Transcript Slide 1
Name Burren Water Management Unit Area 180 km2 River Basin District South Eastern RBD Sectoral Total Phosphorus Source (This does not imply impact) 70 60 Main Counties Carlow Protected Areas Blackstairs Mountains SAC 2 Drinking waters – both from Burren River 50 40 % Burren Water Management Unit Action Plan 30 20 10 0 e ul ic gr r tu A U e ns w e er d Po la pu ns tio try s ea es r Fo U an rb Ar ke or W d la at Pe U try s nd e ns a W w e er e st d W d In us e Tr er at n la m at tP en re tu ul ts ac qu A Ba o gr ck d un es Lo ss Burren Water Management Unit Action Plan STATUS/IMPACTS River status Overall status 8 River Water Bodies - 6 Moderate, 2 Poor. No lakes High Status elements Q score dictates overall status. Phys Chemical was good or high where monitored. Status for 4 moderate and 1 poor WBs are extrapolated. Chemical Status not monitored. Good Moderate 25% Poor Possible Impacts EPA Water Quality 2004 PRESSURES/RISKS Aghalona (SE_14_1296 - Status 2009: Moderate) - Sluggish, lowland stream, excessive weed and silt, distinctly eutrophic. Agriculture suspected. Burren (SE_14_347 - Status 2009: Moderate & SE_14_1781 - Poor) - Generally over-enriched and eutrophic in 2003, with the exception of uppermost reaches. Slight pollution recorded in mid and lower reaches. Marked deterioration d/s of trout farm at Milltown Bridge. Lower reaches somewhat better but overall considerable room for improvement. Bad Yet to be determined 75% Nutrient sources Almost all TP is diffuse (98%) mainly from Agriculture (60%) and Unsewered Properties (35%) Point pressures 4 WWTP: Fenagh, Kernanstown, Rathoe, Tinryland. 2 WTP: Raheenleigh, Sion Cross. 4 Section 4s: Manufacturer, Private Company, Developer, Hotel. SELECTED ACTION PROGRAMME NB All relevant basic measures, general supplementary measures and SEA mitigation measures apply Wastewater Treatment Plants (WWTP) and Industrial Discharges At risk: Fenagh WWTP - Has recently been upgraded. Tinryland WWTP Fish hatchery (SE_14_451) - at risk due to historical deterioration in Q value and currently Q<4 within 3km D/S of outfall. Rathoe WWTP upgraded according to Local Authority. Point Sources See Point Source Discharge Table for WWTP at risk below. INDUSTRY: Fish hatchery Section 4 - measures in addition to basic measures apply. Examine the terms of discharge authorisations to determine whether they require review for the purpose of compliance with water body objectives including protected area objectives and environmental quality standards. Diffuse Sources AGRICULTURE - Good Agricultural Practice Regulations and Enforcement. Other Protection of drinking water, abstraction control and future licensing. Morphology - Channelisation Investigation to determine impact. Fenagh WWTP has been recently upgraded. Sewerage Scheme planned for Kernanstown. Quarries, Mines & Landfills There are 3 Quarries. Agriculture 7 WB at risk (SE_14_1546, SE_14_1296, SE_14_1821, SE_14_94, 1SE_14_1781, SE_14_1599, SE_14_451) On-site systems There are 1875 septic tanks in this WMU, none of them are posing a risk to water quality due to their density, location and unsuitable hydrogeological conditions. Forestry No waterbodies at risk from forestry Dangerous substances No waterbodies at risk from Dangerous Substances. Morphology 6 WB at risk - SE_14_1546, SE_14_451, SE_14_1296, SE_14_1821, SE_14_941, SE_14_1781. Channelisation, Burren Drainage District (pre 1945) Abstractions 2 abstractions - 2 WB at risk - SE_14_451, SE_14_347 Other None Point Source Discharge Tinryland Point Source Discharge County Carlow County Rathoe Carlow Point Source Discharge Fenagh Point Source Discharge Fenagh County Carlow County Carlow Rathoe Carlow Priority 2 Measure (Capital Works) Increase capacity of treatment plant. Measure (Investigation before Capital Works) Investigate the need for increase in 3 capacity of treatment plant. Priority Measure 3 Investigation of CSO's Priority Measure 3 Ensure capacity of treatment plant is not exceeded 3 Ensure capacity of treatment plant is not exceeded Priority Burren Water Management Unit Action Plan FUTURE DEVELOPMENT Future Pressures and Developments OBJECTIVES Throughout the river basin management cycle future pressures and developments will need to be managed to ensure compliance with the objectives of the Water Framework Directive and the Programme of Measures will need to be developed to ensure issues associated with these new pressures are addressed. Restore/Protect 2015 1 water bodies Alternative Objectives Extended Deadlines – 7 water bodies with 2021 deadline New Modifications or Development – Carlow Main Drainage Scheme in 1 river waterbody (SE_14_1781) HMWB/AWB - none River Data This table outlines water body information including status and a breakdown of its elements, protected areas, objectives and timescales. IE_SE_Burren Supporting Elements Biological Elements Protected Areas Date objective to be achieved Objective Drinking Water Nutrient Sensitive Waters Special Protection Area Special Area of Conservation Chemical Status M GES 2021 SE_12_789 M GES 2021 SE_12_913 P GES 2021 GES 2021 GES 2021 GES 2021 M G Ecological Status Physio-chemical Specific Polutants N Morphology SE_14_1599 Phytobenthos (Diatoms) N Fish SE_14_1546 M FreshWater Pearl Mussel Y Macroinvertebrate s (Q) Monitored Y (Extrapolated N) SE_14_1296 Donor Waterbody Member State Code SE_14_1781 Y SE_14_1821 N H SE_14_347 Y SE_14_451 N SE_12_789 M GES 2015 SE_14_941 N SE_12_1727 M GES 2021 SE_14_1781 M Y M P H P Y Y