Hong Kong-Zhuhai-Macau Bridge
Download
Report
Transcript Hong Kong-Zhuhai-Macau Bridge
Hong Kong-Zhuhai-Macau
Bridge
An example of sustainable development
About the HZMB project
A series of bridges
and tunnels to
connect West PRD
with Lantau, Hong
Kong
Length: 29 km
40 mins travel time
compared with the
present 4-5 hours
About the HZMB project
Estimated
construction cost:
$5.47 billion
Construction starts
in 2009 or 2010
Completed in 2015
Reasons for the HZMB
To cope with the increasing cross-border
demand
To relieve congestion in other crossborder points, e.g Lo Wu
To change the present travel pattern in
West PRD which relies heavily on water
transport
To enhance economic development in
Zhuhai and Macau
Economic benefits of HZMB
Promoting the development of tourism
( more investment opportunities)
Reinforcing Hong Kong's status as an
international shipping and aviation center
Better connectivity with the West PRD
Facilitate the industrial growth
Development of Boundary Crossing
Facilities (e.g. Shopping centres,
recreational facilities etc.)→ job
opportunities
Drawbacks of HZMB
High construction cost (HK has to share
>50% cost)→ ↑ toll
Competition from the Macau logistics
(because cheaper)
↓export of service (because tourists
might buy the goods from Macau)
License limitation → Low traffic flow
Social benefits of HZMB
Perfecting the regional transport
network(↓ travel time from 3-4 hrs to 30
mins)
Promoting the socio-economic
development of the Pearl River West
Well-linked with the railway and airport
Improving the relations between them, it
might lead to further future cooperation
Social costs of HZMB
↑ cars from Macau → ↑ traffic flow →
deteriorate local trafficability
↑ risk of spreading of diseases from
Macau (because easier and more frequent
contact between each other)
The construction of the HZMB may need
resettlement of residents in San Shek
Wan, northern Lantau
Environmental considerations
HZMB Hong Kong link road will not
touch any land area of Lantau. It will span
across the headland between San Shek
Wan and Sha Lo Wan by a viaduct (X
affect the environment)
Tunnels are used to minimize visual
impact
Environmental impacts of HZMB
↑ cars from Macau → ↑ traffic flow → ↑
risk of traffic congestion → air pollution
→ environmental degradation
Noise pollution from heavy cross-border
traffic
Water pollution is caused during
construction work as dredging of sea bed
is necessary
spoil natural beauty of Lantau Island
Inspection facilities
2 options: one in the east of Chek Lap
Kok Airport, opposite to Tung Chung
New Town
Another in the west of Chek Lap Kok
Airport, near present delta area of Tung
Chung river