Public Open House
February 6, 2014
Study Overview - Study Area
South
North
Key Input Groups
General Public
Stakeholder Working Group (SWG)
 Corridor Residents
 Business Owners
 Interested Stakeholders
Technical Advisory Committee (TAC)




Regional Transportation Commission (RTC)
City of Reno
Nevada Department of Transportation (NDOT)
Consultant Technical Staff
Study Process
We Are
Here
Study Goals
 Improve pedestrian, ADA, and bicycle safety and
connectivity to businesses, residents, and
existing facilities
 Ensure vehicular progression and Level of Service
to balance improvements for all modes
 Foster meaningful community participation for
the entire corridor
Riverside Dr.
California Ave.
Study Goals
 Coordinate improvements with development,
residential and business needs
 Identify logical, buildable phases to maintain
progress over time
 Highlight aesthetics and improve the user’s
experience throughout the corridor
Keystone at I-80
Reno High School
Example Deficiencies and
Potential Solutions
Issue:
2. Poor pedestrian routing and circulation
Opportunities:
• Add signing to avoid south sidewalk dead end
• Consider ramping at Foster overpass versus
existing stairs
• Include full pedestrian facilities with any new
intersection design
Example Deficiencies and
Potential Solutions
Issue:
25. Crash rate is higher (3.05) than statewide
averages (2.41)
Opportunities:
• Propose safety improvements such as refined
signal timing, signal coordination, and
eliminating permitted left turn movements
• Review and implement NDOT Roadside Safety
Audit recommendations
Example Deficiencies and
Potential Solutions
Issue:
36. Difficulty backing in/out of residential
driveways that front Keystone
Opportunities:
• Incorporate buffer space in proposed Keystone
roadway section if possible
Keystone Avenue Bridge
Over the Truckee River
 Originally built in 1966
 The bridge is in poor shape
 Sufficiency rating 28 / 100
 “Structurally deficient”
 Does not provide pedestrian
or bicycle facilities
 The California / Keystone
intersection and the Truckee
River Flood Project are key
considerations
Next Steps




Complete Existing Conditions Analysis
Finalize Corridor Goals
Develop and Evaluate Alternatives
Bring Alternatives Forward for Input
Keystone and Kings Row
How to Submit a Comment
 Submit a comment sheet at the greeting table
 Complete a Comment Sheet and mail it to:
Patrice Echola
RTC Project Manager
1105 Terminal Way, Suite 211
Reno, Nevada 89502
 Submit a question card for the Q&A session
 Email your comments to: [email protected]
reference “Keystone Corridor Study” in the subject line
Over 150 comments have been submitted!
Thank You!
Primary Contact:
Patrice Echola
[email protected]
775-335-1904