SDO Ground System Requirements Review

Download Report

Transcript SDO Ground System Requirements Review

Heliophysics Projects
Division
SOWG Meeting
January 18-19 2007
Agenda
(09 January 2007)
Jan 18-19 2007
Page 1
Thursday 18 January (Afternoon)
Heliophysics Projects
Division
Time
Items for discussion
01:30
01:30
02:00
Gather at Bldg 14 door (North)
Introduction, Agenda Review
Calibration maneuvers scheduling and HGA blockage
HGA Blockage: operational overview, timing constraints
Impact on cal maneuvers: scenarios and scheduling
GT calibration maneuver scenarios
Instrument commissioning
Review existing timeline
Gather updates from instrument teams
Tour of MOC facility
Mission Operations Room, and Science Operations Room
SOC input on layout of Science Operations Room
Adjourn
03:30
04:00
04:30
05:00
Jan 18-19 2007
Lead Participants
Defazio
Hashmall
Larduinat, Shulman
Gonzales
Tann, Silva
Page 2
Friday 19 January (Morning)
Heliophysics Projects
Division
Time
Items for discussion
08:30
08:45
Gather at B14 door
Demonstrations
08:45
10:00
10:30
MOC trending system (ITPS)- web interface for SOCs
MOC Planning tool and scheduling timeline
Review schedule of activities for 2007
Ground System schedule and milestones
SOC planned involvement and support
SOC Interface Testing
MOC product server
12:00
Jan 18-19 2007
Lead Participants
Brumer
Sapper
Silva
Larduinat
Updates on planned tests for 2007
Adjourn
Page 3
Attendance List
Tentative as of 09 January 2007
Brumer, Haim
Bryant, Karen
Defazio, Bob
Bush, Rock
Gonzales, Peter
Gregory, Sarah
Hashmall, Joe
Heyman, Gary
Jacobson, Rob
Myers, Dawn
Sapper, Brett
Pesnell, Dean
Shulman, Seth
Scherrer, Phil
Silva, Chris
Schou, Jesper
Sonti, Vijaya
Tate, Gail
Starin, Scott
Wolfson, Jake
Tann, Hun
Woodraska, Don
Heliophysics Projects
Division
VanDyke, Chris
Vess, Melissa
Weikel, Craig
Wofford, George
Jan 18-19 2007
Page 4
Time and Location
Heliophysics Projects
Division
To Bldg 7/29
Parking Lot
Explorer Road
Meet at
entrance
door
Parking Lot
B3
Main gate
Gate
Soil Conservation Road
Parking Lot
B 14
B 13
Greenbelt Road
•
•
•
•
Meeting in Room E280, Building 14 (same as last SOWG at GSFC)
Meeting times: Thursday January 18, 1:30PM to 5:00PM, following IFWG meeting
and Friday January 19, 8:30AM to 12:00PM
Come to the Building 14 door as indicated on the map. Somebody will meet you there since
you need a keycard to enter the building
The conference room is on the second floor, right above the door where we meet.
Jan 18-19 2007
Page 5