Prospective Risk Assessment
in a Mental Heath Trust
A Study About Ways to Improve the Quality of Care
in Mental Health Services
This research is a CLAHRC fellows project and the fellow is Dr Jenny
Spencer.
The Project PI is Dr Terry Dickerson, Assistant Director of the University
of Cambridge Engineering Design Centre.
The project Sponsor is Cambridgeshire and Peterborough NHS
Foundation Trust (CPFT) through the NIHR CLAHRC for Cambridgeshire
and Peterborough.
Initial Goals
Aim
To test whether two closely related methods for identifying risk
prospectively (both frequently used in industry) can be efficaciously
adapted to a mental health environment.
Goal
1. To verify and validate the use of these tools in a mental health setting.
2. Ideally, to improve patient safety and the quality of clinical care in mental health
settings.
Outcome measures
Primary – Comparison of managerial Prospective Hazards Analysis and clinical staff
Quality Assurance Data Collection results.
Secondary – Change in Patient Safety Culture using MAPSAF. Change in the number
and severity of reported near misses and SUIs.
Timescale
Managerial PHA sessions to be held in January, April and July 2012;
Clinical staff data collection to begin in February and continue through May 2012.
Final data analysis to be performed July – August 2012
Aim of the Study
Prospective Hazards Analysis
Quality Assurance Data Collection
Compare and contrast
Hazards
List
Number
Most likely
worst case
Brief
Descriptio Consequen Probabili
Summary
n
ce
ty
Hazard
001
Patients
might..
Hazard
002
Staff
might..
..
..
Feel
suicidal ..
assess a
skin
condition
..
..
Death
Likely
Severity
Severe
Current
Layer of
protectio
nl
CPN, 6
years
Teams
affected
Environme Change Implemen
nts
required
ted
AO, Crisis
Communit
y
First aid
Certain
Minor
Jr Dr
(SHO)
Old Age,
Adult
Inpatient
..
..
..
..
..
..
• Classify problems using
WHO patient safety
classification system
• Add or change
categories as needed
Hazards
List
Number
Most likely
worst case
Brief
Descriptio Consequen Probabili
Summary
n
ce
ty
Hazard
001
Patients
might..
Hazard
002
Staff
might..
..
..
Feel
suicidal ..
assess a
skin
condition
..
..
Current
Layer of
protectio
nl
Teams
affected
Environme Change Implemen
nts
required
ted
Death
Likely
Severe
CPN, 6
years
AO, Crisis
Communit
y
First aid
Certain
Minor
Jr Dr
(SHO)
Old Age,
Adult
Inpatient
..
..
..
..
..
..
Severity
Health Services Research: Evidence Based Practice
Assess the Clinical Safety and Effectiveness of the Quality Assurance methods under study using
Adequate and Appropriate Research techniques (Quantitative, Qualitative and/or Mixed Methodologies)
Main Study Flowchart
(Engineering Diagram)
2011
Oct
Nov
Dec
Sep
Project Setup
• Project Protocol
• QA Tool Design
• CPFT Permissions
• Peer Reviews
• Ethical Review
2012
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
PHA Arm
• Consists of a management workshop
• Takes place early in this period
Blinding (as far as practicable)
Routine Quality Indicators
QA Arm - Control
= MaPSaF
Timings are
indicative
• Cambridgeshire North
•No Intervention
• Out-of-Hours Service
• CRHT Service
PHA Eval.
QAArm
Arm
- Control
QA
- Intervention
Cambridgeshire South
•• Cambridgeshire
North
••No
QAIntervention
Intervention
Out-of-Hours Service
••Out-of-Hours
Service
•
CRHT
Service
• CR&HT Service
QA Intervention Evaluation
• Objective 2
Blinding (as far as practicable)
• Objective 1
Setup | Collection and Monitoring 
Project Reporting
• Formal
• Objectives 1, 2
and 3
Gantt Chart 1 (September 2011)
AUG
Deliverables
Owner
Planning phase
Duration
3w
Task I
SDO application
Jenny, Rv by Terry
2w
Task II
IRAS application
Jenny, Rv by Terry
2w
Task III
Brief protocol
Jenny, Rv by Terry
1w
Task IV
Approval of brief protocol by CLAHRC lead
Jenny
Belinda Lennox/
Prof Jones
Task VI
Detailed protocol
Jenny, Rv by Terry
1w
Task VI
Information sheet for participants
Jenny, Rv by Terry
1w
Task VII
Consent form for participants
Jenny, Rv by Terry
Team phase
1w
7w
Task I
Review of Ethics submission by R&D
Jenny
Steve Kelleher
Rachel Kyd
1 w
Task II
Approval of Ethics submission by faculty
Jenny, many others
4w
Task III
Ethics submission
Jenny, Terry
1w
Task IV
Introductory presentation for various
committees
Jenny
4w
Task V
Approval of brief protocol by faculty (sought at
Jenny
end of meeting)
4w
Prototype phase
5w
Task I
Introductory presentation for out of area
trainees
Jenny
1w
Task II
Pilot tool with out of area trainees
Jenny, out of area EoE
volunteers
3w
Task III
Peer review of detailed protocol, information
sheet and consent forms by out of area
reviewers
Jenny, 2 out of area reviewers
4w
Task I
MAPSAF 1a
Cecily Morrison
1w
Task II
MAPSAF 2a
Cecily Morrison
1w
Task III
MAPSAF 3a
Cecily Morrison
1w
Task IV
Prospective Hazards Analysis
James Ward/
Terry Dickerson
1w
Task V
Application of Inclusive design toolkit
James Ward/
Terry Dickerson
1w
Task VI
Data collection tool design workshop forum for Jenny
OOH team (Junior doctors)
? Martin Stefan
1w
Task VII
Data collection tool design workshop forum for Jenny
CRHTT
? Martin Stefan
Task VIII
Data collection and ongoing training for OOH
team (Junior doctors)
Task IX
Data collection and ongoing training for CRHTT ? Martin Stefan
8-12 w
Task X
Weekly data analysis
16-20 w
Task XI
Management workshop review of collected data Jenny, ? Others
1w
Task XII
MAPSAF 1b
Cecily Morrison
1w
Task XIII
MAPSAF 2b
Cecily Morrison
1w
Task XIV
MAPSAF 3b
Cecily Morrison
Implementation phase
16-20 w
Jenny
Jenny
Closure phase
1w
16-20 w
1w
5w
Task I
Comparative Risk Culture Analysis
Cecily Morrison
5w
Task II
Completion of collected data analysis (mixed
qualitative and quantitative design)
Jenny
4w
Task III
Comparative Economic Analysis
James Ward/
Terry Dickerson
5w
Annotations
W1
SEP
W2
W3
W4
W1
OCT
W2
W3
W4
W1
NOV
W2
W3
W4
W5
W1
DEC
W2
W3
W4
W1
JAN
W2
W3
W4
W1
FEB
W2
W3
W4
W5
W1
MAR
W2
W3
W4
W1
APR
W2
W3
W4
W1
MAY
W2
W3
W4
W1
JUN
W2
W3
W4
W1
JUL
W2
W3
W4
W1
AUG
W2
W3
W4
W1
W2
W3
W4
W5
Gantt Chart 2 (May 2012)
AUG
Deliverables
Owner
Duration W1
Task I
SDO application
Jenny, Rv by Terry
2w
Task II
IRAS application
Jenny, Rv by Terry
2w
Task III
Brief protocol
Jenny, Rv by Terry
Task IV
Approval of brief protocol by CLAHRC lead
Belinda Lennox/Prof Jones
Task VI
First draft detailed protocol
Jenny and Terry
29 w
Task VI
Information sheet for participants
Jenny, Rv by Terry
2w
Task VII
Consent form for participants
Jenny, Rv by Terry
Planning phase
32 w
Prototype phase
1w
1w
5w
Task I
Introductory presentation for out of area trainees
Jenny
1w
Task IIa
Pilot tool with out of area trainees
Jenny, out of area EoE
volunteers
3w
Task IIb
Second pilot tool with out of area trainees
Jenny, out of area EoE
volunteers
1w
Task III
Create electronic form
Terry
1w
Task IV
Pilot electronic form
Jenny, out of area EoE
volunteers
1w
Task I
Review of Protocol by R&D
Jenny
Steve Kelleher
Rachel Kyd
3 w
Task II
Approval of Brief Protocol by Trust
Jenny, many others
4w
Task III
Ethics submission
Jenny, Terry
1w
Team phase
7w
Await results of ethics submission
Task IV
Introductory presentation for various committees
Jenny
4w
Task V
Approval of brief protocol by meeting members
Jenny
4w
Task VIa
Internal peer review of detailed protocol by EDC
Pat Langdon
6w
Task VIb
External peer review of detailed protocol by statistician
CLAHRC statistician
2w
Task VIIa
External peer review of detailed protocol, information sheet and consent
2 out of area reviewers
forms by out of area reviewers
Task VIII
Approval of protocol by CLAHRC lead* Belinda says if Terry approves the
Belinda Lennox/Prof Jones
protocol it is all right by her
Task IX
Internal review of detailed protocol by trust
Chess Denman, Martin Stefan,
whomever else Chess specifies
Implementation phase
1w
3w
16-20 w
Task I
MAPSAF 1a
?
1w
Task II
MAPSAF 2a
?
1w
Task III
MAPSAF 3a
?
1w
Task IV
Prospective Hazards Analysis - General
James Ward/ Terry Dickerson
1w
Task V
Prospective Hazards Analysis - Detailed
James Ward/ Terry Dickerson
1w
Task VI
Data collection tool design workshop forum for OOH team (Junior
doctors)
Jenny/ Reba Jacob
1w
Task VII
Data collection tool design workshop forum for CRHTT
Jenny/ Reba Jacob
1w
Task VIII
Data collection and ongoing training for CRHTT and OOH teams
Jenny/Reba Jacob
16-20 w
Task IX
Data collection and ongoing training for CRHTT
? Martin Stefan
8-12 w
Task X
Weekly data analysis
Jenny
Task XI
Management workshop review of collected data
Jenny, ? Others
Task XII
MAPSAF 1b
?
1w
Task XIII
MAPSAF 2b
?
1w
Task XIV
MAPSAF 3b
?
16-20 w
1w
Closure phase
1w
5w
Task I
Comparative Risk Culture Analysis
Task II
QADC analysis
Jenny
TaskIII
QADC preliminary report 1
Jenny
?
5w
1w
Task IV
QADC preliminary report 2
Jenny
1.w
Task V
QADC Write up
Jenny / Martin
4w
Task VII
PHA analysis
Task VIII
PHA QADC Comparison
Terry
Task IX
PHA QADC Comparison Write up
Terry
Task X
Comparative Economic Analysis
James Ward/
Terry Dickerson
8w
5w
SEP
OCT
NOV
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W5 W1
DEC
JAN
FEB
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W5 W1
MAR
W2 W3 W4 W1
APR
MAY
W2 W3 W4 W1 W2 W3 W4 W1
JUN
JUL
AUG
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
SEP
OCT
NOV
W2 W3 W4 W5 W1 W2 W3 W4 W1 W2 W3 W4 W5 W1
DEC
W2 W3 W4 W1 W2 W3 W4 W5
Gantt Chart 3 (Current)
2011
2012
AUG
Deliverables
Owner
Duration W1
Planning phase
32 w
Task I
SDO application
Jenny, Rv by Terry
2w
Task II
IRAS application
Jenny, Rv by Terry
2w
Task III
Brief protocol
Jenny, Rv by Terry
Task IV
Approval of brief protocol by CLAHRC lead
Belinda Lennox/Prof Jones
Task VI
First draft detailed protocol
Jenny and Terry
29 w
Task VI
Information sheet for participants
Jenny, Rv by Terry
2w
Task VII
Consent form for participants
Jenny, Rv by Terry
Prototype phase
1w
1w
5w
Task I
Introductory presentation for out of area trainees
Jenny
1w
Task IIa
Pilot tool with out of area trainees
Jenny, out of area EoE
volunteers
3w
Task IIb
Second pilot tool with out of area trainees
Jenny, out of area EoE
volunteers
1w
Task III
Create electronic form
Terry
1w
Task IV
Pilot electronic form
Jenny, out of area EoE
volunteers
Team phase
1w
7w
Task I
Review of Protocol by R&D
Jenny
Steve Kelleher
Rachel Kyd
3 w
Task II
Approval of Brief Protocol by Trust
Jenny, many others
4w
Task III
Ethics submission
Jenny, Terry
1w
Task IV
Introductory presentation for various committees
Jenny
4w
Task V
Approval of brief protocol by meeting members
Jenny
4w
Task VIa
Internal peer review of detailed protocol by EDC
Pat Langdon
6w
Task VIb
External peer review of detailed protocol by statistician
CLAHRC statistician
2w
Task VIIa
External peer review of detailed protocol, information sheet and
consent forms by out of area reviewers
2 out of area reviewers
1w
Task VIII
Approval of protocol by CLAHRC lead* Belinda says if Terry
approves the protocol it is all right by her
Belinda Lennox/Prof Jones
Task IX
Internal review of protocol by trust
Chess Denman, Martin
Stefan, whomever else Chess
specifies
Await results of ethics submission
Implementation phase
3w
16-20 w
Task I
MAPSAF 1a
?
1w
Task II
MAPSAF 2a
?
1w
Task III
MAPSAF 3a
?
1w
Task IV
Prospective Hazards Analysis - General
James Ward/ Terry Dickerson
1w
Task V
Prospective Hazards Analysis - Detailed
James Ward/ Terry Dickerson
1w
Task VI
Data collection tool design workshop forum for OOH team (Junior
doctors)
Jenny/ Reba Jacob
1w
Task VII
Data collection tool design workshop forum for CRHTT
Jenny/ Reba Jacob
1w
Task VIII
Data collection and ongoing training for CRHTT and OOH teams
Jenny/Reba Jacob
16-20 w
Task IX
Data collection and ongoing training for CRHTT
? Martin Stefan
8-12 w
Task X
Weekly data analysis
Jenny
16-20 w
Task XI
Management workshop review of collected data
Jenny, ? Others
1w
Task XII
MAPSAF 1b
?
1w
Task XIII
MAPSAF 2b
?
1w
Task XIV
MAPSAF 3b
?
Closure phase
1w
5w
Task I
Comparative Risk Culture Analysis
Task II
QADC analysis
Jenny
TaskIII
QADC preliminary report 1
Jenny
?
5w
1w
Task IV
QADC preliminary report 2
Jenny
1.w
Task V
QADC Write up
Jenny / Martin
4w
Task VII
PHA analysis
Task VIII
PHA QADC Comparison
Terry
Task IX
PHA QADC Comparison Write up
Terry
Task X
Comparative Economic Analysis
James Ward/
Terry Dickerson
8w
5w
SEP
W2
W3
W4
W1
OCT
W2
W3
W4
W1
NOV
W2
W3
W4
W5
W1
DEC
W2
W3
W4
W1
JAN
W2
W3
W4
W1
2013
FEB
W2
W3
W4
W5
W1
MAR
W2
W3
W4
W1
APR
W2
W3
W4
W1
MAY
W2
W3
W4
W1
JUN
W2
W3
W4
W1
JUL
W2
W3
W4
W1
AUG
W2
W3
W4
W1
SEP
W2
W3
W4
W5
W1
OCT
W2
W3
W4
W1
NOV
W2
W3
W4
W5
W1
JA
W2
W3
W4
W5
W1
Fe
W2
W3
W4
W1
MA
W2
W3
W4
W1
AP
W2
W3
W4
"5
W1
MAY
W2
W3
W4
W5
W1
JUN
W2
W3
W4
W5
W1
W2
W3
W4
Main Study Flowchart
(Engineering Diagram)
2011
Oct
Nov
Sep
Dec
2012
Jan
Feb
Mar
Apr
May
Jun
Jul
Project Setup
PHA Arm
• Project Protocol
• QA Tool Design
• CPFT Permissions
• Peer Reviews
• Ethical Review
• Consists of a management workshop
• Takes place early in this period
Aug
Blinding (as far as practicable)
Routine Quality Indicators
We have additionally written a
Literature Review
And thoroughly researched
our evaluation methodologies
= MaPSaF
Timings are
indicative
QAArm
Arm
- Control
QA
- Intervention
Cambridgeshire South
••Cambridgeshire
North
••No
QAIntervention
Intervention
Out-of-Hours Service
• •Out-of-Hours
Service
•
CRHT
Service
• CR&HT Service
QA Arm - Control
• Cambridgeshire North
•No Intervention
• Out-of-Hours Service
• CRHT Service
QA Intervention Evaluation
• Objective 2
Blinding (as far as practicable)
PHA Eval.
• Objective 1
Setup | Collection and Monitoring 
Project
Reporting
• Formal
• Objectives 1, 2
and 3
Barriers to Project Completion
Is Your Project Research?
•
Service Improvement Project (SIP) vs Health Services Research (HSR)
•
Ethics approval, Sponsorship, Peer review, Indemnity/Insurance, Grant
Contracts, Feasibility, Commercial charges, Service Support Costs,
Identification of PI, Letters of access/Honorary Research contracts
Limit Growth - Project size and goals
Collaborator buy - in
Ethical approval - Appropriate venue
•
University Ethics Boards vs LREC
Service Provider Buy-in as a moving target
•
Changes initiated by people other than you
Hard-to-Measure Work
Learning the ropes
•
Reviewing current literature
•
Studying new methodologies
•
Appreciating the process steps necessary for study approval
Spreading the word:
Creating a positive feel for the project
•
Project documents (including PHA) to:
• Medical director
• Head of Service Improvement
• Clinical Directors
• Risk Assessment department
• Clinical staff who are likely participants
•
Discussions at RCPsych Faculty Conferences
•
Literature Review article submission to a peer reviewed journal
Suggestions for Future Projects
•
Limit project scope (and supervisor enthusiasm)
•
CLAHRC Resources webpage is very useful:
• Research Governance Pathway Guidance http://www.clahrccp.nihr.ac.uk/resources/research-governance
•
Don’t forget to budget time for
• Peer Review, Letters of access/Honorary contracts for all involved,
Indemnity/Insurance, Sponsorship
• As well as Ethical Approval
•
Make sure you really enjoy your topic, because you will be dedicating a lot of
time to it
Thank you for listening.
“Design for Patient Safety”
Department of Health 2003