Title of Presentation
Download
Report
Transcript Title of Presentation
Public Open House
February 6, 2014
Study Overview - Study Area
South
North
Key Input Groups
General Public
Stakeholder Working Group (SWG)
Corridor Residents
Business Owners
Interested Stakeholders
Technical Advisory Committee (TAC)
Regional Transportation Commission (RTC)
City of Reno
Nevada Department of Transportation (NDOT)
Consultant Technical Staff
Study Process
We Are
Here
Study Goals
Improve pedestrian, ADA, and bicycle safety and
connectivity to businesses, residents, and
existing facilities
Ensure vehicular progression and Level of Service
to balance improvements for all modes
Foster meaningful community participation for
the entire corridor
Riverside Dr.
California Ave.
Study Goals
Coordinate improvements with development,
residential and business needs
Identify logical, buildable phases to maintain
progress over time
Highlight aesthetics and improve the user’s
experience throughout the corridor
Keystone at I-80
Reno High School
Example Deficiencies and
Potential Solutions
Issue:
2. Poor pedestrian routing and circulation
Opportunities:
• Add signing to avoid south sidewalk dead end
• Consider ramping at Foster overpass versus
existing stairs
• Include full pedestrian facilities with any new
intersection design
Example Deficiencies and
Potential Solutions
Issue:
25. Crash rate is higher (3.05) than statewide
averages (2.41)
Opportunities:
• Propose safety improvements such as refined
signal timing, signal coordination, and
eliminating permitted left turn movements
• Review and implement NDOT Roadside Safety
Audit recommendations
Example Deficiencies and
Potential Solutions
Issue:
36. Difficulty backing in/out of residential
driveways that front Keystone
Opportunities:
• Incorporate buffer space in proposed Keystone
roadway section if possible
Keystone Avenue Bridge
Over the Truckee River
Originally built in 1966
The bridge is in poor shape
Sufficiency rating 28 / 100
“Structurally deficient”
Does not provide pedestrian
or bicycle facilities
The California / Keystone
intersection and the Truckee
River Flood Project are key
considerations
Next Steps
Complete Existing Conditions Analysis
Finalize Corridor Goals
Develop and Evaluate Alternatives
Bring Alternatives Forward for Input
Keystone and Kings Row
How to Submit a Comment
Submit a comment sheet at the greeting table
Complete a Comment Sheet and mail it to:
Patrice Echola
RTC Project Manager
1105 Terminal Way, Suite 211
Reno, Nevada 89502
Submit a question card for the Q&A session
Email your comments to: [email protected]
reference “Keystone Corridor Study” in the subject line
Over 150 comments have been submitted!
Thank You!
Primary Contact:
Patrice Echola
[email protected]
775-335-1904
Thank you for your participation!