Transcript Document
PILOT Demo c. September 1990 Arthur M. Schneiderman Next ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 1 title Navigation Rules Click on: Table entry number: Entity name in column: Entity name in row: Result: Time history of that entry Re-graph for that entity only Entity scorecard for metric category Next ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 2 Pilot-1 Navigation rules Predefined Graphics average for month (12 month window) Category Metric •Lateness (by mfg. division) % late how late? % early how early? % early or late age of late backlog size of late backlog (turns) •Responsibility (by entity) % late •Lead time % CRDs not matched Excess lead time Requested lead time Quoted lead time Time to quote lead time •Responsiveness ©1987-2000 Arthur M. Schneiderman All Rights Reserved. histogram (selected month) Next Slide 3 Pilot-2 pre-defined graphics Ad Hoc Queries (slice-n-dice) Select one or more from each criteria: •Measure (~100) –e.g.: Number Of Lines Late Due To Credit Referrals •Time period (end date) –end date or year •Entity –individual division, warehouse, credit, or corporate total •Product –individual: e.g. AD575 –type: standard or custom •Customer –all foreign affiliates: Japan, Italy, etc. –account categories: domestic key, corporate key, etc. –~400 individual key accounts: HP, IBM, etc. ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Next Slide 4 Pilot-3 ad hoc queries ANALOG DEVICES, INC. Corporate Scorecard Customer Service Metrics Product Tracking System Set Printer ©1987-2000 Arthur M. Schneiderman All Rights Reserved. EXIT Slide 5 Pilot-4 opening screen 1 2 1990 Scorecard ADI Qtr 3 1990 ? Line Item QIP: On Time Delivery (To FCD) CRDs Not Matched Excess Leadtime Employee Turnover IC Outgoing PPM IC Process PPM IC Cycle Time IC Yield AP Outgoing PPM Plug In Yield AP Cycle Time Scrap/Rework Retrace Utilities Actual Budget Variance % Var. % % WKS % 95.30 51.70 2.70 19.70 97.70 29.20 2.40 16.80 -2.40 22.50 .30 2.90 -2.46 77.05 12.50 17.26 DYS % 706.00 1116.00 62.60 38.00 984.00 1350.00 45.80 43.30 -278.00 -234.00 16.90 -5.30 % DYS % 1744.00 90.80 23.90 8.40 1276.00 92.20 19.90 7.40 468.00 -1.40 4.00 1.00 1989 Scorecard Commentary ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 6 # # # # -28.25 -17.33 36.68 # -12.24 # 36.68 -1.52 30.10 13.51 # # # # Return Pilot-5 scorecard-1 1 2 1990 Scorecard ADI Qtr 3 1990 ? Line Item Actual Budget Variance % Var. NEW PRODUCTS: Post 1985 Products Forecasted 3rd Year $M $M 45.90 .00 46.70 -.80 -1.71 # FINANCIALS: Sales Sales Growth (YTY) Contribution Margin ROA (Contribution Margin) $M % % % 120.70 6.50 6.30 7.80 120.20 6.00 8.80 10.40 .50 .50 -2.50 -2.60 .42 8.33 -28.41 # -25.00 # Retrace Utilities 1989 Scorecard Commentary ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 7 Return Pilot-6 scorecard-2 1990 Scorecard ADI QtrADBV 3 1990 ? Line Item Actual QIP: On Time Delivery (To FCD) CRDs Not Matched Excess Leadtime Employee Turnover IC Outgoing PPM IC Process PPM IC Cycle Time IC Yield AP Outgoing PPM Plug In Yield AP Cycle Time Scrap/Rework Retrace Utilities 1 2 Budget Variance % Var. 97.70 29.20 2.40 16.80 -2.40 22.50 .30 2.90 -2.46 77.05 12.50 17.26 DYS % 706.00 1116.00 IPD 62.60 38.00 984.00 1350.00 45.80 43.30 -278.00 -234.00 16.90 -5.30 % DYS % 1744.00 MED 90.80 23.90 Return 8.40 1276.00 92.20 19.90 7.40 468.00 -1.40 4.00 1.00 ADS % % WKS % 95.30 51.70 2.70 CTS 19.70 CLD DSP 1989 Scorecard MDL Commentary ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 8 # # # # -28.25 -17.33 36.68 # -12.24 # 36.68 -1.52 30.10 13.51 # # # # Return Pilot-7 select division scorecard 1 2 1990 Scorecard ADS Qtr 3 1990 ? Line Item QIP: On Time Delivery (To FCD) CRDs Not Matched Excess Leadtime Employee Turnover IC Outgoing PPM IC Process PPM IC Cycle Time IC Yield NEW PRODUCTS: Post 1985 Products Forecasted 3rd Year Retrace Utilities Actual Budget Variance % % WKS % 96.50 44.70 2.10 21.30 97.60 22.00 2.20 17.00 -1.10 22.70 -.10 4.30 -1.13 # 103.10 # -4.55 25.29 # DYS % 1052.00 1694.00 91.60 39.00 1580.00 1675.00 49.70 46.70 -448.00 19.00 11.90 -7.70 -29.87 1.13 # 23.94 # -16.49 # 12.00 12.90 -.90 -6.98 # $M $M 1989 Scorecard Commentary ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 9 % Var. Return Pilot-8 ADS scorecard-1 1 2 1990 Scorecard ADI Qtr 1 1990 ? Line Item FINANCIALS: Sales Sales Growth (YTY) Contribution Margin ROA (Contribution Margin) Retrace Utilities $M % % % 1989 Scorecard Actual Budget 39.40 -5.40 10.40 9.70 41.00 -1.60 11.60 11.20 Commentary ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 10 Variance % Var. -1.60 -3.90 # -3.80 -237.50 # -1.20 -10.34 # -1.50 -13.39 # Return Pilot-9 ADS scorecard-2 1 2 1990 Scorecard ADI Qtr 3 1990 ? Line Item Actual Budget Variance % Var. % % WKS % 95.30 51.70 2.70 19.70 97.70 29.20 2.40 16.80 -2.40 22.50 .30 2.90 -2.46 77.05 12.50 17.26 DYS % 706.00 1116.00 62.60 38.00 984.00 1350.00 45.80 43.30 -278.00 -234.00 16.90 -5.30 % DYS % 1744.00 90.80 23.90 8.40 1276.00 92.20 19.90 7.40 468.00 -1.40 4.00 1.00 Layout Report QIP: On Time Delivery (To FCD) Edit Notes CRDs Not Matched Excess Leadtime Print at System Employee Turnover Print to File IC Outgoing PPM IC Process PPMLocally Print IC Cycle Time IC Yield Download to LOTUS AP Outgoing PPM Calendar Plug In Yield AP Cycle Time Scrap/Rework Return Retrace Utilities # # # # -28.25 -17.33 36.68 # -12.24 # 36.68 -1.52 30.10 13.51 # # # # 1989 Scorecard Commentary ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 11 Return Pilot-10 PILOT utilities CUSTOMER SERVICE METRICS – ON TIME/RESPONSIBILITY September 1990 Early % On Time % Not Late % Division % Warehse. % Credit % ADBV ADS CLD CTS DSP IPD MDL MED ADI 16.22 8.47 30.60 16.76 7.58 5.14 47.29 13.79 11.15 75.72 86.99 67.45 75.68 87.79 88.79 35.66 51.81 83.23 91.95 95.46 98.05 92.43 95.37 93.93 82.95 95.60 94.38 8.13 5.73 4.19 8.65 5.05 7.93 15.50 5.59 6.70 .37 .34 .29 .00 .63 .98 .00 .24 .46 .31 .32 .19 .00 .63 .43 .00 .36 .34 ALL 11.15 83.23 94.38 6.70 .46 .34 Utilities Change Metrics ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Return Slide 12 Pilot-11 customer service Percent Of Lines Shipped Late (Oct 89 through Sep 90) 100 ADBV ADS CLD DSP IPD MDL MED ADI ++ + 10 + + ++ + + ++ + + ++ +++ + ++ +++ 1 0.1 Half N/A Life (In months) NS 4 N/A N/A NS NS N/A Return ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 13 Pilot-12 late ADS Half lives by month 10/89 to 9/90 Hlf Life 10/89 19 11/89 22 12/89 30 1/90 50 2/90 45 30 3/90 26 20 4/90 19 5/90 15 6/90 14 7/90 18 8/90 22 9/90 NS 60 50 40 10 0 Oct Nov Dec Jan Feb Mar Apr May Jun 89 Jul Aug Sep 90 Return ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 14 Pilot-13 ADS half-life Time Phased Late Shipments In Weeks Lines 600- 500- 400- 300- 200- 100- 01 2 3 4 Weeks Value September 1990 - ADI 1 474 % -100 2 204 3 98 -90 4 67 -80 5 36 6 24 -70 7 20 -60 8 13 9 13 -50 10 12 -40 11 9 12 6 -30 13 4 -20 14 16 21 4 -10 27 2 -0 34 0 40 2 5 6 7 8 9 10 11 12 13 14- 21- 27- 34- 40+ WEEKS 20 26 33 39 Return ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 15 Pilot-14 lateness histogram ? ADI CUSTOMER SERVICE MEASURES ASAP ASAP_PCT AVG_SHIP BACKLOG CRD_HOLD_PCT CRED_REF_PCT CREDIT CREDIT_HOLD CREDIT_PCT CREDIT_REF CUST_STOP CUST_STP_PCT CUSTOMER CUSTOMER_LT CUSTOMER_PCT DISTRIBUTION DISTRN_PCT DIV_WAREHSE DIV_WE_PCT DIVISION \/ Number Of ASAP Orders Placed During The Period Percent Of Orders Received That Were ASAP Weighted Average Number of Shipments Per Period Total Number Of Unshipped Orders Percent Of Lines Late Due To Credit Hold Percent Of Lines Late Due To Credit Referrals Number Of Lines Late Due To All Credit Causes Number Of Lines Late Due To Credit Hold Causes Percent Of Lines Late Due To All Credit Causes Number Of Lines Late Due To Credit Referrals Number Of Lines Late Due To Customer Stops Percent Of Lines Late Due To Customer Stops Number Of Lines Late Due To All Customer Causes Average Customer Requested Lead Time Percent Of Lines Late Due To All Customer Causes Number Of Lines Late Due To All Distribution Causes Percent Of Lines Late Due To All Distribution Causes Lines Late Due To Divisional Warehouse Error Percent Of Lines Late Due To Divisional Warehouse Error Number Of Lines Late Due To All Divisional Causes END CANCEL CLEAR DONE Select label, composite, or new key field ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 16 Pilot-15 slice-n-dice: choose measure Print /ADI CUSTOMER SERVICE TABLE ENTITY LATEST PERIOD ADI Reset PILOT DIMENSION CUSTOMER TYPE ? ERY_SHIP_PCT ON_TIME_PCT NOT_LATE_PCT DIVISION_PCT (9/90) (9/90) (9/90) (9/90) TOTAL TOTAL TOTAL TOTAL 11.15 83.23 94.38 6.70 Metrics Views Calendar Return Select label, composite, or new key field. ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 17 Pilot-16 slice-n-dice PILOT DIMENSION CUSTOMER TYPE Print /ADI ADI QtrADBV 3 1990 ADS CUSTOMER SERVICE TABLE ENTITY CLD LATEST PERIOD ADI CTS ? ERY_SHIP_PCT ON_TIME_PCT NOT_LATE_PCT DIVISION_PCT (9/90) (9/90) (9/90) (9/90) TOTAL TOTAL TOTAL TOTAL 11.15 83.23 94.38 6.70 DSP IPD MDL MED Return Reset Metrics Views Calendar Return Select label, composite, or new key field. ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 18 Pilot-17 slice-n-dice: choose entity PILOT DIMENSION TYPE CUSTOMER Print ENTITY ? CUSTOMER SERVICE TABLE CUSTOMER LATEST PERIOD Finished CORPORATE KEY ACCOUNT DOMESTIC KEY ACCOUNT FOREIGN KEY ACCOUNT KEY ACCOUNT NON KEY ACCOUNT ADKK ALLEN BRADLEY AMOCO ARMCO ATT BECKMAN BENDIX BETHLEHEM STEEL Reset \/ END Metrics Views Calendar Return Select up to nine labels for composite group. ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 19 Pilot-18 slice-n-dice: choose customer Print /ADI PILOT DIMENSION /OEM/DIST /HEWLETT PACKARD CUSTOMER SERVICE TABLE TYPE LATEST PERIOD DIST – ADI – HEWLETT OEM – ADI - HEWLETT Reset ? CUSTOMER_LT (9/90) TOTAL 7.56 8.00 Metrics Views Calendar Return Select label, composite, or new key field. ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 20 Pilot-19 example DIST – ADI – HEWLETT PACKARD METRIC: CUSTOMER_LT (9/90) 10/89 10.47 24 11/89 10.99 20 12/89 10.77 16 1/90 11.75 12 2/90 9.36 8 3/90 11.11 4 4/90 7.52 5/90 7.88 0 Oct 89 Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 90 Aggregate time-series - N 6/90 19.82 7/90 5.74 8/90 5.05 9/90 7.56 Return ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 21 Pilot-20 example – vs time ADI PRODUCT TRACKING SYSTEM FY89 PLAN ACTUAL VARIANCE % VAR RPCC Pre 86 Products RPCC 1986-1992 Products 77,707.1 46,114.0 73,073.9 33,130.4 -4,633.2 -12,983.6 -6.0% -28.2% PSTF Pre 86 Products PSTF 1986-1992 Products 77,707.1 46,114.0 73,073.9 33,130.4 -4,633.2 -12,983.6 -6.0% -28.2% Division Pre 86 Products Division 1986-1992 Products 77,707.1 46,114.0 73,073.9 33,130.4 -4,633.2 -12,983.6 -6.0% -28.2% 1st Quarter 1990 Retrace ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Return Slide 22 Pilot-21 pts top level QUARTERLY BOOKINGS ($K) : 1986-1992 VINTAGE PRODUCTS 1st Quarter 1990 DAC DSP SYS SENSE ADC ASP AMP MIL ASIC COMM MISC ADI Retrace FY89 PLAN ACTUAL VARIANCE % VAR 9,821.1 4,621.4 6,410.4 2,616.9 10,599.9 2,781.4 6,745.0 1,474.8 1,043.2 0.0 0.0 46,114.0 6,192.4 2,564.0 4,761.5 1,416.2 9,400.0 1,717.6 5,785.7 556.5 733.4 0.0 3.0 33,130.4 -3,629.0 -2,057.0 -1,648.9 -1,200.7 -1,199.9 -1,063.8 -959.3 -918.3 -309.8 0.0 3.0 -12,983.6 -37.0% -44.5% -25.7% -45.9% -11.3% -38.2% -14.2% -62.3% -29.7% Pareto Vintage Chart ©1987-2000 Arthur M. Schneiderman All Rights Reserved. -28.2% Return Slide 23 Pilot-22 by strategy 900000 BOOKINGS CHART BY VINTAGE (Actuals through 1/90) ADI Vintage FY89 Actual Forecast 1992 1991 750000 1990 600000 1989 1988 450000 1987 300000 1986 150000 0 Data Sheet 89 90 91 ©1987-2000 Arthur M. Schneiderman All Rights Reserved. 92 Slide 24 Print Return Pilot-23 vintage chart-actual FY89 Plan Bookings By Vintage ADI Vintage 1990 Actual* 1989 Forecast 1990 Forecast 1991 Forecast 1992 Forecast 1986 30,207.0 45,049.5 51,320.0 56,665.8 57,457.2 1987 33,130.4 49,107.3 40,113.1 47,264.7 50,164.8 1988 35,000.0 25,521.3 50,003.5 68,844.9 87,395.8 1989 35,000.0 19,881.5 55,106.2 91,382.2 124,901.1 1990 35,000.0 46,771.2 149,741.5 242,945.1 23,101.2 73,783.6 1991 1992 14,909.0 * Actual data annualized Print ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 25 Return Pilot-24 vintage chart data sheet QUARTERLY BOOKINGS ($K) : 1986-1992 VINTAGE PRODUCTS ASP 1st Quarter 1990 1986 Vintage 1987 Vintage 1988 Vintage 1989 Vintage 1990 Vintage 1991 Vintage 1992 Vintage ASP Retrace FY89 PLAN ACTUAL VARIANCE % VAR 95.5 691.2 563.3 1260.9 170.5 113.9 843.2 461.4 299.1 18.4 152.0 -101.9 -961.8 19.2% 22.0% -18.1% -76.3% 2781.4 1717.6 1063.8 -38.2% Pareto Vintage Chart ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Return Slide 26 Pilot-25 vintage chart 1986-1992 VINTAGE PRODUCTS – BOOKINGS ASP QUARTERLY VARIANCE FOR 901 (Actual-Plan) 1989 Vintage 1990 Vintage 1988 Vintage 1991 Vintage 1992 Vintage 1986 Vintage 1987 Vintage -1000 -800 -600 ©1987-2000 Arthur M. Schneiderman All Rights Reserved. -400 -200 Slide 27 0 200 Return Pilot-26 vintage variance 1 2 QUARTERLY BOOKINGS ($K) : 1986-1992 VINTAGE PRODUCTS Vintage: 1989 ASP 1st Quarter 1990 FY89 PLAN ACTUAL VARIANCE % VAR 412.8 276.1 89.1 89.1 79.2 100.5 35.5 78.3 31.9 19.3 14.8 14.0 12.3 0.0 63.7 3.2 5.2 0.0 70.1 0.0 47.8 5.8 0.0 0.0 19.0 21.1 -412.8 -212.8 -85.9 -83.9 -79.2 -38.4 -35.5 -30.5 -26.1 -19.3 -14.8 5.0 8.8 -100.0% -76.9% -96.4% -94.2% -100.0% -35.4% -100.0% -38.9% -81.7% -100.0% -100.0% 35.9% 71.8% AD1322 AD892 AD7371 AD7341 AD1315 AD834 AD1320 AD640 AD689 AD9590 AD688 AD9501 AD9901 Retrace Pareto ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Return Slide 28 Pilot-27 by product AD585 : SHA ADS Sourcing: Margin: Revenue Risk: Start Date: Planned Release: 843 Planned Time to Market: Actual Release: Actual Time to Market: Release Window: Earliest Date: Latest Date: Development Risk: Development Cost: Die Size: Product Type: Technology: BIPOLAR PSTF: ADC Forecast Data Print ZOOM Return Plan vs. Actual 900 750 600 450 300 150 0 1 2 88 3 4 1 89 2 3 4 1 2 90 ACTUAL ©1987-2000 Arthur M. Schneiderman All Rights Reserved. 3 4 1 2 91 3 4 1 2 3 4 92 FY89 PLAN Slide 29 Pilot-28 product forecast ADS QUARTERLY BOOKINGS 1984 Vintage: AD585 900 750 600 450 300 150 0 1 2 88 ACTUAL 3 4 1 89 2 3 4 1 2 3 4 90 1 2 3 4 1 91 FY89 PLAN ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Slide 30 1/88 2/88 3/88 4/88 1/89 2/89 3/89 4/89 1/90 2/90 3/90 4/90 1/91 2/91 3/91 4/61 1/92 ACTUAL 396 355 440 465 466 456 649 576 452 FY89 468 479 488 495 471 477 483 490 523 533 545 558 559 Return Pilot-29 product actuals PRODUCT DATA SHEET 1Q90 Bookings: 471.2 Division: ADS AD585 SHA ACTUAL Bookings Bookings 1Q88 2Q88 3Q88 4Q88 396.1 354.8 440.0 464.8 FY88 1,655.7 1Q89 2Q89 3Q89 4Q89 466.2 456.0 649.1 576.4 468.2 478.9 487.8 495.0 FY89 2,147.7 1,929.9 FY89 PLAN ASP Units Return \/ ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Vintage: 843 Slide 31 Pilot-30 product data sheet PRODUCT DATA SHEET 1Q90 Bookings: 471.2 Division: ADS AD585 SHA ACTUAL Bookings 1Q90 2Q90 3Q90 4Q90 451.9 Bookings FY89 PLAN ASP Units 471.2 476.8 482.6 489.5 FY90 1,920.1 1Q91 2Q91 3Q91 4Q91 523.2 533.3 545.2 558.3 FY91 2,160.0 /\ Vintage: 843 \/ ©1987-2000 Arthur M. Schneiderman All Rights Reserved. Return Slide 32 Pilot-31 product data sheet –cont.