Transcript Document
EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Tuesday, October 17, 2006 Time Program 8:00 a.m. Welcome and IMWOG Update Speaker Denise Robinson 8:10 a.m. EFCOG Overview Pan Horning 8:30a.m. Enabling the Missions: The Role of Infrastructure 9:00 a.m. 9:20 a.m. Office of Science: F&I Management and Investment OECM Update Jeff Smith, ORNL Deputy Director for Operations John Yates 9:40 a.m. Break OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Ed Dailide EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Tuesday, October 17, 2006 Time Program 10:00 a.m. Safety in Infrastructure Maintenance and Construction: Panel Discussion Speaker Pam Horning John Howanitz Recent Safety Program Improvements at the Savannah River Site Nevada Test Site Perspective on Excavation/Surface penetrations Managing Maintenance Error Using Human Performance Improvement 11:30 a.m. Operations and Maintenance Sustainment Models 12:00 – Working lunch: 10CFR851 Implementation 1:00 p.m. Brian Dowdy OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Tony Renk LaMar Palmer Lynnwood Dukes Peter O’Konski Frank Russo EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Tuesday, October 17, 2006 Time Program Speaker 1:00 p.m. Work Management: Assist Visits Experience Tony Jennings 1:30 p.m. Improving Construction Project Management and John Bernier Performance 2:00 p.m. Construction Management Subgroup Overview 2:15 p.m. Poster Session (Pre-conference area) 3:30 – 4:30 p.m. 5:00 – 7:00 p.m. ORNL LEED Walking Tour (ORNL East Campus) Assemble in Tennessee Rooms 202 A&B Reception (Pre-conference area) OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY John Howanitz EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Tuesday, October 17, 2006 Time 2:15 p.m. IMWOG Subgroups Poster Session Other Program Asset Acquisition/Disposition Cynthia Woodward Asset Management and Performance Measures Jill Farrell Construction Management John Howanitz Maintenance Lynn Eberhardt Work Management Tony Jennings NSTec Janet Gloyd Whitestone Maintenance Management Peter Lufkin Washington Savannah River Infrastructure and Work Management Rick Fleming Human Performance in Maintenance LaMar Palmer OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Speaker EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Wednesday, October 18, 2006 Time Program Speaker 8:00 a.m. Welcome and Announcements Denise Robinson 8:15 a.m. Keynote Speaker Infrastructure and Mission Accomplishment: A Linkage Transforming While “Under Fire” Chris Weaver, Rear Admiral USN (Retired) 9:15 a.m. Roofing Asset Management Program (RAMP) Mike Ginder 9:45 a.m. Break OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Wednesday, October 18, 2006 Time Program 10:00 a.m. Asset Management Panel 12:00 – 1:00 p.m. Speaker Jill Farrell President’s Management Agenda on Real Property Peter O’Konski FIMS Data Quality Peter O’Konski Extended Equipment Service Life and its Implications Bernie Mattimore Peter Lufkin Working Lunch: NNSA Complex 2030 Vision Kim Loll OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Wednesday, October 18, 2006 Time 1:00 p.m. 1:30 p.m. Program Speaker Project Management in the DOE Pete Offringa Asset Acquisition Panel Patrick Dempsey EFCOG Alternative Finance Survey Results Lanny Bates Alternate Finance Lessons Learned Cynthia Woodward DOE Update on Alternate Finance Ed Dailide 2:45 p.m. Break 3:00 – 5:00 p.m. Tour of SNS/CNMS Assemble in lower lobby to board bus OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY EFCOG Infrastructure Management Working Group Annual Meeting October 17-19, 2006 Thursday, October 19, 2006 Time Program 8:00 – IMWOG Subgroup Meetings 11:00 a.m. Asset Acquisition/Disposition (Tennessee Room 202C) Asset Management and Performance Measures (Cumberland Room 219) Construction Management (Buffalo Room 215) Speaker Lanny Bates Jill Farrell John Howanitz Maintenance (Tennessee Room 202 A&B) Lynn Eberhardt Work Management (Emery Room 214) Tony Jennings 11:00 a.m. IMWOG Steering Group Meeting (Harpeth Room 212) OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Denise Robinson