No Slide Title

Download Report

Transcript No Slide Title

ILE Project
Integrated Logistics Environment
Kickoff Meeting
NPDI Project & SCIM Summary & Status
Presented by:
Rick Lobsitz (NGTS)
1
NPDI & SCIM

NPDI (Navy Product Data Initiative)
– To specify the requirements for and drive the implementation of
product data systems based on an open architecture having
suitable functionality and enterprise-wide interoperability to
support affordable Navy ship design, construction and service life
support
– Initial version of the IPDE Specification provided to the Navy
represents the naval shipbuilders’ best efforts to build consensus
among the various shipyards

SCIM (Ship Common Information Model)
– Core data model for NPDI IPDE Specification
– Separate document from the IPDE Specification being produced by
the NPDI Project, but is referenced by that IPDE Specification
– SCIM codifies the models developed and prototyped by the ISE
Project under NSRP over the past nine years
2
IPDE Scope
Tool Integration
Other Shipyards
Ext. Application
MRP
Procurement
Publishing
Collaboration
Reqts. Mgmt.
Logistics Support
Test
Construction
Planning
Material Mgmt.
Engineering
Scope of IPDE
Specification
Design
Integrated Product Development Environment (IPDE)
Data Exchange
IPDE Core Capabilities
Product Data Management
• Configuration Mgmt
• Change Mgmt
• Status Dep. Mgmt
• Document Mgmt
•
•
•
•
Product Data Access
Product Model Navigation
Collaboration Tools
Visualization Tools
Reporting Tools
•
•
•
•
Process Control
Access Control
Requirements Tracking
Work Authorization
Reconfigurable IPDE
Product Data Manager
December 8, 2009
Panel Project Final Presentation
3
3
Application Areas in the
SCIM
SCIM Chapters Completed








PDM and Change Management Fundamentals
Structural Moulded Forms
Ship Arrangements
Structural Detailed Design
Piping Functional Design
Piping Physical Design
Common Parts: Procurement
Product Life Cycle Support
To be Validated
under Task 1
SCIM Chapters Required







HVAC Functional Design
HVAC Physical Design
Electrotechnical Functional Design
Electrotechnical Physical Design
Engineering Analysis
Pipe Stress Analysis
Structural CAM
To be Developed
under Task 2
4
SCIM on ISE Tools
5
Initial validation work from
2009 Panel Project

Purpose
– To determine the feasibility of using existing AP214 translators with
NPDI SCIM schema to improve the exchange of early and detail
design data, and perform an initial validation of the SCIM

Scope
–
–
–
–

Develop linkage between AP 214 and SCIM file
Ship and Moulded Form test cases
Structural test cases
Piping test cases
Deliverables
– Test Cases
– SPS Paper – technical approach
– Final Report – includes SCIM recommendations
6
Panel Project
Lessons Learned






Technical approach which links AP 214 geometry and SCIM
ship design data is viable for CAD translators which
generate XML attribute file
SCIM schemas were sufficiently defined for NPDI
specification, but additional work was required for
translator usage
SCIM model is missing STEP geometry definitions
Determined use of SCIM still requires access to ISO STEP
documentation
STEP expertise required to implement SCIM schema
STEP geometry viewer required to hand populate SCIM
files
7
Panel Project
Recommendations
 Incorporate external reference mechanism into SCIM
 Include documentation for STEP geometry model with the
SCIM
 Define mandatory attributes in SCIM documentation
 Validate SCIM schema against STEP schema to identify
any missing attributes or relationships
 Provide a SCIM User’s Guide with examples
 Include fully expanded XML schemas with SCIM
documents
 Reference required ISO STEP documentation where
required