Transcript Slide 1
BRAZIL COUNTRY REPORT Gustavo Tinoco Economist Agência Nacional do Petróleo, Gás Natural e Biocombustíveis Presentation Structure 1. INTRODUCTION 2. BDEP FACTS AND NUMBERS 3. BDEP OPERATIONS 4. BDEP STRATEGIC PLANNING 5. LESSONS LEARNED INTRODUCTION 1.1. Agency Responsibility ANP is the National Regulatory Authority for the Petroleum and Gas Industry – from the upstream to downstream activities ANP has autonomy in Its board of director decisions and Its own annual budget In the government structure ANP works under the Ministry of Mines and Energy According to the Law n°9478/97: Art 22. The technical assets, formed by data and information on the Brazilian sedimentary basins, are also considered an integral part of the national petroleum resources, to be collected, maintained and administrated by ANP. 1.1. Agency Responsability (cont.) Data Regulation issues New geological / geophisical research depends on ANP authorization All new data acquired in petroleum exploration and explotation must be copied to ANP ANP must create a National Data Repository ANP must receive and maintain those and other data and make them available to the public Petrobras had to transfer all its petrodata to ANP (2,30% of current data collection) In 2000 – BDEP is founded 1.2. When did the NDR start? 1998: Petrobras Data collection transfer to ANP (legacy data) 2000: Technical cooperation agreement with Geological Survey from Brazil (CPRM) The competitive market structure led to a growth of data acquisition Seismic Data activities inside 1.800.000 km seismic lines Brazilian territory Well Data 19.000 wells Non-seismic Data 912.500 km non-seismic data Represents 2,3% of current BDEP´s Data collection In volume 1.3. BDEP Activities Data collection Confidentiality Period • ANP (study and offer blocks) ANP Standards • Oil Companies (exclusive data) • DACs Data Acquisition Companies (non-exclusive data) • ANP data acquisition (foment data) Data Delivery • Licensing Rounds (data package) Quality Control Data Loading Data Storing • Associated Members • Eventual Users • Universities 1.4. BDEP Geographical Scope 33 Sedimentary Basins 7 with oil production Campos and Santos Basin > 90% oil production 7,5 million km2 5,0 million km2 – Onshore 2,5 million km2 – Offshore 1.5. Status of the NDR Mature Under Development Planned Well Data Store Seismic Data Store Non-Seismic Data Store Non-Seismic Standards Automation of Quality Control Modern Technologies for Data delivery Database Integration Core Samples Facilities BDEP FACTS AND NUMBERS 2.1. Major Purposes of the NDR The BDEP is considered as a key factor to access the oil sector inside Brazil The efficient and easy access to petroleum data is essential for the decision making process inside oil industry BDEP data collection is important to: Offer new exploration blocks on ANP Licensing rounds; Study and support investment decisions On those offered blocks Increase geological knowledge Sea level 2.000m 3.500m 5.000m 6.000m 2.2. BDEP yesterday and today 2000 2010 INCREASE 3,12 PB x 44 TOTAL COLLECTION 0,071 PB NUMBER OF MEMBERS 27 14 NUMBER OF APPLICATIONS x 1,9 519 x 3,7 10,3 mi x 3,2 140 REVENUE 3,2 mi 2.3. Data types e Volumes BDEP OPERATIONS 3.1. Operation of the NDR ANP TEAM (15) – Team coordination / planning / internal control: Only by civil service public exam (bureaucracy) OUTSOURCING COMPANY (32) – IT services/ Wharehousing and Data Processing support: Service Acquisition Tender process (bureaucracy) Banco de Dados de Exploração e Produção SOFTWARE COMPANY (10)– PetroBank MDS Technical Support / BDEP Maintenance / New tools: Service Acquisition Tender process (bureaucracy) TECHNICAL COOPERATION AGREEMENT (2)– Acquisitions and service contracts management MEDIA TYPES 3.2. Data Submission SEISMIC DATA • 3592 cartridges • DVD WELL DATA • CD • DVD • Hard Copy Reports NON-SEISMIC DATA • CD • DVD • Hard Copy Reports • On-line data submission and delivery: under construction • ANP Standards need to be updated 3.3. Standards Used Submitted Data must be sticked to ANP standards: Seismic Data – ANP1B; Well (Composite Log and Well Data) – ANP05 e ANP07; Potencial Methods – ANP2B; Coordinate System and Polygons – ANP4B; Formation Test – ANP08; Rocks and Fluids – ANP06. Being studied: geochemistry and specific non-seimic data (eletromagnetic, telluric, others). 3.4. Access Methods BDEP WebMaps Basic information access: Surveys available Surveys name Surveys Location (...) HelpDesk Team 3.5. Data Publication/ Release USERS BDEP serves the whole community interested on activities of oil exploration and production in Brazil. We divide users into four groups: “Associated Member” • Members pay for a annual quota, according to one of three available plans. Aditional data with lower prices • Smaller producers special plan “Eventual Users” “Universities” • Eventual users can ask for specific data anytime, but at a higher cost • ANP provides a quota of free access for academic purposes “ANP” • BDEP provides data to support ANP studies upon specific areas • DATA PACKAGE for Licensing Rounds ONLY PUBLIC DATA CAN BE RELEASED TO EXTERNAL USERS ANP CAN ACCESS ALL DATA COLLECTION AT ANYTIME 3.5. Data Publication/ Release – ASSOCIATED MEMBERS Eventual Users: all the others concessionaires and service companies 3.5. Data Publication/ Release – DATA DELIVERED In 2010 BDEP operated 519 data requests (9% of them from ANP – internal clients) It´s listed bellow the amount of data delivered to BDEP clients: POST-STACK SEISMIC • 3.77 TB PRE-STACK SEISMIC • 8.04 TB WELL LOGS • 854 Wells WELL REPORTS NON-SEISMIC PROGRAMS • 1,565 • 15 programs 3.6. Service Charges (cont.) EVENTUAL USERS Well Data Well Log (per well) Well Report Composite Log AGP LAS curves (4 curves per well) Geochemical Analisys per well $ $ $ $ $ $ 870,00 680,00 780,00 480,00 680,00 220,00 $ $ $ $ $ $ ANP1 Prices 340,00 270,00 310,00 190,00 270,00 130,00 $ $ 850,00 850,00 $ $ 330,00 330,00 $ $ 270,00 180,00 $ 350,00 $ $ 300,00 180,00 Seismic Data 10 Gb Cartridge of Pre-stack 1 Gb of Seismic Post-stack Non-Seismic Data Non-seismic Projects After 1998 Non-Seismic Projects Before 1998 Studies and Reports Geological and Geophysical Studies and Reports (per CD) Client Room Client Room Access (per hour) Technical Suport for Client Room (Pay once) 3.7. BDEP Funding Model OPERATORS & ANP Annual Budget EADs $$$ Receives: Well, Seismic and Potential field data BDEP ANP $$$ UNIVERSITIES COMPANIES (Association Plan / Eventual Users) Provides: Public data BDEP STRATEGIC PLANNING 4.1. Challenges and Successes STRATEGIC PLANNING 2009-2014 MANAGEMENT QUALITY EFFICIENCY SERVICES 4.1. Challenges and Successes (cont.) Vision "Being an international reference center on technological innovation, search, collection, storage, availability, processing and interpretation of technical data acquired in Brazilian basins, providing services, encouraging and subsidizing the oil and natural gas in Brazil within five years”. 4.1. Challenges and Successes (cont.) HIGH PRIORITY MEDIUM PRIORITY LOW PRIORITY ITEM PROJECT NAME ITEM PROJECT NAME ITEM PROJECT NAME 1 SIATA 17 GIS for Pipelines 25 PCN / Disaster and Recovery 2 3 ITEM ITEM 1 Remaster HIGH PRIORITY HIGHPROJECT PRIORITY NAME Analysis PROJECT NAME SIATA Backlogs SIATA 4 1 5 Unit 2 Management Remaster BDEP/PMO 2 6 7 8 9 10 17 20 21 Remaster - Wells 3PowerQC Web Analysis 3 GIS for Environmental Data MEDIUM PRIORITY MEDIUM PRIORITY Non-Seismic Data ITEM PROJECT NAME 19 Standardization ITEM PROJECT NAME 18 Analysis QC on 100% of incoming seismicBacklogs data 4 Backlogs Project Budget Management Unit 5 BDEP/PMO Integrated Management Management Unit 5 SystemBDEP/PMO - SGI 6 PowerQC Web - Wells 4 Post-Stack Seismic Data to Storage 6 Migration PowerQC Web - Wells 18 19 19 23 24 20 20 21 21 22 22 23 11 QC on 100% of incoming 7 seismic data QC on Outgoing Data 12 7 seismic data 8 PowerQC Project Budget - Seismic 23 24 QC on 100% of incoming 8 Project Budget 13 Integrated Management Seismic Data Processing 9 14 Integrated Management Data Standards 9ANP Post-Stack Seismic Review System - SGIData 10 16 28 26 29 26 Data On-Line Data Non-Seismic Data Submission/Delivery Standardization 30 27 Standardization Automated Access to Data CollectionRoom 3D Visualization 31 Non-Seismic Data 27 28 29 Data Print 29 On-Line Data Submission/Delivery 30 Submission/Delivery Automated Access to Data Collection 31 On-Line Data Automated Access to Data Collection Cooperation With Universities Recovery Oil and Gas Production BDEP Training Center and Storing Reports Oil and Gas Production and Storing Reports Seismic and NonSeismic e-BID Data Integration e-BID GIS for Seismic Lines Technical-Scientific Extention 28 Room Data Print 25 Technical-Scientific Recovery PCN / Disaster and Magazine 30 Magazine Technical-Scientific Magazine BDEP Training Center BDEPand Training Seismic Non- Center Seismic Data Seismic and NonIntegration Seismic Data GIS for Seismic Lines Integration Extention 31 GIS for Seismic Lines Extention Cooperation With Universities System - SGI Migration to Storage 15 24 GIS for Environmental Data Data GIS forPrint Environmental 3D Visualization Cooperation With Universities PCN / Disaster and 25 Room 17 3D Visualization GIS for Pipelines 18 22 GIS for Pipelines Oil and Gas Production and Storing Reports LOW PRIORITY LOW PRIORITY ITEM PROJECT NAME 27 e-BID ITEM PROJECT NAME 26 Post-Stack Seismic Check on Well Reports 10 11 Data Migration to Storage QC on Outgoing Data Creation of ANP Standard for Well Reports 11 12 QC on Outgoing Data PowerQC - Seismic 31 Projects to achieve our strategic goals Projects highlights ON-LINE DATA SUBMISSION/ DELIVERY Integration with Petrobras network to transfer well data and poststack seismic data through a dedicated link SFTP to exchange gravimetry data with universities Extend on-line access to entire oil industry AUTOMATED ACCESS TO PRE-STACK DATA COLLECTION Increase storage capacity or buy a new robotic tape library (in study) Remaster Project: Reduce amount of tapes (3590 – 3592) with quality check Projects highlights NEW SERVICES Build a 3D visualization room Acquire WorkStations and softwares to make possible seismic data processing and analysis inside BDEP facilities Project PowerQC for Well Data Web Systems to data certification Basic quality control done by companies using our software BDEP Web System Assure Data Quality Avoid waste of time on data returning Increase team efficiency BDEP OIL COMPANIES / SPECS Project PowerQC for Well Data All the submitted well data to BDEP goes through a quality check process before loading the data at PetroBank The Quality check is based on the standard ANP05 – for well logs QUALITY CHECK STEP 1 Performed by companies Using PowerQC tool Check the conformity of the LIS and DLIS archives with ANP 05 standard QUALITY CHECK STEP 2 Still manual Validation of the mnemonics from standard ANP05 Check compatibility with ANP database (SIGEP) Project PowerQC for Well Data EFFICIENCY GAINS The well team does not spend a minute performing QC1 – It used to take 35 minutes per well in average A lot of data was returned to companies for failing at QC1 – now data only gets inside BDEP with PowerQC certificate It is a first step for on-line data submission Project Remaster Tape Transcription (3590 to 3592 tapes): 205 thousand tapes are going to be copied Quality control on pre-stack seismic surveys Assure Data Quality Reduce amount of tape stored at BDEP Assure automated access to prestack seismic collection Project runs 24h a day inside BDEP facilities Project Remaster OPERATION TEAM SEISMIC TEAM Copies the tapes 24 hours a day Works on the copied tapes Controls all process of copying Performs a quality check to certificate the data Errors during copying process: - Incomplete data - Corrupted Tape - Duplicated traces - Assembling error - Wrong Label (1,3% with problem up to now) Load and retrieve the data inside the system to check compatibility with the original data Project Remaster Timeline Project Goals Aug 2007 Dec 2007 Dec 2008 Apr 2008 Dec 2009 Nov 2010 Dec 2010 Mai 2011 Remaster is launched Jun 2012 End of Remaster 6.819 Tapes copied 46.914 Tapes copied Data certification by seismic team begins 78.370 Tapes copied 110.000 Tapes copied 126.988 Tapes copied 150.000 Tapes Copied 205.805 Tapes Copied 9.992 Tapes certificated 33.000 Tapes certificated 46.121 Tapes certificated 80.000 Tapes Certificated 205.805 Tapes Certificated LESSONS LEARNED The necessity to create mechanisms to reduce the work of the NDR with Quality control by transferring this responsibility to the companies Lack of job instructions in the past for the adequate loading process generated a lot of work on data loaded incorrectly and with lack of information (data attributes) Feedback from BDEP users and oil industry is very important to improve our services Tendering a whole new solution for BDEP in near future: huge effort to design and write down all the specifications and Service Level Agreements for the new solution (what we want?) Thanks! Gustavo de Freitas Tinoco Economist Tel: (+55 21) 3545 - 0405 E-mail: [email protected] www.bdep.gov.br