5S & Visual Controls - managementsupport.com

Download Report

Transcript 5S & Visual Controls - managementsupport.com

Lean Office - 5S and Visual Controls
http://www.managementsupport.com
1
5S and Visual Control




Our Lean program
What is 5S?
5S and Lean Enterprise
Elements of 5S









Sort
Straighten
Shine
Standardize
Sustain
Safety
Visual Workplace
Implementation plan
Summary
2
What is 5S?









5S is a method to improve and sustain workplace organization
5S represents 5 disciplines for maintaining a visual workplace (visual controls and
information systems).
These are foundational to continual improvement and a manufacturing strategy
based on "Lean Manufacturing" (waste removing) concepts.
Reduces clutter
Reduces the time it takes to look for tools and equipment
“A place for everything and everything in its place”
Improves how the operation appears to customers – always be “tour ready”
Creates pride in the workplace
Many companies have a standard that any tool must be able to be found within 60
seconds.
3
The Good, Bad and the Ugly
First the Bad and the Ugly - Life Without 5S
4
Visual Workplace







Mark-off the inventory locations
Mark-off equipment/machine locations
Mark-off storage locations (cabinets, shelves, tables)
Visually indicate amount of allowed inventory
Keep metrics, wall charts, and other information current
Label all cabinets, shelves, etc with their contents
Posted production status, upcoming jobs
5
Red Tag Process



1.
2.
3.
4.
One-time activity to remove or disposition clutter
To be started within two weeks of this training
Area Lead plus and whoever else would like to join us
Identify clutter, unused equipment, etc
Fill out and attach red tag
Note in red tag log
Red tags must be dispositioned within 30 days
6