TOWARDS A BETTER UNDERSTANDING OF THE PHYSICS …

Download Report

Transcript TOWARDS A BETTER UNDERSTANDING OF THE PHYSICS …

CLUSTER
FOR ENERGY GENERATION IN MEGA- AND NANO- SCALE
prof. Halina Kruczek
Head of steering committee
E-mail: [email protected]
Tel/fax: +48 71 320 39 42
POLTEGOR – MEMEBER OF Cluster
Presentation: BARBARA ROGOSZ
PhD Janusz Lichota
Cluster Secretary
[email protected]
German-Polish Workshop
Wrocław 20 IV 2009
Content
•
The organization structure
•
The fields of potential cooperation
•
Green energy production in power plant – co-firing
liquid and solid biofuel in boiler of energy sector comparison
Cluster- current topics
Current working groups
1.
2.
3.
4.
Biomass, agrobiomass, RES, multifuels boiler
Power Production, reliability and improving of efficiency
Ecological effects of energy production
„group carbon”, clean coal technology, conversion of
brown coal, analysis of new resources (field Legnica)
5. Group for law in field of environment and energy.
6. Group: Numerical calculation support during theoretical
analyses of thermal – flow systems and designing (ANSYS
Software)
The fields of potential cooperation
• Alternative energy sources : geothermal, photovoltaic, biomass, waste biomass
e.g. WASTE BIOMASS →→CLEAN GAS FUEL: Waste biomass pyrolysis
gasification to H2 production
• Combustion of biomass in small and medium size boiler- optimization of burnout
and emission, certification
• Co-combustion of biomass in existing Power &Heat Plants – with high share of
biomass
• Micro CHP
• Lignite pretreatment: UC gasification, Lignite predrying etc.
• Clean coal technology:
•
Gasification of coal for hydrogen production
•
Zero-emission technologies – oxy- fuel, capture technology of CO2
sequestration and storage CO2 hydrates
• Waste management
• Audits, intelligent management of heat energy demand and supply
• Ceramic fuel cell
Green energy production in power plantcofiring liquid and solid biomass in boiler
of energy sector
Installed Power of RES Generating
Electricity
(2000- 690,65 MW ; 2015 - 2500 MW)
Biomass is the most suitable in our conditions to
increase RES share in power production
1.5
28.8
hydro
biogas
%
biomass
wind
1.5
68.2
Energy crops obligatiory share [% in the total cofired biomass]
Polish environment law
100
90 up 2008 julyBinding
80 from August 2008 regulation
70
60
50
40
30
20
10
0
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Sources of Biomass in Poland
Forests Pl [th.ha]
Straw [th.ton]
Date statystyczne GUS, za rok 2002
Gradziuk P. „Słoma energetyczne paliwo”, W-wa 2001
Uncultivated lands [th.ha]
Date statystyczne GUS, za rok 2005
Complexes of usefulness of
agricultural soils
Instytut Upraw Nawożenia i Gleboznawstwa, Puławy
Biomass co-firing for 200 MWe power plant as an example
Solid biomass co-firing in 200 MWe power
plant
General assumptions:
 Biomass is combusted along with basic fuel in
power plant unit 200 MW, Nr 1-8
 Predicted biomass flow – 100.000 t/year
 Maximal biomass share in mass fuel flow is 10%
• Predicted biomass weight 0,25÷0,60 t/m3
* Installation was commissioned in september 2007
Solid biomass co-firing in 200 MWe power
plant
Pellets
Saw dust
Future:
Wood-chips
Agro-Pellets
Solid biomass co-firing in 200 MWe power
plant with high share of the biomass- goal
Concept
Concept of liquid biomass co-firing in 200
MWe and 500 MWe power plant
Scheme of installation
K1
Coal storage
K2
Oil
container
K3
K4
Coal storage
OIL heater
Flue
gases
Flue gases
Concept of liquid biomass co-firing in 200
MWe and 500 MWe power plant
Complete installation of biomass co-firing on all
power plants units is 300 000 t/year.
Heat share of liquid biomass in co-firing is 12%24% depending on type of bio-oil.
Concept of liquid biomass co-firing in 200
MWe and 500 Mwe power plant
Installation output:
 Unit 200 MWe has 6 burners (1-1.5 t/h)and 6
burners other types - ~~400kg/hr; unit 500
MWe has 8 burners (1 t/h)
 Liquid biomass temperature (about 80˚ C) will
be reached utilizing flue gases from SO2
desorption installation
Concept of liquid biomass co-firing in 200
MWe and 500 MWe power plant- pilot
installation
Plans_New units for biomass combustion
Unit consists of grate boiler adopted to
straw combustion and condensate turbine:
 steam flow
- 64 t/h
 steam temperature
- 525 C
 pressure
- 93 bar
 generator power output - 16,5 MWe
New unit for biomass combustion
Concept allows to burn 250 000 t/year
straw
Installation cost is about 50 mln euro
Power plant unit 250MW with CFB
(circulating fluidized bed)
Construction of new unit 250MWe instead of
old unit along with CFB. Utilizing existing
turbine and infrastructure.
Turbine adaptation relays on exchanging
HP- and MP–part (LP-part is new).
Thank you
for your attention
Questions?
Thank you
for your attention
Questions?