Transcript Slide 1

Power Systems division
© ABB Group
July 21, 2015 | Slide 1
Power Systems division
Key deliverables

Electrical, automation, control and
instrumentation for power generation

AC and DC power transmission grid systems
for traditional and renewable energy integration
(HVDC, HVDC Light, FACTS)

Turnkey substations (incl. substation
automation)

Network management and market systems
Power systems services

Consulting and system studies

Repair, retrofit, refurbishment

Software and hardware upgrades

Asset management and diagnostics
Markets served

© ABB Group
July 21, 2015 | Slide 2
Utilities, industry, OEMs, EPCs, channel
partners
Transmission and
Distribution Substations
© ABB Group
July 21, 2015 | Slide 3
Capabilities

© ABB
ABB Group
Group
©
July 21,
21, 2015
2015 || Slide
Slide 44
July
Substations for Power Transmission &
Distribution:
•
Air and gas insulated turnkey substations
up to 220 kV
•
Mobile substations up to 66 kV
•
Engineered packages for substations up
to 220 kV
•
Rehabilitation and upgrade of existing
substations
PSS portfolio includes

© ABB
ABB Group
Group
©
July 21,
21, 2015
2015 || Slide
Slide 55
July
Our portfolio includes, but not limited to:

Sales & marketing, tendering
preparation, value base sales and basic
and detailed design & engineering works
for substations on turn key basis and up
to 220 KV

Civil design, primary design & substation
automation

Supply management with a world wide
ABB chain

Project management & construction
execution include civil, primary
automation & commissioning, starting up
& guarantee for all scope included after
sales service.
PSSS Main Customers

PSSS – EG has executed several strategic projects with different market
segment, such as:

EETC – Power Generation Utilities

EETC – Transmission & Distribution Utility
•
Industry – Steel factories, cement factories, textile factories (paper factories, petroleum &
petrochemical Co.)
•
Domestic private sector – large domestic compounds & touristic resorts, …. etc.
•
Indirect export – Engineered package for Egyptian EPCs.
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 6 EG, range 0908>/ PN / July 21, 2015 | Slide 6
Delivered Projects List

Total of 77 66kV AIS S/S & extension

Total of 5 66kV GIS S/S & extension

Total of 31 220kV AIS outdoor S/S & extension

Total of 3 220kV GIS S/S extension

Participated in consortium with Global Lead Unit for two 500kV
S/S & extension
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 7 EG, range 0908>/ PN / July 21, 2015 | Slide 7
References
Egyptian Electricity Holding Co. – Nubaria 220 kV AIS
Switchyard



© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 8 EG, range 0908>/ PN / July 21, 2015 | Slide 8
Customer need

To deliver 1500MW into the Egyptian grid

To coordinate between the proposed solution and the
interfaces with another 19 packages of the project.
ABB’s response

Delivered turnkey 220kV AIS substation package

Managed to fulfil project milestones helping customer put
service to gas turbines in due course
Customer benefit

Power delivered to the Egyptian grid before summer peak

Due to ABB high performance during handing-over
phase, customer did not receive any back claims
from other packages contractors
Egyptian Electricity Transmission Co.
Yafea Ben Yazeed - 66/11 kV AIS S/S



Customer need

To improve 66kV grid in down town Giza City

To build a 66kV substation in very limited area
ABB’s response

Delivered a turnkey 66kV AIS substation package

ABB managed to furnish a very special design in order to accommodate all switchgear
equipment in such a tight area facing tremendous challenges during execution
Customer benefit

EETC received top quality, newly designed 66kV AIS turnkey substation thus avoiding the GIS
substation extra cost

Improved 66kV grid in a condensed (down town) zone.
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 9 EG, range 0908>/ PN / July 21, 2015 | Slide 9
Abu Zaabal for Engineering Industries
El-Darfala



Customer need

To build a 66kV substation to provide sustainable power supply for their private steel rolling
mill

To interconnect the required 66kV substation to the EETC grid via OHTL
ABB’s response

Delivered the required turnkey 66kV AIS substation package complete with 20Km OHTL

ABB managed to handover contract deliverables in due course and earned customer
satisfaction
Customer benefit

Customer achieved receiving energy from Egyptian grid in due course according to project
milestones

Customer received reliable and heavy duty product

© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 10EG, range 0908>/ PN / July 21, 2015 | Slide 10
Power Generation
© ABB Group
July 21, 2015 | Slide 11
ABB delivers up to 25% of a Power Plant
MV SWITCHGEAR
HV SYSTEM
INSTRUMENTATION
Temperature
Pressure
ANALYZERS
ACTUATOR
ON-OFF,
Controlled
LV
SWITCHGEAR
STEP UP
TRANSFORMER LV DRIVES
AUXILIARY
TRANSFORMER COMMUNICATION
GENERATOR
CIRCUIT
BREAKER
UNIT
PROTECTIO
N
July 21, 2015 | Slide 12
MV DRIVES
PT’s
CT’s
SA’s
1
SYNCHRONIZATION
STAR
POINT
CUBICLE
MV
MOTORS
LV
MOTORS
© ABB Group
CONTROL
SYSTEMS
1
HV- SUBSTATION
TURBINE
GOVERNOR
CONTROL
ROOM
TURBINE
G
EXCITATION
TRANSFORMER
EXCITATION
SYSTEM
What ABB in Egypt can offer in Power Generation
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 13EG, range 0908>/ PN / July 21, 2015 | Slide 13

DCS systems, egineering, comissioning
and service.

DCS panels assembly and testing

MV, LV, drives, transfomrers and related
services

Feild instruments and analyzers

Excitation systems, synchronization and
governers

Covering whole range of instrumentation,
controls and electrical systems for Power
Generation (called „ICE“)

Strong local competence to support Egypt
and Africa Markets
Electrical Engineering for Power Plants
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 14EG, range 0908>/ PN / July 21, 2015 | Slide 14

Site Assessment

Short-circuit, overvoltage, harmonics and
transient analysis

Load flow and voltage drop calculation

Sizing and arrangement of components

Single line diagrams

Determination of voltage levels and protective
settings

Allocation of consumers to LV and MV
Switchgears and interfacing with PP control
system

Cable dimensioning

Dimensioning of earthing system

Lightning protection concept
References
El-Tebeen CCPP, 750 MW

Customer need

New Plant to supply electrical power to the grid

CCPP with 1350 MW electrical power

Turnkey solution for I&C

ABB’s response

Complete design, engineering, installation and
commissioning of DCS and Instrumentation
system
CEPC Egypt

Customer benefits
End user: CEPC

ABB takes full responsibility for engineering
and coordination activities towards customer
and end-user

ABB supports CEDC To fulfill tight and
demanding schedule
Customer: PEGESCO
Year of commissioning: 2009
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 15EG, range 0908>/ PN / July 21, 2015 | Slide 15

Abu QIR, 1300 MW

Customer need


Modernization of 6 x 609 MW coal fired power plant with higher efficiency and lower emissions & redesign for
turbine control and protection
ABB’s response
Abu Qir 2 units,
1300 MW, Egypt

Complete DCS and instrumentation
Customer:
PGESCO

Boiler protection, turbine hydraulics and control
Year of
commissioning:
2011

Model-based MODAN unit control system

Customer benefits

Common, integrated control system for low life cycle costs, covering DCS, boiler protection and turbine control

Leading automation and optimization technology for:



Improving the power plant efficiency and start-up processes
Increased frequency accuracy and grid stability
Replacement of maintenance-intensive mechanical-hydraulic turbine control by electrohydraulic system with higher accuracy and low maintenance cost
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 16EG, range 0908>/ PN / July 21, 2015 | Slide 16
Abu Rawash Water Plant
© ABB
ABB Group
Division Automation Products
©
<sheetsteel
July
21, 2015enclosure
| Slide 17EG, range 0908>/ PN / July 21, 2015 | Slide 17

Application:

Water Treatment Plant

5 Main sections

Raw water intake

Clarification

Filtration

Disinfection

Chlorination

10 “Skid” Mounted Equipment for Filter
Consoles- Quick Replacement

Challenge:

Break through order from Schneider Oriented
Consultant