Some Parameters in extraction
• • • • Extraction requirement estimation: (1) 13 turns injection scheme (horizontal tune 1.72) (2) 5 mm septum thickness (3) 60 MeV injection and extraction energy • Total energy delivered to the target in pulsed mode: • Assuming linac current 0.5 A, inject 40ns electron beam per turn. with 13 turn accumulation, we obtain
Q
0 .
5
A
40
ns
13 260
nC Energy
QE
260
nC
60
MV
15 .
6
J
Accumulated beam after injection
• After multi-turn injection, we will carry out single-turn extraction. Below is the accumulated beam at the septum right after the last injection turn.
0.015
0.01
0.005
-0.01
0.01
0.02
0.03
-0.005
-0.01
Electrostatic kicker for extraction
The injection and extraction share the same section in the ring. Beam size is about 50 mm . So we need to bump the closed orbit by 47 mm in order to kick the whole beam into the septum.
x’ 5mm 25mm 25mm x 8mm
x co = 47mm
x co
(
s
) 2 sin (
s
) 2
i
1
i
i
cos (
s
)
i
k
36
mrad
Closed orbit bumped for extraction
Kicker field and aperture requirement
k
36 .
6
mrad
orbit bump. Using electrostatic kicker:
k
c E
B L
and
B
0 .
2 [Tm] for 60 MeV extraction Thus we get E L=2.2 [MV/m] [m] for 60 MeV extraction. If assume 50mm kicker length, displacement within the kicker are: Kicked beam θ k beam
x co
x co
tan( 0 .
006 / 2 ) 1 .
5 13th injection turn.
x co
turn).
L
tan( 0 .
036 / 2 ) 9
mm
at extraction (after 13th injection
x
1 .
75
Aperture requirement for kicker 2 44
mm horizontal aperture is enough for the 2 nd kicker.
0.02
0.01
13th injection turn at the entrance of the second kicker.
x co = 1.5mm.
0.01
0.02
-0.01
-0.01
During extraction, kicker is shut down, so the phase space at the kicker location is like
Aperture requirement for kicker 1 After 12 th injection turn, we shut down kicker 2. Thus, the 13 th injection turn phase space at the kicker 1 entrance requires –x aperture to be at least 26mm
.
0.015
x co
9
mm
at the exit 0.01
0.005
-0.025
-0.02
-0.015
-0.01
-0.005
-0.005
-0.01
-0.015
-0.02
0.005
0.01
Total horizontal aperture required : 52mm
Vertical Lambertson extraction magnet
The vertical Lambertson septum is used to extract beam vertically.
Injection Extraction
Septum
0.81m
35 35 35
1.15m
1.15m
0.2m
We put the septum in the middle of the drift space where (kick sept.) / 2 .
z
'
B x B
l
we choose
z
' 35 deflected by the septum to avoid the next element.
Septum strength and aperture
x 35 z z • For 60 MeV extraction,
B
B
0 .
0834 [
Tm
] 0 .
2 [
Tm
]
B x B x
0 .
25 [
T
] 0 .
61 [
T
] the 50mm horizontal beam size, we need 50mm and 1cm vertical aperture.
horizontal aperture