Transcript Slide 1
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities Ed Regan Senior Vice President ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates HOT / BRT: Better Together • Managed and HOT Lanes Gaining Interest in U.S. • • SR 91 Express Lanes - Orange County I-15 Managed Lanes - San Diego I-10 (Katy Freeway) Managed Lanes - Houston I-635 (LBJ Freeway) Managed Lanes - Dallas BRT Enjoying Resurgence Today’s Presentation Looks at Examples of Potential New Synergies Between the Concepts A “highway” solution can also become a “transit” solution Together they can provide a new framework for “High Quality Transportation” ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Today’s Presentation • A Look at the New I-10 (Katy Freeway) Project in Houston. • A Look at I-15 in San Diego - Including Public Perceptions about Managed Lanes. • The Potential for HOT / BRT Together. Hint: Think “Win - Win” ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Managed Lanes - The SR 91 Example ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates IH-10 Managed Lanes Houston • • • Part of Major Katy Freeway Expansion Program. Innovative Operational and Financing Solution to Difficult Congested Corridor. Could be Important Model for Urban Freeway Expansion in the Future. ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Project Location Map 529 529 290 290 5959 45 45 261 261 66 IH 10 Toll Lanes Katy Katy 8 610 610 Houston Houston Spring Spring Valley Valley 10 10 1010 10 10 Piney Piney Point Point Village Village 5959 9999 1093 1093 1093 1093 59 59 66 Bellaire Bellaire 610 610 9999 8 8 Stafford Stafford 1464 1464 Fulshear Fulshear Pecan Pecan Grove Grove 90 A A 90 59 59 Sugar Sugar Land Land 66 First Colony ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates 521 521 88 Managed Lanes Access Configuration N 6 Sillber Rd No Scale 8 10 10 10 10 Sam Houston Tollway Bunker Hill Rd Dairy Ashford Rd 6 8 SH 6 BRT Park & Ride ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Dairy Ashford Rd SH 8 Bunker Hill Rd Silber Rd BRT Park & Ride Current and Planned IH-10 Configurations Planned Expanded Configuration Current Configuration General Purpose Lanes General Purpose Lanes Reversible Carpool Lane General Purpose Lanes ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Future Managed Lanes General Purpose Lanes Groundbreaking Project • • Cooperative “Public-Public” Partnership. TexDOT – State Agency HCTRA – County Toll Agency METRO – Regional Transit Agency FHWA and FTA Tolls Used to Finance a Portion of the Major Expansion of an Urban Interstate. HCTRA will provide $250 million in revenue bonds toward overall project cost • Managed Lanes Replace Single Reversible HOV Lane. • Incorporation of Bus Rapid Transit. • Fully Electronic Open Road Tolling. • Variable Pricing to Maintain Free Flow for BRT, HOV and Toll Users. ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Unique Transit Provisions • • Four Managed Lanes Replace Single Reversible Lane. METRO Provided up to 25% of Peak Period Capacity in Peak Direction. Express Busses Three person Carpools • Pricing will be Set to Maintain Free Flow for Transit / HOV’s. • TexDOT Agrees to “Buy Out” Remaining Bonds if Rail Constructed in Corridor in Distant Future. ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Using Price to Manage Demand • • • • Key Provision for Transit. HCTRA Agrees to Always Price the Managed Lanes to Assure 55 MPH Operating Speed - Even in Peak Hours. Busses Have Free Usage - Plus Direct Access To/From BRT Center Park and Rides. Essentially a Four Lane, Two Directional Free-Flowing “Busway”. Shared with, and paid for by, toll paying vehicles (managed through pricing) ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Typical Managed Lanes Access Managed Lane CURRENT TOLL 1 or 2 Occupants HOV 3+ Peak Period ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates To Dairy Ashford To Bunker Hill To $0.50 $1.00 $2.50 Free Free Free 610 Typical Tolling Zones Guide Posts Police Car Police Car Guide Posts ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates 2007 2015 REVENUE 20,000 20,000 REVENUE, $/TRAVEL PERIOD 22,000 18,000 16,000 12,000 10,000 8,000 6,000 4,000 2,000 Westbound P.M. Peak 18,000 16,000 14,000 REVENUE 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 0.00 0 1.65 1 2.15 2 2.75 3 3.25 4 3.80 5 4.35 6 4.90 7 5.45 8 5.95 9 6.50 10 7.05 11 7.60 12 8.20 13 8.70 14 9.20 15 0 0.00 1.65 2.15 2.75 3.25 3.80 4.35 4.90 5.45 5.95 6.50 7.05 7.60 8.20 8.70 9.20 THROUGH TRIP TOLL RATE ($) THROUGH TRIP TOLL RATE ($) M/L VMT TRAVELED/PERIOD VMT, VEHICLE MILES VMT M/L VMT 110,000 100,000 Total HOV3 LOV 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 0.00 0 1.65 1 2.15 2 2.75 3 3.25 4 3.80 5 4.35 6 4.90 7 5.45 8 5.95 9 6.50 10 7.05 11 7.60 12 8.20 13 8.70 14 9.20 15 Optimum Toll Rate VMTTRAVELED/PERIOD VMT, VEHICLE MILES Toll Rate / Operations Profile $/TRAVEL PERIOD REVENUE,REVENUE REVENUE 22,000 110,000 100,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 0.00 1.65 2.15 2.75 3.25 3.80 4.35 4.90 5.45 5.95 6.50 7.05 7.60 8.20 8.70 9.20 THROUGH TRIP TOLL RATE ($) THROUGH TRIP TOLL RATE ($) SPEED 70 70 60 60 50 50 SPEED (MPH) SPEED (MPH) (MPH) SPEED SPEED (MPH) SPEED 40 30 20 ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates 10 Total HOV3 LOV 90,000 40 30 20 Managed Lanes General Purpose Lanes 0 0.00 1.65 2.15 2.75 3.25 3.80 4.35 4.90 5.45 5.95 6.50 7.05 7.60 8.20 8.70 9.20 THROUGH TRIP TOLL RATE ($) 10 Managed Lanes General Purpose Lanes 0 0.00 1.65 2.15 2.75 3.25 3.80 4.35 4.90 5.45 5.95 6.50 7.05 7.60 8.20 8.70 9.20 THROUGH TRIP TOLL RATE ($) Through Trip Toll Rates Eastbound • AM Peak • AM Shoulder • Mid-Day • PM Shoulder • PM Peak 2007 2015 2022 $2.20 2.15 1.10 1.10 1.10 $5.45 3.80 2.15 2.15 1.65 $6.75 5.45 2.15 2.15 2.15 $0.55 0.55 0.85 1.65 2.70 $1.10 1.10 0.85 3.25 4.35 $1.65 1.65 1.10 4.90 6.75 Westbound • AM Peak • AM Shoulder • Mid-Day • PM Shoulder • PM Peak ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Peak Hour Traffic Distribution* Eastbound - AM Peak LOV HOV-3+ CV Total Total Demand General Purpose Lanes Manual Lanes Managed Lanes Share 11,500 900 100 12,500 8,900 100 100 9,100 2,300 800 20.0% 88.9% 3,100 24.8% 11,400 800 300 12,500 9,400 100 300 9,800 2,000 700 17.5% 87.5% 2,700 21.6% Westbound - PM Peak LOV HOV-3+ CV Total ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates * 2003 Levels at East Toll plaza Broad Support for the I-15 Managed Lanes Project • Stakeholders Elected Officials support the project Technical stakeholders look to repeat previous success • Focus Groups Broad support for project, especially Bus Rapid Transit Current FasTrak customers showed strongest support • Intercept Surveys (50 carpoolers/50 transit riders along I-15 Corridor) 92% of carpoolers thought FasTrak lanes were “fair to them” 94% of transit riders thought FasTrak lanes were “fair to them” ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Good Idea to Have Time Saving Option on I-15 Strongly Agree 70% Don’t Know 2% Strongly Disagree 3% Somewhat Agree Somewhat Disagree 4% ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates 21% Approval of FasTrak Program on I-15 Approve Approve 66% 88% Disapprove 11% Don’t Know Disapprove 1% 28% FasTrak Customer ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Don’t Know Other I-15 Users 6% FasTrak Program Reduces Congestion on I-15 Strongly Agree Strongly Agree 65% 42% Somewhat Agree 31% Strongly Disagree 5% Don’t Know Somewhat Disagree 5% Somewhat Agree 25% FasTrak Customer ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates 2% Strongly Disagree Somewhat Disagree 14% 11% Other I-15 Users Single Most Effective Way to Reduce Congestion on I-15 37% 49% Add Regular Lanes Don’t Know 4% Add Transit 10% Build Other Roads 13% FasTrak Customer ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Add Regular Lanes Extend Express Lanes Extend Express Lanes 24% Don’t Know 5% 26% Add Transit 11% Other I-15 Users Build Other Roads 21% HOT/BRT: Better Together • Win - Win Scenario. Highway Side Transit Side • • Innovative Integrated Finance Opportunity. Potential Integrated “High Quality” Transportation Solution. ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Key Ingredient: Value Pricing • Manages Demand to Keep Lanes Flowing Preserves Critical Time Savings Advantage. For toll paying vehicles For BRT (“Virtual” Busway) • Generates Revenue. For capital cost to get lanes built - (I-10 example) For transit operating subsidies where HOV lanes exist (I-15 example) • Highway / Transit Cross Subsidy Not Really an Issue. Motorists are voluntarily paying a toll for time savings benefits they receive Not simply a toll for the benefit of a mode they are not using • Pricing Provides a “Built-In” Incentive to Shift to Transit ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Bottom Line: Managed Lanes / BRT Together Can… • Increase Efficiency of Existing HOV Lanes. • • Enhance Park & Ride Programs and Transit Services. Merge Roadway and Transit Systems, Making Most Efficient Use of Each. • Manage Demand Through Value Pricing. • Provide a Badly Needed New Source of Revenue. • Generate Strong Public Support - A True “Win - Win” Scenario ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates