduction Status Quo Development of Infrastructure Identification of priority areas Masterplan

Masterplan

Structure follows Classification Bridges and fairway distinguished Fields of action General descriptions of projects

Adopted

through Decision DK/TAG 77/13 from the 25th December 2011 Danube Navigation – a European Perspective Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters

Danube Navigation – a European Perspective Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters

Wachau Danube Navigation – a European Perspective Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters

Port Devinska Nova Ves Bratislava/Wolfsthal Gabcikovo/Nagymaros Danube Navigation – a European Perspective Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters

Study Szob Mohács Danube Navigation – a European Perspective Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters

ISPA 2 ISPA 1 Sulina Canal Danube Navigation – a European Perspective Budapest, October 9th, 2013

Thank you for your attention

Horst Schindler Chief Engineer Danube Commission Benczúr utca 25 1068 Budapest [email protected]