About Xperdyte
Xperdyte, the software solution tailor-made for the South African Manufacturer.
This comprehensive solution addresses all the critical issues in the production
process.
 Allowing you to set multi-level Bill of Material (BOM) recipes which sets the
standards against which Works Orders are measured.
 The systematic Works Order Routing structure allows for the effective
co-ordination of production tasks.
 The full Material Requirement Planning (MRP) Module reduces stock-outs
and ensures that materials are always readily available for production.
 Optimise your time and resources with Xperdyte’s interactive
Production Scheduling Calendar.
Pastel Integration
As an Authorised 3rd Party Developer for Softline
Pastel, Xperdyte seamlessly integrates into Pastel
Accounting & ERP packages.
Cost Groups
Xperdyte achieves true marginal costing by classifying all costs as either Fixed or Variable
cost types. All costs are also grouped into the following categories.
Cost Groups
MATERIALS
LABOUR TIME
MACHINE SET-UP TIME
MACHINE TIME
BUY-OUTS
OTHER INTERNAL COSTS
Bill of Material (BOM) Overview
Xperdyte considers all factors when setting up BOM recipe’s to ensure accurate costing.
In most cases, a BOM is usually a recipe to produce one finished goods unit, whereas
Xperdyte allows you to enter the recipe for any number of units.
In-depth BOM details
1. Detailed instruction’s for each Work Centre
2. Routing sequences for each Work Centre
3. Labour times for Machine Set-up
4. Material usage including yield losses
5. Labour Time at each Work Centre
6. Buy-outs for outsourced work
7. Other costs for recovery of internal costs
Creating a BOM
This image illustrates the simplicity of creating a
BOM in Xperdyte.
Process through the various Tabs,
entering all the required input
when using the specific BOM
recipe to produce a finished good.
BOM Costing – What If (Break Even)
Adjust, analyse and make decisions with an instant and accurate
Break Even Point Calculation.
BOM Costing – What If (Expense Graph)
Accurate costing with the ‘What If Function’ and Expense Type Comparison Graph
BOM Costing Report
Note the
effect of
fixed &
variable cost
allocation
Note the yield losses at the
raw material and finished
goods level
Note the very
powerful
‘What If’
facility
Opening up a Works Order
Select a specific BOM code to be used, determine the priority
of the job, decide upon the Quantity to Manufacture and adjust
the Works Order Status accordingly.
The various input details required for production is
auto-filled as per the BOM selected to be used to
produce the specific Works Order
Works Order - Instructions
Listing all the instructions, per work centre, to be executed to produce the specific
finished goods as per the specific BOM being used.
Works Order – Work Centres
All the Work Centres involved in the production of the finished good as per the
specific BOM being used.
Works Order - Raw Materials
The Works Order raw materials required to produce the goods as per the
BOM being used.
Works Order – Setup Time
Xperdyte takes into account the setup time required to prepare the machinery
needed for production.
Works Order – Labour Time
The Works Order then lists the labour time required to produce the finished goods
as per the BOM being used.
Works Order - Buyouts
Buyouts refer to all costs incurred for any work which needs to be outsourced for the
particular Works Order to be completed as per the BOM being used.
Works Order – Other Costs
Additional Costs of production as per the BOM.
Works Order – Costing Summary
Costing Summary of the Works Order.
Works Order - Routing Sheets
Xperdyte produces customisable ‘Works Order Routing Sheets’ to be used on
the production floor to assist in the completion of the Works Order.
The Routing Sheets serve as a reporting tool, collecting data to be evaluated and
entered into the system by management.
The reports have separate sections per Work Centre with all the necessary
input details required for each of them.
The next 3 slides will illustrate a basic example of Works Order Routing Sheet.
Works Order – Routing Sheet 1
Works Order – Routing Sheet 2
Works Order – Routing Sheet 3
Works Order – Production Feedback
A Feedback Entry is processed by entering the data collected during production,
against the Works Order.
Fill in the Actual Quantities
used during production
Works Order – Costing Graphs
Once actual production feedback has been entered against the Works Order,
performance can be evaluated with the ‘Standard versus Actual Graph Comparisons’.
Production Scheduling
The interactive Production Scheduling Calendar assists in achieving efficiency through the
co-ordination of tasks and optimisation of time.
Material Requirement Planning (MRP)
MRP is about the creation of demand for materials and the satisfaction of that
demand by evaluating stock on hand and purchase orders.
An MRP system is intended to simultaneously meet three objectives:
•
•
•
To ensure that materials are available for production and products are available for customers.
Maintain the lowest possible material and production levels in store.
Plan manufacturing activities, delivery schedules and purchasing activities.
The process is as follows:
•
•
•
•
•
Sales back orders and or sales forecasting creates demand for Works Orders.
Works Orders satisfy the demand for sales.
Works Orders and safety stock levels also create demand for raw materials and sub-assemblies.
Works Orders for sub-assemblies satisfy demand for its parent part but create demand for
further sub assembles and raw materials.
Raw material and sub-assembly stock on hand, plus, outstanding purchase orders and Works
Orders satisfy demand for their parent parts
Sounds complicated? It is!
Now add the dimension of time to this. When is production to take place, how long will each Works
Order take as well as the lead time from suppliers - and now it’s extremely complicated.
But not with Xperdyte Manufacturing... this intuitive & easy to use software solution systematically
simplifies the tedious task of Material Requirement Planning.
Key Product Features
MULTI-LEVEL BILL OF MATERIALS
WORKS ORDER ROUTING
WORKS ORDERS ROUTING SHEETS
BUY-OUTS AGAINST WORKS ORDERS
MATERIAL REQUIREMENT PLANNING
PRODUCTION SCHEDULING
LOT & BATCH TRACKING
FULL DE-CANTING FACILITY
COSTING REPORTS
PASTEL ACCOUNTING INTEGRATION
Online Training
Online Training for Manufacturers
All of our clients receive a FREE 6 Month subscription to the Gemba Academy to ensure that they are
equipped with the fundamental knowledge of Lean Manufacturing.
Combining the software tools, training and methodology of Lean Manufacturing into one offering
provides an end-to-end MRP solution.
The Gemba Academy is an internationally recognised organisation providing Online Lean
Training to leading manufacturers worldwide. This interactive online learning platform allows you to
provide frequent training to an unlimited amount of employees at your own convenience. The
interactive quizzes and practical exercises ensure continual improvement of your employees skills and
knowledge.
Developers
Xperdyte Manufacturing is developed by
Selected Business Systems.
With decades of experience, the highly-skilled team at SBS are
constantly developing the software to ensure that Xperdyte remains
an innovative and intuitive manufacturing software solution.