Transcript PILPS San Pedro update 090904
L. Bastidas B. Nijssen, H. Gupta W. Emmerich E. Small
Big Delay !
There is a big delay – 1 year
Cause:
Additional quality control of data was required
Very little participation from the community
Lately things have warmed up (last 2 months)
Several groups have submitted results of step 1
Several groups have contacted us indicating they are currently working on the experiment
A new timeline has been proposed
Submitted for approval to the GLASS meeting in Japan
If no additional participation will go ahead with the 9 models already working.
W. Emmerich E. Small L. Bastidas B. Nijssen, H. Gupta
Submitted so far – STEP 1 only
1.
2.
3.
4.
SPONSOR – Institute of Geography, Russian Academy SWAP – Institute of Water Problems, Russian Academy SEWAB – GKSS Research Center, Germany CBM – CSIRO, Australia
Soon to be submitted
5.
6.
7.
8.
9.
MOSAIC - NASA Goddard, USA SSib – COLA, USA VIC – U of Arizona, USA BATS – UCLA, USA Sib2 – USU, USA
L. Bastidas B. Nijssen, H. Gupta W. Emmerich E. Small
Other Modeling Groups
Additional groups that have expressed interest:
Noah – NOAA USA
ORCHIDEE – France
MOSES – Met Office UK
SSib – UCLA USA
CLASS - Canada
L. Bastidas B. Nijssen, H. Gupta W. Emmerich E. Small
Updated Timeline
• • • • • • • • • • • • • • February 2004, Submission of final experimental protocol March 15 th ,2004, Submission of model information and default parameter sets used by the models for semi-arid areas March 15 th , 2004, Distribution of forcing data to the participants through the website www.sahra.arizona.edu/pilpssanpedro October 31 st , 2004, Submission of default parameter simulations STEP 1 November 1 st , 2004, Distribution of calibration data for STEP 2 and STEP 3 November 30 th , 2004, Submission of results from STEP 2 – ad hoc calibrations January 31 st , 2004, Submission of results from STEP 3 – automatic calibrations February 1 st , 2005, Distribution of data for STEP 4 February 28 th , 2005 June 15, 2004, Submission of results from STEP 4 March 31 st , 2005 June 30th, 2004, Submission of results from STEP 5 April 1 st , 2005 July 1st, 2004, Distribution of data for STEP 6 April 30 th , 2005 July 30th, 2004, Submission of results from STEP 6 August/September 2005, Workshop for analysis of preliminary results, at Utah State University.
January, 2006, AMS session for final analysis and presentation of results
L. Bastidas B. Nijssen, H. Gupta W. Emmerich E. Small