Transcript Slide 1
Lovejoy ISD – State of the District Change Brings Opportunity • Opportunity to bring the best of the elementary program to a secondary program • Opportunity to self-evaluate and identify those areas in need of improvement • Opportunity to create a program that adds value to the education experience of all children Critical Questions – Can we financially support the program that our children deserve? – Can we build an academic program that prepares all children for the future of their choosing? – Can we design and build the facilities that are a match for the community? – Can we leverage technology to improve academic performance for all learners? – Can we recruit highly competent teachers? Lovejoy Graduate Profile • • • • • Intellectually Equipped Open to the Challenges of Learning Well Rounded Fair and Respectful Working for Justice in the Community Why a TEKS based focus K-12? • The Texas Essential Knowledge and Skills (TEKS) are the prescribed curriculum in Texas • In districts with two academic tracks there are no difference in the TEKS that a student is expected to learn, therefore, all core courses in grades 6-10 will be labeled “PreAP” in Lovejoy • The TEKS are fully aligned to the national standards – mastery of TEKS results in strong performance on standardized tests such as SAT/ACT Curriculum of Opportunities Advanced Placement (AP) Advanced Placement Program® (AP®) courses give you a head start on college. Tests occur each May after the course Tests are scored 1-5 (3,4,5 are passing) Depending on the College/University, passing AP scores could gain student college credit Wide variety of AP courses will be offered at LHS LISD AP Program Philosophy • Open Enrollment—All students who have the desire to challenge themselves with more advanced courses can do so. • All students will be encouraged to take at least one AP course during grades 9-12. • All core courses in grades 6-10 will based on the TEKS and will prepare our children for an AP® course if they so choose Curriculum Summary Points • Algebra for all (or virtually all) in 8th grade – Accomplished through additional instructional time for students and curriculum refinement • Prepare all students to take Advanced Placement (AP) courses in 11th and 12th grades if he/she chooses Growth Areas for LISD • Support for Special Needs Students • Commended Performance Analysis – District posted strong performance in Grades 3 and 6 (Reading and Math) at Lovejoy Elementary and Grade 5 (Science) at Hart – District showed a need for additional attention in 11 of the 20 areas tested – District posted areas of concern in Grade 5 Math and Grade 4 Writing at both campuses Academic Excellence Indicator System AEIS Report School Year 2004-05 2004-2005 AEIS Report • Focus on student performance data • New data information for Student Success Initiative • Reports available at each campus • Link to report will be on LISD webpage TAKS Met Standard (Sum of All Grades Tested) 100 97 98 97 97 98 92 90 90 81 80 70 60 LISD 04 LISD 05 50 40 30 20 10 0 reading math writing science TAKS Commended Performance (Sum of All Grades Tested) 70 60 61 55 54 53 50 42 40 43 39 38 LISD 04 LISD 05 30 20 10 0 reading math writing science Lovejoy Elementary Reading TAKS Percent Commended (All Tested Grades Combined) 70 60 60 54 51 49 50 41 40 30 20 64 25 16 20 10 0 2003 2004 2005 TX Comp. Gr. Campus Hart Elementary Reading TAKS Percent Commended (All Tested Grades Combined) 60 57 51 49 50 44 39 38 40 30 20 25 20 16 10 0 2003 2004 2005 TX Comp. Gr. Campus Lovejoy Elementary Math TAKS Percent Commended (All Tested Grades Combined) 60 57 53 50 44 45 40 37 35 30 20 17 20 12 10 0 2003 2004 2005 TX Comp. Gr. Campus Hart Elementary Math TAKS Percent Commended (All Tested Grades Combined) 50 47 49 45 40 40 38 34 35 30 27 25 20 15 17 20 12 10 5 0 2003 2004 2005 TX Comp. Gr. Campus Lovejoy Elementary Writing TAKS Percent Commended 50 48 44 45 40 39 40 35 30 30 25 25 26 22 20 15 13 10 5 0 2003 2004 2005 TX Comp. Gr. Campus Hart Elementary Writing TAKS Percent Commended 45 41 39 40 36 35 35 33 30 26 25 26 22 20 15 13 10 5 0 2003 2004 2005 TX Comp. Gr. Campus Lovejoy Elementary Science TAKS Percent Commended 60 53 49 50 40 34 35 TX Comp. Gr. Campus 30 20 14 10 8 7 9 3 0 2003 2004 2005 Hart Elementary Science TAKS Percent Commended 60 60 51 50 42 40 TX Comp. Gr. Campus 31 30 20 14 8 10 10 9 3 0 2003 2004 2005 Student Success Initiative (SSI) • Grade 3 Reading – In 2005, 3% of LISD students required accelerated instruction – In 2005, 13% of Region 10 students required accelerated instruction – In 2005, 13% of Texas students required accelerated instruction Student Success Initiative (SSI) • Grade 5 Reading – In 2005, 3% of LISD students required accelerated instruction – In 2005, 26% of Region 10 students required accelerated instruction – In 2005, 25% of Texas students required accelerated instruction • Grade 5 Math – In 2005, 7% of LISD students required accelerated instruction – In 2005, 20% of Region 10 students required accelerated instruction – In 2005, 21% of Texas students required accelerated instruction TAKS Metroplex Data • TAKS is analyzed by the percent of students who “met standard” (pass) the tests. • TAKS is also analyzed by the percent of students who earn “commended performance” (approximately 90% correct) on the tests. • Each summer the Dallas Morning News asks districts to report their TAKS scores for “Met Standard” and “Commended Performance” • Where Would LISD Have Ranked? Lovejoy Academic Performance Grade 3 3 4 4 4 5 5 5 6 6 Subject Math Reading Math Reading Writing Math Reading Science Math Reading Lovejoy Rank 3 of 55 2 of 55 9 of 55 5 of 55 5 of 55 12 of 55 4 of 55 3 of 55 4 of 55 4 of 55 TEA Data Elements • TEA – District ratings (focus on met standard of TAKS, % of students who meet ARD expectations, drop-out rate) – Gold Performance Acknowledgements (focus on “advanced academics” with TAKS commended performance, advanced courses, SAT/ACT averages) – Academic Excellence Indicator System (AEIS) annual report on data elements TEA Data Summary • Exemplary district rating • Both campuses rated Exemplary – At least 90% of our students met standard on all TAKS subject tests in grades 3-6 • Gold Performance Acknowledgements • At least 20% of our students earned commended performance on TAKS (reading, writing, math, and science) • Attendance rate 97% or higher at both campuses • Comparable Improvement at Lovejoy Elem. in reading Continued Challenges for Student Achievement • Support teachers to deliver the curriculum at the depth and complexity required • Addition of secondary program will add performance indicators • Performance in math, writing, and science (mastery) • Science in Grade 8 is a new test Lovejoy ISD – State of the District Shay Adams Financial Update Summary Overview 2006-2007 Operating Budget Projected Revenue for 2006-2007 Projected Use of Transition Fund Balance Projected Available Funds for Operation $17,229,955 $ 1,310,000 $18,539,955 Cost of Continued Operation of K-5 Program Cost of New Operations of 6-9 Program Tuition Payments to Allen for 10-12 Recapture Payments to TEA Projected Costs for Operations $8,433,199 $4,870,405 $1,084,824 $3,958,299 $18,346,727 Balance of Projected Funds $193,228 Detail by Function 11 – Instruction 12 – Instructional Resources 13 – Instructional Staff Development 23 – School Administration 31 – Guidance & Counseling 33 – Health Services 34 – Student Transportation 36 – Extra Curricular Activities 41 – General Administration 51 – Plant Maintenance & Operations 52 – Security 53 – Data Processing Services 91 – Tuition & Recapture Payments 93 – Shared Service Arrangements $7,316,982 $ 399,108 $ 532,144 $1,064,288 $ 399,108 $ 133,036 $ 266,072 $ 435,359 $ 864,734 $1,330,360 $ 13,304 $ 399,109 $5,043,123 $ 150,000 $18,346,727 Summary by Object Classification 6100 – Personnel 6200 – Contracted Services 6300 – Supplies & Materials 6400 – Travel & Other $10,908,956 $ 6,107,411 $ 931,252 $ 399,108 $18,346,727 Attention! • This budget includes a 3% inflation rate for all current expenditures (including salary) • This budget allows complete flexibility in hiring new personnel as best qualified with no budgetary restrictions related to experience Fund Balance Status Undesignated Fund Balance 2004-2005 Audit $6,609,881 Designated Fund Balance 2004-2005 Audit $3,387,021 2005-2006 Transition to Secondary 2006-2007 Transition to Secondary 2007-2008 Transition to Secondary 2008-2009 Transition to Middle School & Elementary #3 $ 455,000 $1,310,000 $ 800,000 $ 750,000 Balance of Transition Fund Balance $ 72,021 Lovejoy ISD – State of the District Tonya Vining Personnel Update 2006-2007 Pay Scales • How do we compare to the market for salary scales? – We will review our status with a sample of two employee categories • What is our market? – We first compare to all of Region X – We then cross compare to our bordering neighbors & demographic counterparts 2006-2007 Pay Scales • In direct market comparison to Allen, McKinney, Plano, Wylie, Highland Park, and Frisco – the Lovejoy ISD teacher pay scale has a few ”soft spots” on each step that range from $80 to $971 • The administration recommends that the following Teacher Pay Scale be adopted to reconcile this issue primarily for our existing employees • This is also important when recruiting new employees 2006-2007 Pay Scales Teacher Pay Schedule 2006-2007 Pay Scales • In order to stay as competitive as possible, it is also our recommendation to add critical needs stipends for the following areas in which we would require the endorsement in the assignment: • • • • • • Bilingual Foreign Language ESL Special Education Secondary Math Secondary Science $3,000 $2,000 $2,000 $2,000 $2,000 $2,000 2006-2007 Pay Scales • Our Instructional Aide pay scale demonstrates that we are in a strong position for recruiting & retaining our current employees • However, we do see a need to offer the following stipend • Sp. Education Self-Contained Aide $1,000 2006-2007 Pay Scales Recruiting Strategy • Contacted high school faculty members in Texas and around country • Hosted Recruiting Receptions at – Cooper Aerobics Center – UTD – Heard Museum • Approximately 350 participants attended the four receptions Applicant Update - 1156 • • • • • • • • Administrative positions: 153 All level office positions: 101 Curriculum specialist/teacher: 43 Secondary Teachers: 706 Secondary Aides: 29 Elementary Teachers: 281 Elementary Aides: 28 Maintenance, Custodial, Cafeteria: 8 Lovejoy ISD – State of the District Tonya Vining Calendar Recommendation Calendar Waiver approved by TEA • Professional Development Begins – 7/31/06 • First Day of Instruction – 8/7/06 • First Semester Ends – 12/20/06 • Second Semester Begins – 1/4/07 • Last Day of Instruction – 5/24/07 Lovejoy ISD – State of the District Tonya Vining Advisory Meeting Update Advisory Groups • All advisory groups have met at least once this year • Analysis and/or discussion of policies and practices in other districts has occurred • “What do we want for our Lovejoy students?” aligned with the Graduate Profile, best educational practices, and community expectations have been the primary direction of each meeting. Advisory Groups • • • • Gifted and Talented Learning Different Students (504) Special Education Scheduling G/T Programming Advisory • Advisory group has compared current plan to Texas State Plan • Review has identified areas where we do not meet the exemplary standard for G/T programs • Growth areas for LISD are: career and leadership opportunities, data bank of community resources (including mentors), and a parent association • Plan is to incorporate enhancements to the program as we roll out the secondary offerings • Next meeting is planned for late January 504 Advisory • District is committed to building a program that is focused on what students can do well as opposed to their areas of need • Parents surfaced areas for improvement with the current program • District is committed to partnering with parents and share in the advocacy for all learners • Discussed innovative technology applications to help children with learning differences to be successful • In order to surface all needs, LISD will mail out survey to each 504 family in grades K-8 Special Education Advisory • Build a program for students that is focused on their academic potential • Provide the level of support required to allow our students to access the general education program with success • Parents shared concerns based on prior experience with special education in the LISD elementary schools • Timely and accurate communication is vital for parents to support the education of their children • In order to surface all needs, LISD will mail out survey to each special education family in grades K-8 Scheduling Advisory • Students need the schedule to allow them to make 8 choices • For first two years, the middle school and high school bell schedule will need to be very similar in order to share building and staff efficiently • Final recommendation to the Board in the spring Lovejoy ISD – State of the District Dennis Womack Technology Update Technology Updates • Servers & Capacity – – – – – – – Administration GroupWise ZenWorks Patch Management Middle School High School Library Package • Layer 3 WAN Switch • Expand Wireless LAN • VPN • • • • • • • • Lab Replacement Library Upgrade Windows XP Standard RF Cabling Update Online Work Orders New Website Online Applications Online Student Registration • Gradebooks go Home LHS – Base Technology Ceiling Mounted Audio Speakers Data & Voice Cabling Viewing Screen RF Cabling LHS – Technology Infrastructure Data & Voice Cabling Ceiling Mounted Audio Speakers RF Cabling Viewing Screen LHS – Technology Update Wall Mount Phone PHONE W/ VOICE MAIL DATA RESOURCES Network Laser Printer Wireless Connectivity REMOTE VIDEO RESOURCES PWS (Presentation Workstation) Ceiling Mounted Audio Speakers CWS (Classroom Workstation) Ceiling Mounted Video Projector Viewing Screen LHS – Technology Update Technology Features Desktop or wall Mount Phone PHONE W/ Ceiling VOICE MAIL Mounted Video/Data Projector Presentation PC DATA Shared Resources (VCR, DVD, CD, cassette) RESOURCES Handheld Remote Control Network Laser Printer Direct connect (Laptop &PWSaudio devices) (Presentation Workstation) Video Broadcast to all classrooms Wireless Connectivity Direct Dial Phone per classroom REMOTE CWS (Classroom Workstation) Ceiling Mounted VIDEO Voice Mail for Staff Audio Speakers Wireless Connectivity RESOURCES Ceiling Mounted Video Projector Cafeteria Sound System & Presentation System Auditorium Sound System & Presentation System Gym & Stadium Sound Viewing ScreenSystem Lecture Hall Sound System & Presentation System Technology Master Plan • Educate: November – December – Personal research and discussion. • How do we use technology to improve curriculum? – Workforce Development – Productivity Skills • How do we use technology to improve instruction? – Onsite – Cyberspace Technology Master Plan • Create: January – Small Groups: Create and describe the future. (Elementary, Middle School, High School, Graduate) Looking Back from 2010 1. What does our society look like in the year 2010? 2. How is school different for our students now than it was in 2005? 3. Specifically, how have curriculum and instructional methods changed? 4. What are the skills, attributes, characteristics, and behaviors that all of our students are graduating with? When you see a class, how do students exhibit them? 5. How has the role of the teacher changed? What types of things are they doing now that they didn’t in the year 2005? 6. How did we ensure that teachers received and continue to receive the proper training necessary to effectively make these changes? 7. How have we been able to afford to make all of these changes in times of politics, taxpayer fatigue, limited funding and population growth? Technology Master Plan • Evaluate: February – Large Group: Review and build consensus on the developed future models for Elementary, Middle School, High School, and Graduate. How will life be different in 2010 than it is now? What are your best hopes for today’s children in 2010? What skills, knowledge, attitudes, behaviors will be as important in 2010 as they are now? What challenges, obstacles, and opportunities do we face in getting from where we are to where we need to be? What do we need to do differently now in order to prepare our youth for your community/your state 2010? Who are the stakeholders in this change process? How can we ensure that our entire community (parents, students, faculty, administration, politicians, taxpayers, workplace, community leaders) becomes involved in this process? What indicators will tell us that we are successful in preparing our youth for tomorrow’s world? If we are to be successful in changing, how can we help make our educational institutions more relevant to tomorrow? Lovejoy ISD – State of the District Dennis Muizers Advisory Group Update Advisory Groups • • • • • • • Dress Code GPA/Rank Gifted and Talented Special Education Learning Different Students (504) Scheduling Fine Arts Advisory Groups • All advisory groups have met at least once this year • Analysis and/or discussion of policies and practices in other districts has occurred • “What do we want for our Lovejoy students?” aligned with the Graduate Profile, best educational practices, and community expectations have been the primary direction of each meeting. Fine Arts • Informed of fine arts course offerings (drama, art, choir, band, and orchestra) • Made aware of band enrollment and enrollment projections • Made aware that band projections for 2006-07 will create a grade 8/9 performing band as opposed to a marching band • Supportive of fine arts options and importance of fine arts to the community Dress Code & GPA/Rank • Larger advisory groups • Broad spectrum of opinions • Opportunity for more input (online surveys will be conducted) • Further meetings this semester • Recommendations to the Board on these topics later this spring – GPA/rank recommendation before dress code Lovejoy ISD – State of the District Rod White Facilities Update Lovejoy High School • Construction Progress to Date: 87% • Projected Completion Date: May 2006 • Sanitary Sewer Update Site Options for Future Facilities • West Lucas Road Site: - Acres: 30 - Water: Available - Sewer: TBD • FM 1378 Site: - Acres: 25 - Water: Available - Sewer: Available • Hart and Stoddard Road Site: - Acres: 20 - Water: Available - Sewer: Available • Blondy Jhune Road Site: - Acres: 18.49 - Water: Available - Sewer: Not Available Process for Site Recommendation • Work with our architect to review each location and to estimate site work required • Work with city staff in Lucas and Fairview to determine the implications of building on each site • Also contacted a couple of realtors to see if there are additional sites that could be available for trade or purchase • Estimate a recommendation in February or March 2006 Support Services Update • Transportation – Staggered Start Times • Maintenance • Custodial Lovejoy ISD – State of the District Shay Adams Demographic Update Demographic Update Demographic Update Demographic Update Lovejoy ISD – State of the District