CIGRÉ – 2009 Activity Report for SC C1
System Development and Economics
David Curtis (C1)
Hydro One
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
Outline
 Mission and Scope
 Working Group Activities
− Recent activities
− New working groups
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
SC C1 – System Development and
Economics - Mission
 MISSION
To facilitate and promote the progress of engineering and
the international exchange of information and knowledge
in the field of system development and economics. To add
value to this information and knowledge by means of
synthesizing state-of-the-art practices and developing
recommendations.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
SC C1 – System Development and
Economics - Scope
The scope of SC C1 is to study economic and system analysis methods important for the
development of power systems and to assist utilities to find the best solutions in various
evolving, competitive and unbundled conditions in the context of the overall energy supply
system and with social and environmental considerations. The main areas of attention are:
- Methods and tools for power system static and dynamic analysis
- Planning predicaments and methods in competitive and regulatory structures
- Progress and new approaches in application of power system planning criteria and reliability
(security and adequacy) assessment
- Capacity enhancement by use of risk-based security assessment and advanced information,
communication and power-electronics technology for improving system stability and dynamic
performance
- Future dependence, requirements and economy of ancillary services for frequency and
voltage control and other system needs
- The impact of pricing and tariff methods for transmission services on system development.
- Asset management strategies in the definition of optimal policies
- Planning issues related to long distance transmission and international interconnections.
System planning issues in newly industrialised and developing countries
- Impact on system development of new solutions and technologies in fields such as generation
and demand side management (DSM)
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
SC C1 Active Working Groups
#
Title
Convenor
Create
Disband
C1.
Asset Management
MAG
Eric Rijks
2008
2012
C1.
BAG
Business Management
Konstantin
Staschus
2008
2012
C1.
TAG
Tutorials
Keith Bell
2008
2012
C1.9
Planning Issues for Newly
industrialized and Developing
Countries (Africa)
Riaz Amod Vajeth 2004
2010
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
SC C1 Active Working Groups
#
Title
Convenor
Create
Disband
C1.15
Review the drivers for transmission
investment decisions and the role of
technical planning criteria in
transmission investment
Adele Sleator
2009
2011
C1.16
Transmission Asset Risk Management
Eric Rijks
2007
2009
C1.17
Planning to Manage Power
Interruption Events
Keith Bell
2007
2009
Jonathan
O'Sullivan
2008
2010
C1/C2 Coping with limits for very high
C6.18 penetrations of renewable energy
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
SC C1 Active Working Groups
#
Title
Convenor
Create
Disband
C1.19
Green field network, designing future
networks ignoring existing constraints
Hiroshi Suzuki
2009
2011
C1.20
Accommodating high load growth and Kevin Leask
urban development in future plans
2009
2011
C1.22
New investment decision processes
required to deal with changing
economic drivers.
Olivier Herz
2009
2011
C1.23
Transmission investment decision
points and trees
Ronald Marais
2009
2011
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
SC C1 New Working Groups
#
Title
Convenor
Create
Disband
C1.21
What advanced components and
technologies are needed and which re
available or under development to
assist system development and
planning
Andrea
Mansoldo
2009
TBD
C1.24
What new or recently developed
analytical tools and methods are
needed and which are available to
understand and model the uncertain
nature of future power systems
David Bones
2009
TBD
C1.25
What arethe factors and information
that need to be considered for asset
management decision making in the
context of a low-carbon future
Eric Rijks
2009
TBD
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009
Questions ?