Transcript Slide 1

Steering Committee
September 10, 2009
1





Introduction of Consultant Team
Introduction of Steering Committee
Role of Steering Committee
Project Overview
S.W.O.T. Discussion
2













Renee Brown – Bellefonte Borough Council
Vana Dainty – Vice-President, Bellefonte Borough Council
Robert Dannaker – Bellefonte Borough Planning
Commission
Richard Fornicola – Waterfront Property Owner
Wendy Fultz – Cool Beans
Stanley Goldman – Mayor, Bellefonte Borough
Erin Hammerstadt – HARB Consultant & Preservation
Pennsylvania
Don Holderman – Assistant Manager, Bellefonte Borough
Gary Hoover – Bellefonte Chamber of Commerce
Kim Kowalyck – Café on the Park
Samuel McGinley – Northwest Savings Bank
Gregory Wendt – M&T Savings Bank
Kim Wheeler – PA Department of Economic and
Community Development
3







Serve as a resource for ideas and approaches
Provide direction to the consultants
Review material prepared by the consultants
Provide input on proposed strategies and
actions
Participate in the public input process
Provide updates to Council
Review and comment on the final plan and
advise Council of the Committee’s
recommendations
4
PARTNERS
COORDINATION
THE TEAM
TASKS
THE DETAILS
THE RESULT
5
THE MASTER PLAN
IS THE RESULT OF
COLLABORATION
AND
CONSENSUS
OF THE
PARTNERS
•AGENCIES
•CONSULTANT EXPERTISE
•STEERING COMMITTEE
•DCED
•BELLEFONTE BOROUGH
•BOROUGH RESIDENTS
DCED
BELLEFONTE
BOROUGH
STEERING
COMMITTEE
MASTER PLAN
6
Delta Development Group, Inc.
Karen Dickinson, Project Manager
Teresa Sparacino
Chris Johnston
EADS Group, Inc.
Jake Steinbugl
Reynolds Smith and Hills, Inc. (RS&H)
George Dickie
Ron Sill
7
PROVIDING PROVEN RESULTS SINCE 1988
From Planning to Implementation:
Community and Economic Development
Real Estate Development
Information Technology
8
◦
◦
◦
◦
◦
Trade and Transit Center
Downtown movie theater
Public investment = $40 million
Private investment = $100 million
PHMC navigation
9
Engineering Architecture and Design Services
“Quality Service with Integrity”
The EADS Group:
was established in 1955
is ISO 9001:2000 Certified
is Employee Owned and Managed
has 200+ Professional and
Technical Staff
• has 6 Office Locations
•
•
•
•
10
11
12
13
14
15
THE VISIONING PROCESS
17
Project Tasks
Understand the Project Area
Build Public Consensus
Market Assessment and Feasibility
Create Redevelopment Concepts
Implementation and Funding Strategy
18
◦ Review Background Materials
◦ Parcel profiles
19
◦
◦
◦
◦
Demographic characteristics
Current and planned retail establishments
Business owner interviews
Consumer profile
20
◦ Steering committee
◦ Public meetings
 SWOT
 Conceptual designs
 Final plan
◦ Stakeholder interviews
 Business
 Resident
 Community organizations
21



Short-, mid- and long-range goals
Private/public partnerships
Creative financing tools
22







What can the site accommodate?
What connections need to be made between the
waterfront and core business district?
What traffic and parking impact will development of
the waterfront district have on the core business
district?
What streetscape enhancements can be implemented
to create a cohesive theme connecting the waterfront
and core business districts?
What retail and commercial opportunities
complement existing business?
What residential opportunities exist in the waterfront
and downtwon districts?
What are the market strategy and land use options?
23



Demographics
Businesses
Physical site conditions
 History of Place
 Transformation
 Current Conditions
24






1-mile ring (center of the ring = intersection of
High Street & Water Street)
Projected slight population increase over next four
year period (2008-2013)
Income is shifting from lower percentage of
households in the < $15,000 range to higher
percentage of households in the $50K +
Loss in families means lower percentage of persons
in the 0-14 age bracket
Higher percentage of persons are in the 45-64 age
bracket.
Additional Study: Current downtown consumers to
better define market area
25
26
27

Physical site conditions

History of Place
28
Fragments of the Past
29
Lost Treasure
30
Transformation
31
Current Conditions
33
Southern Site
34
Mid Section
35
North Gateway
36
Overview from the West
37
Context & Edges
38

Strengths
◦ Assets to build upon

Weaknesses
◦ Challenges to development

Opportunities
◦ Create vibrant waterfront and downtown

Threats
◦ Things that cannot be controlled
39