Transcript Document
UMGUNGUNDLOVU IDP
PHASE 2 – STRATEGY REPORT
STRATEGY DEVELOPMENT
COMPREHENSIVE WORKING DOCUMENT FROM
FOCUSSED WORKSHOPS HELD ON 5 AND 6
FEBRUARY 2002
uMGUNGUNDLOVU IDP PHASE 2
1
STRATEGIC POLICY FRAMEWORK
This is the strategic framework
that will guide all future activities
of the District Municipality. It
consists of a number of
components, viz.
•
•
•
•
•
Visions;
Objectives;
Decision Support Framework;
Resource Framework; and
Strategies.
uMGUNGUNDLOVU IDP PHASE 2
2
THE STRATEGIC ISSUES
KEY
PERFORMANCE
AREA
INFRASTRUCTURE AND
SERVICES
SOCIAL DEVELOPMENT
ECONOMIC
DEVELOPMENT
STRATEGIC ISSUE
LAND REFORM AND HOUSING
DEVELOPMENT ON INGONYAMA LAND
ACCESS TO SUSTAINABLE INFRASTRUCTURE
ENVIRONMENTAL SUSTAINABILITY
GENDER EQUITY
EDUCATION
ADDRESSING HEALTH
AIDS
SPORT, RECREATION, ART AND CULTURE
DISASTER MANAGEMENT
CRIME
POVERTY ALLEVIATION
UNEMPLOYMENT
INVESTMENT
uMGUNGUNDLOVU IDP PHASE 2
3
THE VISIONS AND GOALS
A vision is a statement of the
desired long term development
of the municipality based on the
identified strategic issues and
related to the specific conditions
in the municipal area. Visions
should be short enough to
become popular, but specific
enough to refer to the
characteristics, problems and
potentials of the municipality.
They should be phrased in a
way to be understood by
everybody.
uMGUNGUNDLOVU IDP PHASE 2
4
CORPORATE VISION STATEMENT
The formulation of development of strategies must take place within the context of the District Council 22
Corporate Vision. This vision was developed by Councillors and officials representing the District Council
and the various local councils at a workshop held early in 2001. It expresses the view as to what the
leadership of District Council 22 will aim to achieve through its future activities. The corporate vision
states that:
UMGUNGUNDLOVU DISTRICT MUNICIPALITY WILL EVOLVE INTO A DYNAMIC METROPOLITAN AREA
AND THE LEGISLATIVE CAPITAL OF KWAZULU-NATAL WITH A VIBRANT ECONOMY, INTEGRATED
SERVICE DELIVERY AND IMPROVED QUALITY OF LIFE FOR ALL ITS PEOPLE.
The Mission established to guide the activities of Council in achieving the vision states that:
THROUGH SOUND GOVERNANCE AND COMMUNITY PARTICIPATION ENSURE THE PROVISION OF
EQUITABLE AND SUSTAINABLE SERVICES AND ECONOMIC GROWTH
uMGUNGUNDLOVU IDP PHASE 2
5
THE DECISION SUPPORT FRAMEWORK
This is a basic overarching
framework that needs to be in
place to ensure that the District
Municipality can fulfil its allocated
functions and achieve in the key
performance areas. It is referred
to as the decision support
framework as any development
related decision-making will take
place within the context of this
overall framework.
uMGUNGUNDLOVU IDP PHASE 2
6
COMPONENTS
COMPONENT
DESCRIPTION
Spatial Development Framework
The primary aim of the spatial development framework (SDF)
is to create a competent district spatial structure. The SDF
promote improved systems of access, link settlements, guide
investment and create a overall system of opportunity.
Planning / Service
Standards
Planning standards establish basic minimum levels of services
which the District will set out to achieve. It represents an ideal
and may not be achieved in the medium term. Planning
standards are linked to the spatial development framework and
encourages orderly spatial development.
Financial Strategy
Funding is essential for both the ongoing operation of the
council as well as the implementation of development, i.e. the
core function of the District. A broad strategy identifying
approaches to ensuring the availability of funding is required.
Corporate
Development
The necessary institutional systems and structures must be in
place for implementing the IDP. Clarity must therefore
specifically exist on roles and responsibilities and how
performance will be managed.
uMGUNGUNDLOVU IDP PHASE 2
7
SPATIAL DEVELOPMENT FRAMEWORK
A. DEFINITION:
To provide structure for the district in a way which :
Unwinds the legacy of Apartheid
Redresses past imbalances and
promotes equity
Promotes growth and investment
Goals include:
B.KEY ISSUES
Prime location
Limited development of tourism opportunities
Significant agricultural production
Dominance of PMB complex
Historical fragmented authority structure
To promote an improved system of
access - physical,social and economic
Complex land use mosaic
To integrate district space and link
various settlements / opportunities
Existing settlement hierarchy
To provide a framework for managing
development
To maximise on inherent opportunities
and potentials within the district
Population concentration & pressure
Uncontrolled / dispersed human settlement
Treat to natural systems
Artificial settlement creation
Lack of social and physical support structure
To create an overall system of
opportunity
uMGUNGUNDLOVU IDP PHASE 2
8
SPATIAL DEVELOPMENT FRAMEWORK (Cont.)
C. TOWARD STRATEGY
MANAGING GROWTH
To provide a clear framework to guide and cohere growth and to deal with growth proactively.
INTEGRATING SPACE
To ensure that the physical integration by building on movement systems – activity corridors
ACKNOWLEDGING AND BUILDING ON THE SENSE OF PLACE
To ensure the uniqueness of local places
CREATING IMPROVED LIVING CONDITIONS
To promote the creation of livable and sustainable environments - social and infrastructural support.
INCREASING ACCESSIBILITY TO URBAN OPPORTUNITIES
To enhance accessibility to urban opportunities through the development of a hierarchy of service centres
ENSURING ENVIRONMENTAL SUSTAINABILITY
To integrate environmental programmes aimed at managing development, rehabilitation & conservation
uMGUNGUNDLOVU IDP PHASE 2
9
SPATIAL DEVELOPMENT FRAMEWORK (Cont.)
D. CONCEPTS
HIERARCHY OF CENTRES AS
INVESTMENT POINTS
HEIRARCHY OF ACTIVITY
CORRIDORS AS
INVESTMENT LINES
NEW ACCESS CORRIDORS
TO INTEGRATE DISTRICT
CLEAR MANAGEMENT
ZONES
uMGUNGUNDLOVU IDP PHASE 2
10
SPATIAL DEVELOPMENT FRAMEWORK (Cont.)
DISTRICT SPATIAL
FRAMEWORK
LOCAL SPATIAL
FRAMEWORK
uMGUNGUNDLOVU IDP PHASE 2
• DISTRICT CENTRE
• MUNICIPAL SERVICE CENTRE
• SECONDARY SERVICE CENTRE
•
•
•
•
•
TERTIARY SERVICE CENTRE
OTHER DENSE SETTLEMENTS
OTHER DISPERSED SETTLEMENT
SMALL SETTLEMENT
AGRICULTURAL SETTLEMENT
11
PLANNING STANDARDS
THE NEED FOR
STANDARDS:
Planning standards
establish basic
measurable goals to
be achieved through
future development
processes
PLANNING STANDARDS ARE AIMED AT:
• providing everyone with access to a basic
level of service;
• ensuring the equitable distribution;
• establishing a set of development goals;
• ensuring sustainable development; and
• importantly, strengthening the spatial
framework.
+
A tool for determining
backlogs
uMGUNGUNDLOVU IDP PHASE 2
12
PLANNING STANDARDS (Cont.)
DISTRICT SPATIAL
FRAMEWORK
• DISTRICT CENTRE
• MUNICIPAL SERVICE CENTRE
• SECONDARY SERVICE CENTRE
•
•
•
•
•
uMGUNGUNDLOVU IDP PHASE 2
TERTIARY SERVICE CENTRE
OTHER DENSE SETTLEMENTS
OTHER DISPERSED SETTLEMENT
SMALL SETTLEMENT
AGRICULTURAL SETTLEMENT
13
AGRICULTURAL
SETTLEMENTS
OTHER SMALL
SETTLEMENT
DISPERSED
SETTLEMENT
OTHER DENSE
SETTLEMENT
TERTIARY
SERVICE CENTRE
SECONDARY
SERVICE CENTRE
GENERAL / MINIMUM
STANDARD
MUNICIPAL
SERVICE CENTRE
ITEM
DISTRICT
CENTRE
STANDARDS: PHYSICAL SERVICES
HOUSING
Adequate protection from
weather and security of tenure
Formal Housing
Formal or upgraded
informal
WATER
Access to piped water for all
On-site
Standpipe 200m walking
distance
SANITATION
VIP per household
Waterborne
ELECTRICITY
Individual house connection
for each househol
Grid – 2kVA per
household
SOLID WASTE
REMOVAL
Achieve basic health standards
and conserve environment
Removal
ROADS
All weather access to all service
All weather access
centres
uMGUNGUNDLOVU IDP PHASE 2
Waterborne
in dense other
VIP
VIP
Non-grid – 2kVA per
household
Approved dump –
container or other
On-site
disposal
Basic safe access
available
14
TELECOMMUNICATIONS
200m to public telephone
POSTAL SERVICE Access to postal points for all
AGRICULTURAL
SETTLEMENTS
OTHER SMALL
SETTLEMENT
DISPERSED
SETTLEMENT
OTHER DENSE
SETTLEMENT
TERTIARY
SERVICE CENTRE
Individual connections on application and 200m to
public telephone
One postal point
per 10 000 hh.
TAXI RANKS
Dedicated taxi areas in all
centres
CEMETERIES /
CREMATORIA
Access for all to cemeteries on Local
a Municipal Service Centre level cemeteries
uMGUNGUNDLOVU IDP PHASE 2
SECONDARY
SERVICE CENTRE
GENERAL / MINIMUM
STANDARD
MUNICIPAL
SERVICE CENTRE
ITEM
DISTRICT
CENTRE
STANDARDS: OTHER SERVICES
Dedicated taxi areas
Access to postal point in service
centre (municipal, sec / tertiary)
Dedicated taxi areas as
far as possible
Access to cemeteries on a Municipal
Service Centre level
15
AGRICULTURAL
SETTLEMENTS
OTHER SMALL
SETTLEMENT
DISPERSED
SETTLEMENT
OTHER DENSE
SETTLEMENT
TERTIARY
SERVICE CENTRE
SECONDARY
SERVICE CENTRE
GENERAL / MINIMUM
STANDARD
MUNICIPAL
SERVICE CENTRE
ITEM
DISTRICT
CENTRE
STANDARDS: SOCIAL / ECONOMIC
SERVICES
COMMUNITY
HALLS
Community hall (multi-purpose
facility) in all service centres
Community Hall
SPORT
FACILITIES
Access to full range of sport
facilities
Full range of
facilities
PENSION
PAYOUT POINTS
Access for all pensioners to
pension payout points
Payout where possible at
multi-purpose facility
Mobile pension payment
points
PERIODIC
MARKETS
One market per service centre
Periodic market
Access to periodic market
in service centre
FRESH PRODUCE
MARKET
At least one on the District
Level
Access to market on district level
ABATTOIR
At least one on the District
Level
Access to abattoir on district level
uMGUNGUNDLOVU IDP PHASE 2
Access to community hall
in service centres
High priority
Basic facilities
facilities
16
AGRICULTURAL
SETTLEMENTS
OTHER SMALL
SETTLEMENT
DISPERSED
SETTLEMENT
OTHER DENSE
SETTLEMENT
TERTIARY
SERVICE CENTRE
SECONDARY
SERVICE CENTRE
GENERAL / MINIMUM
STANDARD
MUNICIPAL
SERVICE CENTRE
ITEM
DISTRICT
CENTRE
STANDARDS: SOCIAL / ECONOMIC
SERVICES
COMMUNITY
HALLS
Community hall (multi-purpose
facility) in all service centres
Community Hall
SPORT
FACILITIES
Access to full range of sport
facilities
Full range of
facilities
PENSION
PAYOUT POINTS
Access for all pensioners to
pension payout points
Payout where possible at
multi-purpose facility
Mobile pension payment
points
PERIODIC
MARKETS
One market per service centre
Periodic market
Access to periodic market
in service centre
FRESH PRODUCE
MARKET
At least one on the District
Level
Access to market on district level
ABATTOIR
At least one on the District
Level
Access to abattoir on district level
uMGUNGUNDLOVU IDP PHASE 2
Access to community hall
in service centres
High priority
Basic facilities
facilities
17
FINANCIAL STRATEGY
PROPOSED CONTENTS OF FINANCIAL
STRATEGY:
• Appropriate financial management systems
• Increase levy income
• Develop database of funding sources
uMGUNGUNDLOVU IDP PHASE 2
18
FINANCIAL STRATEGY (Cont.)
• Establish systems for allocation + distribution
of funding
• Guidelines on use of Municipal Service
Partnerships
• Ensure funding relating to functions allocated
to District e.g. roads
uMGUNGUNDLOVU IDP PHASE 2
19
CORPORATE DEVELOPMENT
PROPOSED CONTENT OF CORPORATE
DEVELOPMENT PLAN:
• Allocation of Roles and Responsibilities
• Emerging Metro
• Performance Management
• By-law development and administration
• Skills development of staff
• Employment equity and gender
• AIDS policy in the workplace
uMGUNGUNDLOVU IDP PHASE 2
20
INTEGRATING OBJECTIVES +
RESOURCES
What is an Objective: A clear, concise and
quantifiable (or measurable) objective should
be in place for each strategic issue. An
objectives states the desired achievement for
the 5-year planning period. Objectives then
also represents the most basic level of key
performance indicators (KPIs) for the
municipality.
What is the Resource Framework: The
resource framework describes the resources,
both human and financial available for
addressing a particular key issue. The
resource framework together with the working
objectives guides the identification and
development of alternative strategies.
uMGUNGUNDLOVU IDP PHASE 2
21
ISSUE 1: LAND REFORM AND HOUSING
ISSUE STATEMENT:
Housing and land reform activities to date has not been
successful in addressing the needs of the majority of the
population of the district. However, housing and land reform
provides a key opportunity for obtaining development funding
and therefore promoting development.
OVERVIEW:
Causes: Urban focus, developer-consultant driven, quality of
developments, re-active approach, “willing-buyer willing-seller”,
lack of clarity on products
Results: Unsustainable settlements, artificial migration,
uncoordinated development
RESOURCES:
FINANCIAL
• Department of Housing – R70
million per annum
• Department of land affairs – R320
million over 5 years
• Land Bank
• Department of Provincial and Local
Government – LED fund
• Ithala
• CMIP (insert MTF)
• Lending Institutions
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
STRATEGIES:
• Sustainable and integrated
settlements
• LED / affordability
• Move away from urban focus
• Accreditation / greater control
of funding
• Access to an adequate level of
housing and security of tenue.
• Establish 4000 housing
opportunities per annum of which
50% is located within the rural areas
• Approval and implementation of
LRAD subsidies (2002/3-100, 20034-500,2004-2005 – 1000 small
scale farmers p.a.)
1.
2.
3.
uMGUNGUNDLOVU IDP PHASE 2
HUMAN/INSTITUTION
•
•
•
•
•
•
•
Department of Agric
District (Housing Manager)
Land Reform DCC
DLA
District
Other Service Providers
NGOs
Institutional structuring for delivery
District-wide integrated housing delivery
Land reform implementation for sustainability
22
STRATEGY 1.1: INSTITUTIONAL STRUCTURING FOR DELIVERY
DESCRIPTION:
Housing and land reform (incl. agricultural) related activities have
to date not been integrated with local government activities. The
district municipality should take a lead role in establishing
appropriate institutions for the coordinated delivery of housing and
land reform products.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish Land Reform and Housing Steering
Committee
2. Develop a Land Reform and Housing Information
Programme
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
DC (LRHSC)
DLA
DoH
DoA
Local Municipalities
DLA
DoH
DoA
KEY PERFORMANCE INDICATORS:
Housing opportunities delivered
LRAD, ESTA Subsidies approved
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Land Reform and Housing
SECONDARY:
23
STRATEGY 1.2: DISTRICT-WIDE INTEGRATED HOUSING
DELIVERY
DESCRIPTION:
The identification and prioritisation of projects on a district level to
ensure appropriate spatial distribution and access to opportunities
for all. Once prioritised ensuring that housing provision is
integrated in terms of spatial planning frameworks and with other
service delivery mechanisms of the Dept of Education, the Dept. of
Health, Dept of Transport, Dept of Sport and Recreation and others
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Identify and prioritise projects
2. Establish mechanisms for allocation of funding
3. Programme for developing Land Use
Management Systems
RESOURCES
FINANCIAL
DoH
CMIP
HUMAN / INSTITUTIONAL
LRHSC
DC Housing Manager
DoH
LCs
KEY PERFORMANCE INDICATORS:
Number of settlements upgraded in a sustainable manner
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Land Reform and Housing
SECONDARY:
24
STRATEGY 1.3: LAND REFORM IMPLEMENTATION FOR
SUSTAINABILITY
DESCRIPTION:
Supporting the implementation of the government’s land
redistribution, land tenure and land restitution programmes.
Ensuring the implementation of these programmes within the policy
and planning frameworks of the district and local municipalities.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Information programme on LRAD
2. Finalisation of existing projects
3. Develop mechanisms for supporting LTA and
ESTA processes
RESOURCES
FINANCIAL
DLA
Dept of Agriculture
HUMAN / INSTITUTIONAL
LRHSC
DLA
Dept of Agriculture
NGOs/CBOs
KEY PERFORMANCE INDICATORS:
Finalisation of all existing land reform projects by end of 2002
No. of LRAD subsidies approved and implemented
No. of ESTA claims processed and implemented
No. of LTA claims processed and implemented
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Land Reform and Housing
SECONDARY:
25
ISSUE 2: DEVELOPMENT ON INGONYAMA LAND
ISSUE STATEMENT:
70% of the rural population of the district resides on Ingonyama
land, however, extremely limited development has occurred in
these areas in the past. Service delivery in these areas are ad hoc
and uncoordinated. A low level of tenure security, i.e. PTOs,
impacts on levels of development.
OVERVIEW:
RESOURCES:
FINANCIAL
•
•
•
•
•
Causes: Low levels of tenure security, absence of suitable
planning frameworks, capacity of tribal authorities, uncertainty
regarding development processes, lack of information regarding
development opportunities
Results: Limited uncoordinated, ad hoc development
DESIRED OUTCOME:
• Integration/amalgamation of
Ingonyama Trust into
municipalities
• Implementation of Act
• Creating acceptable levels of
employment and social
infrastructure
• Establish planning frameworks
• Land tenure act will be
implemented
5-YEAR OBJECTIVE:
• LandUse Management Systems to be
developed for all Ingonyama Trust
areas
• Establish a consultative forum with
traditional leaders and stakeholders to
discuss development related issues by
2002
uMGUNGUNDLOVU IDP PHASE 2
HUMAN/INSTITUTION
DTLGA (Planning Frameworks)
DoH
DLA
DoA
Other Service Provider
•
•
•
•
•
•
DTLGA (Capacity building)
District – Land Reform DCC
DoH
DLA
DoA
Other Service Provider
STRATEGIES:
1.
Promoting development on Ingonyama Land
26
STRATEGY 2.1: PROMOTING DEVELOPMENT ON
INGONYAMA LAND
DESCRIPTION:
Implement a series of basic initiatives aimed at facilitating and
promoting all forms of development on Ingonyama land. The
activities are aimed at ensuring coordination, clarifying processes
and the identification of opportunties.
RESOURCES
FINANCIAL
DTLGA
Public and private sector
investors
HUMAN / INSTITUTIONAL
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Clarify process for development approval on
Ingonyama land
2. Establish consultative forum
3. Programme for development of Land Use
Management Systems
4. Economic development feasibility studies
Ingonyama Trust Board
Tribal Authorities
DTLGA
DC and LCs
KEY PERFORMANCE INDICATORS:
Extent of various types of development on Ingonyama land
measured in terms of hectares (agricultural development),
subsidies drawn down (housing projects), households serviced
(infrastructural investment), total investment (economic
development) and jobs created (economic and infrastructural
investment)
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Promoting development on Ingonyama land
SECONDARY:
Land reform and Housing
Poverty alleviation
Infrastructure provision
27
ISSUE 3.1: ACCESS TO WATER
ISSUE STATEMENT:
A large proportion of the district population does not have access to appropriate,
affordable levels of water infrastructure. This impacts on general levels of health
and welfare within these areas. In areas where infrastructure does exist high
water losses and water wastage occurs.
Some for all not all for some Consider DWAf policy Projects that are not
functional get running first No water supply as priority areas Project funds
committed
OVERVIEW:
Causes: (As for engineering services in general)
Results: Lack of services, lack of community ownership of projects,
exposure to diseases such as cholera, impacts negatively on
general levels of health
DESIRED OUTCOME:
• Every citizen of the district with
access to clean water
• Payment for services rendered
• Providing affordable levels of
services
• Proper usage of water avoiding
wastage
• Linking water provision with sanitation
• Standardisation of water tariffs (in line
with level of service)
• District as an Implementing Agent for
DWAF and CMIP Programmes
RESOURCES:
FINANCIAL
•
•
•
•
•
•
DWAF condition grant
National Treasury Equitable Share
CMIP
Department of Housing Funding
Mvula Trust
Income from tariffs on both District
and Local level
• District Levy Income
• International funders, e.g. DANCED
• Municipal Service Partnerships with
willing Water Services Authority
5-YEAR OBJECTIVE:
• Each household to have access to
potable water (not necessarily piped)
within 200m by the end of the 20045
financial year
• DM to monitor and encourage
compliance with the free basic water
programme
uMGUNGUNDLOVU IDP PHASE 2
HUMAN/INSTITUTION
• Water Services Authority
• District Technical Services
Department
• District Financial Department
• Implementing Agents: District,
Umgeni Water, Mvula Trust
STRATEGIES:
1.
2.
3.
4.
5.
Improvement of the basic level of water services
Establishing MSPs for efficient delivery
User pay for higher level of service
Maintain existing infrastructure
Establish implementation capacity in District
28
STRATEGY 3.1.1: IMPROVEMENT OF THE BASIC LEVEL OF
WATER SERVICES
DESCRIPTION:
In order to provide free basic water appropriate technology will be
used in incremental improvement of level of service to ensure
sustainability
RESOURCES
FINANCIAL
•
•
•
•
•
DWAF conditional grant
Equitable Share Allocation
CMIP
Mvula Trust
Income from tariffs on both District and
Local level
• District Levy Income
• International funders, e.g. DANCED
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish water policy for district, incl. policy
on free basic water
2. Appropriate technology in unserviced areas
using reservoirs, groundwater, and rainwater
harvesting
HUMAN / INSTITUTIONAL
•
•
•
•
Water Services Authority
District Technical Services
District Financial Department
Implementing Agents: District,
Umgeni Water, Mvula Trust
KEY PERFORMANCE INDICATORS:
Percentage of households with access to free basic water
Percentage of households with access to higher levels of service
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Water
SECONDARY: Addressing Health
29
STRATEGY 3.1.2: ESTABLISHING MUNICIPAL SERVICE
PARTNERSHIPS FOR EFFICIENT DELIVERY
DESCRIPTION:
Establishing Municipal Service Partnerships with water service
providers and support Service Agents
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Formalise service agreements with service
providers, agents and other partners
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
•DWAF conditional grant
•District Technical Services
•Equitable Share Allocation
•Water Services Authority
•CMIP
•Implementing Agents: District,
•Income from tariffs on both District Umgeni Water, Mvula Trust
and Local level
•District Levy Income
KEY PERFORMANCE INDICATORS:
•International donors
Percentage of households with access to free basic water
Percentage of households with access to higher levels of service
Percentage of non-payment for higher levels of service
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Water
SECONDARY: Addressing Health
30
STRATEGY 3.1.3: USER PAY FOR HIGHER LEVEL OF SERVICE
DESCRIPTION:
•The user pays for all levels of service higher than the basic level
of service. Cost recovery must be sustainable, if a higher level of
service is un affordable to the community it serves the project
should not go ahead.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Promote installation of prepayment systems in
schemes providing higher level of service
2. Promote debt collection to be actively
managed with strict credit controls
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
•DWAF conditional grant
•Water Services Authority
•CMIP
•District Technical Services
•Mvula Trust
•District Financial Department
•Income from tariffs on both District •Implementing Agents: District,
and Local level
Umgeni Water, Mvula Trust
•District Levy Income
KEY PERFORMANCE INDICATORS:
•International funders, e.g.
DANCED
Percentage
of households with access to higher levels of service
Percentage of non-payment for higher levels of service
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Water
SECONDARY: Municipal Finance
31
STRATEGY 3.1.4: MAINTAIN EXISTING INFRASTRUCTURE
DESCRIPTION:
Maintain higher levels of service in areas were such higher levels
of service are affordable and therefore sustainable.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Encourage the implementation of water loss
management systems.
2. Ensure preventative maintenance programme
implemented
RESOURCES
FINANCIAL
• Income from tariffs on both
District and Local level
• District Levy Income
HUMAN / INSTITUTIONAL
•
•
•
•
Water Services Authority
District Technical Services
District Financial Department
Implementing Agents: District,
Umgeni Water, Mvula Trust
KEY PERFORMANCE INDICATORS:
Percentage of water loss for higher levels of service.
Number of pipe bursts emergency callouts.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Water
SECONDARY: Municipal Finance
32
STRATEGY 3.1.5: ESTABLISH IMPLEMENTATION CAPACITY IN
DISTRICT
DESCRIPTION:
????
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish engineering capacity
2. Establish financial and administrative capacity
RESOURCES
FINANCIAL
•???
HUMAN / INSTITUTIONAL
•???
KEY PERFORMANCE INDICATORS:
???
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: ???
SECONDARY: ???
33
ISSUE 3.2: ACCESS TO SANITATION
ISSUE STATEMENT:
A large proportion of the district population does not have access
to appropriate, affordable levels of sanitation infrastructure. This
impacts on general levels of health and welfare within these
areas. In areas where infrastructure does exist it is often not
maintained.
OVERVIEW:
Causes: (As for engineering services in general)
Results: Lack of services, lack of community ownership of projects,
exposure to diseases such as cholera, impacts negatively on general levels
of health, contamination of ground water.
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
• Every citizen of the district with access
to proper sanitation
• Payment for services rendered
• Providing affordable levels of services
• Proper usage of sanitation
infrastructure
• Linking water provision with sanitation
• Standardisation of sanitation tariffs (in
line with level of service)
• Community awareness relating to
appropriate usage of water and
sanitation services developed
• Each household have access to at
least Ventilated Improved Pit Latrines
(World Health Organisation
standards) by 2004/2005.
• By 2003 have in place awareness
programmes focussing on health and
hygiene
uMGUNGUNDLOVU IDP PHASE 2
RESOURCES:
FINANCIAL
HUMAN/INSTITUTION
• DWAF allocation to District – R13
million per annum)
• Department of Housing Funding
• Mvula Trust
• Income from tariffs on both District
and Local level
• District Levy Income
• International funders, e.g. DANCED
• Water Services Authority
• District Technical Services
Department
• District Financial Department
• Implementing Agents: District,
Umgeni Water, Mvula Trust
STRATEGIES:
1.
2.
3.
4.
Apply appropriate technology to ensure sustainability
User pays for all services above basic level of service cost
recovery on projects must be sustainable Incremental
improvement in L.O.S. i.e.Pragmatic Innovative approach
Maintaining the levels of service in areas with higher levels of
service.
Use water service providers and support Service Agents
Maximise grant funding
34
STRATEGY 3.2.1: FREE BASIC SANITATION
DESCRIPTION:
•Appropriate technology to be used in incremental improvement of
level of service to ensure sustainability by providing VIP toilets as
free basic sanitation.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Appropriate technology programme using
local community labour intensive methods to
reduce capital cost to service provider
RESOURCES
FINANCIAL
•
•
•
•
•
DWAF conditional grant
Equitable Share Allocation
Mvula Trust
District Levy Income
International donors
HUMAN / INSTITUTIONAL
•
•
•
•
Water Services Authority
District Technical Services
District Financial Department
Implementing Agents: District,
Umgeni Water, Mvula Trust
KEY PERFORMANCE INDICATORS:
Percentage of households with access to VIP toilet
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Sanitation
SECONDARY: Addressing Health
35
STRATEGY 3.2.2: USER PAY FOR HIGHER LEVEL OF SERVICE
DESCRIPTION:
•User pays for all services above basic level of service cost
recovery on projects must be sustainable Incremental
improvement in L.O.S. i.e. pragmatic Innovative approach
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Water borne services to be provided only
when it will be affordable and sustainable.
Cost to be recovered together with the water
charges.
RESOURCES
FINANCIAL
•
•
•
•
•
DWAF conditional grant
Equitable Share Allocation
Mvula Trust
District Levy Income
International donors
HUMAN / INSTITUTIONAL
•
•
•
•
Water Services Authority
District Technical Services
District Financial Department
Implementing Agents: District,
Umgeni Water, Mvula Trust
KEY PERFORMANCE INDICATORS:
Percentage of households with access to higher levels of
sanitation services
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Sanitation
SECONDARY: Addressing Health
36
STRATEGY 3.2.3: MAINTAIN EXISTING SERVICES
DESCRIPTION:
Maintaining the levels of service in areas with higher levels of
service.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Preventative maintenance programme to be
implemented
RESOURCES
FINANCIAL
•
•
•
•
•
DWAF conditional grant
Equitable Share Allocation
Mvula Trust
District Levy Income
International donors
HUMAN / INSTITUTIONAL
•
•
•
•
Water Services Authority
District Technical Services
District Financial Department
Implementing Agents: District,
Umgeni Water, Mvula Trust
KEY PERFORMANCE INDICATORS:
Percentage of households with access to higher levels of
sanitation services
Number of burst/blocked pipes emergency callouts
Down time at treatment works
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Sanitation
SECONDARY: Addressing Health
37
ISSUE 3.3: ACCESS TO ELECTRICITY
ISSUE STATEMENT:
A large proportion of the district population does not have access
to appropriate, affordable levels of electricity. This impacts on
general levels of health and quality of life within these areas. It
further impacts on the quality of essential services such as
education and health
OVERVIEW:
RESOURCES:
FINANCIAL
• Treasury Equitable Share as
allocated to Local Councils
• Department of Minerals and Energy
• Local Council Tariffs
• District Levy Income
Causes: (As per engineering services in general)
Results: Pressure on environment, high cost of energy
DESIRED OUTCOME:
• All resident will have access to
appropriate form of energy.
• District to create a conducive
environment within which DME
implementing agents (e.g.
Eskom) can work
• Implementation of government
policy on free electricity
5-YEAR OBJECTIVE:
• To provide an additional 4 000
electricity connections (grid or
non-grid) per annum of which
50% will be located in rural
areas
uMGUNGUNDLOVU IDP PHASE 2
HUMAN/INSTITUTION
• Department of Minerals and Energy
• Eskom
• REDs (Regional Electricity
Distribution)
• Local Electricity Distributors
• No human capacity required on
district level, pending decision on
REDs
STRATEGIES:
1.
2.
3.
Provide access to free basic electricity
User pay for higher level of electricity service
Fund capital short fall for grid electricity
38
STRATEGY 3.3.1: PROVIDE ACCESS TO FREE BASIC
ELECTRICITY
DESCRIPTION:
Appropriate technology to be used to provide access to free
50kWh/hh/m (Non-grid - interim service level)
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Appropriate technology programme to
provide free basic electricity (grid or nongrid)
RESOURCES
FINANCIAL
•
•
•
•
Equitable Share Allocation
DME
District Levy Income
International donors
HUMAN / INSTITUTIONAL
• District Technical Services
• District Financial Department
• Implementing Agents:
KEY PERFORMANCE INDICATORS:
Percentage of households with access to free basic electricity
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Electricity
SECONDARY: Addressing Education
39
STRATEGY 3.3.2: USER PAY FOR HIGHER LEVEL OF
ELECTRICITY SERVICE
DESCRIPTION:
All higher levels of service the user pays.
RESOURCES
FINANCIAL
•
•
•
•
DME
Equitable Share Allocation
District Levy Income
International doners
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Promote the installation of prepayment
systems in schemes providing higher levels
of service
2. Encourage active management of debt
collection with strict credit controls
HUMAN / INSTITUTIONAL
• District Technical Services
• District Financial Department
• Implementing Agents:
KEY PERFORMANCE INDICATORS:
Percentage of households with access to higher levels of
sanitation services
Debtors book
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Electricity
SECONDARY: Addressing Education
40
STRATEGY 3.3.3: FUND CAPITAL SHORT FALL FOR GRID
ELECTRICITY
DESCRIPTION:
Cut-off capital Cost for Grid connection is R3500. Counter
funding is required from DM/LM to make up short fall
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Using external funding reduce the capital
cost to service provider to bring it below the
connection threshold (R3 500 per
connection
RESOURCES
FINANCIAL
•
•
•
•
DME
Equitable Share Allocation
District Levy Income
International donors
HUMAN / INSTITUTIONAL
• District Technical Services
• District Financial Department
• Implementing Agents:
KEY PERFORMANCE INDICATORS:
Number of new connections
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Electricity
SECONDARY: Addressing Education
41
ISSUE 3.4: ACCESS TO ROAD INFRASTRUCTURE
ISSUE STATEMENT:
The transport infrastructure in the region is failing due to the lack
of funding for the maintenance of roads and the lack of quality
transport routes in the rural/tribal areas specifically. This situation
specifically limits the access of communities to facilities and
services. It also impacts on the levels of economic development
and investment.
OVERVIEW:
RESOURCES:
FINANCIAL
•
•
•
•
•
Department of Transport
Local Municipalities
District Levy income
CMIP
National Roads Agency
HUMAN/INSTITUTION
• Department of Transport
• Local Municipalities
• District (Roads Engineer)
Causes: Divided responsibility in terms of roads (other as per
engineering services in general)
Results: Communities lack access to key facilities and services,
negative impact on economic development
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
• To ensure each communities have easy
access to facilities and services located in
service centres
• Each community to have road access to
service centre and key facilities.
• To promote and create a conducive
environment for economic development
• Coordinate transport network
development with other forms of
infrastructure development
• Roads appropriately maintained
• Resolve roles and responsibilities of
Department and District
• To ensure that all service centres
(tertiary, secondary, municipal and
district) are serviced with
appropriate road network
(including storm water), i.e. all
weather access, by end of the
2004/5 financial year.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
District to act as conduit for distribution of road construction
funds
Co-ordinate roads development and maintenance
42
STRATEGY 3.4.1: DISTRICT TO ACT AS CONDIUT FOR
DISTRIBUTION OF ROAD CONSTRUCTION FUNDS
DESCRIPTION:
uDM to act as conduit for funds from Dot to distribute to LM on an
equitable basis
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Appropriate technology programme using
community labour to reduce cost and ensure
buy-in from community
RESOURCES
FINANCIAL
•
•
•
•
Equitable Share Allocation
District Levy Income
International doners
Dept of Transport
HUMAN / INSTITUTIONAL
•
•
•
•
DoT
District Technical Services
District Financial Department
Implementing Agents:
KEY PERFORMANCE INDICATORS:
Length and frequency of roads maintained
Length of new roads built
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Roads
SECONDARY: Addressing Economic development
43
STRATEGY 3.4.2: CO-ORDINATE ROADS DEVELOPMENT AND
MAINTENANCE
DESCRIPTION:
uDM to act as cross LM co-ordinator
(e.g. uDM to lobby for Subsidisation of Provincial roads through
towns)
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
1.
2.
3.
4.
RESP.
Develop transport management plan
Develop road engineering capacity
Establishing a roads coordinating committee
Lobby for provincial roads through towns
RESOURCES
FINANCIAL
•
•
•
•
Equitable Share Allocation
District Levy Income
International doners
Dept of Transport
HUMAN / INSTITUTIONAL
•
•
•
•
DoT
District Technical Services
District Financial Department
Implementing Agents:
KEY PERFORMANCE INDICATORS:
Percentage of settlement with access to collector roads
Percentage of households with access to higher levels of
sanitation services
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Roads
SECONDARY: Addressing economic development
44
ISSUE 3.5: ACCESS TO SOLID WASTE REMOVAL
ISSUE STATEMENT:
Major landfill sites in the district is reaching capacity even though
the majority of the population does not have access to solid waste
removal services. Landfill sites are expensive to develop and the
dispersed nature of settlement impacts on the coordination of
service delivery.
RESOURCES:
FINANCIAL
HUMAN/INSTITUTION
• District Levy income
• CMIP
• Private sector investment (link to
BOT)
• Local municipalities
• District
• Department of Agriculture and
Environmental Affairs
• DWAF
OVERVIEW:
Causes: High cost of landfill sites, lack of access to services for
a large proportion of the population, lack of education relating to
waste management.
Results: Existing landfill sites reaching capacity, communities
not access to solid waste removal.
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
• To manage solid waste landfill
sites through BOT (buildoperate-transfer) conctracts
• Encourage recycling and waste
minimisation
• Tri-partite partnerships between
public, private and community
sectors to be encouraged.
• To finalise the identification of solid
waste landfill sites/other possibilities
by June 2002 (2002/3 budget
allocation)
• To establish build-operate-traintransfer contracts for the
development of sites
• Budget allocation for Waste
Management for 2002/3 financial
year
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
Acess to solid waste removal
Establish MSPs for development and management of landfill
sites
45
STRATEGY 3.5.1: ACCESS TO SOLID WASTE REMOVAL
DESCRIPTION:
Free basic service needs to be defined in terms of level of service
User pays for all higher levels of service
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Ensuring the collection of basic solid waste
removal
2. Establish education programme for proper onsite disposal of waste
RESOURCES
FINANCIAL
•
•
•
•
•
DWAF conditional grant
Equitable Share Allocation
Mvula Trust
District Levy Income
International doners
HUMAN / INSTITUTIONAL
•
•
•
•
Water Services Authority
District Technical Services
District Financial Department
Implementing Agents: District,
Umgeni Water, Mvula Trust
KEY PERFORMANCE INDICATORS:
Percentage of households with access to solid waste removal
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Solid Waste Removal
SECONDARY: Addressing Health
46
STRATEGY 3.5.2: ESTABLISHING MSPs FOR DEVELOPMENT
AND MANAGEMENT OF LANDFILL SITES
DESCRIPTION:
PPP to be considered to build and operate sites
RESOURCES
FINANCIAL
•
•
•
•
DWAF conditional grant
Equitable Share Allocation
District Levy Income
International donors
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. District to provide guidance to LMs in
establishment of MSPs (guidance MSP White
Paper)
2. MSP partnership business plans
3. Specific landfill site BOTT project to be
implemented
HUMAN / INSTITUTIONAL
• District Technical Services
• District Financial Department
• Implementing Agents:
KEY PERFORMANCE INDICATORS:
Percentage of households with access to refuse removal
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Solid Waste Removal
SECONDARY: Addressing Health
47
ISSUE 3.6: ACCESS TO CEMETERIES
ISSUE STATEMENT:
Cemeteries within the district does not have the required capacity
to service the district in the medium to long term. Short term
capacity is also limited. AIDS is having a dramatic impact on the
capacity. All but two cemeteries will run out of capacity in the next
two to three years. Cremation is in many cases culturally
unacceptable.
RESOURCES:
FINANCIAL
•
•
•
•
HUMAN/INSTITUTION
District Levy income
CMIP
Private sector investment (PPPs)
Local municipalities
• District
• Department of Agriculture and
Environmental Affairs
• DWAF
OVERVIEW:
Causes: Lack of facilities, AIDS, no co-ordinated regional
planning in the past, high cost of facilities, limited land available,
lack of resources to operate and manage.
Results: Continued burials in unsuitable locations, potential of
groundwater contamination, prevent development .
DESIRED OUTCOME:
• Ensure everyone has access to
proper burial facilities
• Encourage private-public sector
partnerships
• Standardisation of rates relating
to cemeteries
• Awareness in rural areas of
impact of home burials
5-YEAR OBJECTIVE:
* To establish sufficient cemetery
capacity in the local municipalities
and district by 2005 for the next 10
years
• Budget allocation for cemeteries for
2002/3 financial year
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
3.
Identify new cemeteries
Establish MSPs for the development and operation of
cemeteries
Develop and promote alternative approaches to burial
48
STRATEGY 3.6.1: IDENTIFY NEW CEMETERIES
DESCRIPTION:
New cemetery sites need to be identified urgently in consultation
with LMs
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Identify district cemetery site by June 2002
2. Support identification of sites on a
municipality level
RESOURCES
FINANCIAL
• Equitable Share Allocation
• District Levy Income
• International doners
HUMAN / INSTITUTIONAL
• District Technical Services
• District Financial Department
• Implementing Agents:
KEY PERFORMANCE INDICATORS:
Percentage of burials in formal cemeteries
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Cemeteries
SECONDARY: Addressing Health
49
STRATEGY 3.6.2: ESTABLISH MSPs FOR THE DEVELOPMENT
AND OPERATION OF CEMETERIES
DESCRIPTION:
Use PPP build & operate cemeteries & crematoria
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. District to provide guidance to LMs in
establishment of MSPs (guidance MSP White
Paper)
2. MSP partnership business plans
RESOURCES
FINANCIAL
• Equitable Share Allocation
• District Levy Income
• International donors
HUMAN / INSTITUTIONAL
• District Technical Services
• District Financial Department
• Implementing Agents:
KEY PERFORMANCE INDICATORS:
Percentage of burials in formal cemeteries
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Cemeteries
SECONDARY: Addressing Health
50
STRATEGY 3.6.3: DEVELOP AND PROMOTE ALTERNATIVE
APPROACHES TO BURIAL
DESCRIPTION:
User pays for all higher levels of service
RESOURCES
FINANCIAL
• Equitable Share Allocation
• District Levy Income
• International donors
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Encourage cremation as an alternative for
everybody
2. Promote the recycling of old graves along
family lineage
3. (Standardised rates for cemeteries in districts)
HUMAN / INSTITUTIONAL
•
•
•
•
Water Services Authority
District Technical Services
District Financial Department
Implementing Agents: District,
Umgeni Water, Mvula Trust
KEY PERFORMANCE INDICATORS:
Percentage of burials in formal cemeteries
Percentage of cremations/ burials in formal cemeteries
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to Cemeteries
SECONDARY: Addressing Health
51
ISSUE 4: ENVIRONMENTAL SUSTAINABILITY
ISSUE STATEMENT:
RESOURCES:
There exists a general lack of awareness regarding the
environment within the District and specifically as it relates to
development activities within the district. Key environmental issues
facing the District in this regard includes solid waste management,
water pollution and catchment degradation.
FINANCIAL
HUMAN/INSTITUTION
OVERVIEW:
Causes: Solid waste: high density development, lack of
services, capacity of landfill. Water pollution: industrial effluent,
polluted runoff from poorly serviced settlements. Catchment
degradation: inappropriate agricultural development, destruction
of wetland areas, soil erosion.
DESIRED OUTCOME:
• More than green environment
• Providing a healthy and safe living
environment for everyone and
everything / species
• Ensure biodiversity Ensure future
costs are minimised
• Promote proactiveness in disaster
management
• Achieving a balance between the
environment and development
5-YEAR OBJECTIVE:
• Have in place a well-coordinated
environmental strategy in the form of a
Strategic Environmental Assessment by
the year 2003 – incl. clear management
and monitoring guidelines (consider biannual state of the environment report
and implementation of LA21 principles)
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
3.
4.
Adopt IEM (Integrated Env. Man.) principles for all projects
Develop under-standing of issues and approaches to
addressing such
Develop environmental awareness and education program
Appropriate resource utilisation
52
STRATEGY 4.1: ADOPT IEM PRINCIPLES FOR ALL PROJECTS
DESCRIPTION:
Adopt and implement the principles of Integrated
Environmental Management (IEM) for all projects and
activities.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Develop checklist for all departments in
preparation and implementation of projects
2. Develop guidelines for project managers to
implement IEM principles
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
• Development Bank of South Africa • Environmental Officer
• Department of Agriculture and
• DTLG
Environmental Affairs
• DANCED
• Private sector investment (PPPs)
KEY PERFORMANCE INDICATORS:
Inclusion of the requirement for environmental assessments
to be carried out in all applicable projects, include tenders,
project proposals and project management and monitoring.
The inclusion of sustainability principles within the
development and outcomes of municipally managed projects
and activities.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: All issues identified
53
STRATEGY 4.2: DEVELOP UNDERSTANDING OF ISSUES AND
APPROACHES TO ADDRESSING SUCH
DESCRIPTION:
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
• Develop environmental guidelines, where appropriate, for activities
which impact on the environment in the district.
• Implement regular environmental monitoring, state of environment
reporting and other reporting and environmental monitoring tools.
• Develop and monitor sustainability indicators of performance.
RESP.
1. Undertake a Strategic Environmental
Assessment for the District as a whole with
involvement of Local Municipalities
RESOURCES
FINANCIAL
• Development Bank of South Africa
• DTLG
• DANCED
HUMAN / INSTITUTIONAL
• Environmental Officer
• Department of Agriculture and
Environmental Affairs
• Private sector investment (PPPs)
KEY PERFORMANCE INDICATORS:
The implementation of actions and projects as developed in
the Strategic Environmental Assessment.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: All issues identified
54
STRATEGY 4.3: DEVELOP ENVIRONMENTAL AWARENESS AND
EDUCATION PROGRAMME
DESCRIPTION:
• Commence environmental education programmes with officials and
councilors.
• Ensure the institutional capacity or awareness to ensure the
enforcement and compliance with environmental legislation, regulations
and controls.
• Promote environmental structures within the communities and support
community driven environmental projects.
RESOURCES
FINANCIAL
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Environmental education programme (aimed at all
levels civil society incl. The public, leadership,
schools etc)
2. Training for councillors and officials on compliance
with environmental law
HUMAN / INSTITUTIONAL
• Environmental Officer
• Development Bank of South Africa • Department of Agriculture and
Environmental Affairs
• DTLG
•
Private sector investment
• DANCED
• Partnerships with communities and
private sector
• NGOs/CBOs (also learn from them)
KEY PERFORMANCE INDICATORS:
An increased environmental awareness by councilors,
officials and community representatives.
Greater communication between council, officials and
communities with respect to improved environmental
management and responsibility.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY:
SECONDARY:
55
STRATEGY 4.4: APPROPRIATE RESOURCE UTILISATION
DESCRIPTION:
• Develop policies committed to reducing and recycling waste.
• Promote an awareness that water is a scarce and valuable
resource, which sustains communities. Ecosystems and
economic development. And ensure water quality, at a
minimum, meets national standards as established by DWAF.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Link resource utilisation strategies with
Strategies 3.1, 3.2 and 3.5
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
• DWAF
KEY PERFORMANCE INDICATORS:
A reduction in waste generated.
An increase in the volume of waste recycled.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Access to water
SECONDARY:
Access to sanitation
Access to solid waste management
56
ISSUE 5: GENDER EQUITY
ISSUE STATEMENT:
Due to a variety of reasons viz. how society defines roles, socially
constructed attributes associated with being male/female etc. there
generally does not exist equity in development processes. This lack
of equity impacts on all levels of development, from the
management of development to the beneficiaries of development.
RESOURCES:
FINANCIAL
HUMAN/INSTITUTION
• Levy – District
• Office of the Status of Women in
the President’s Office
• Commission on Gender Equity
• District Municipality
• Various NGOs
• Commission on Gender Equity
OVERVIEW:
Causes: Institutional representation, illiteracy relating to early pregnancy,
poverty etc, marital arrangements, gender issues relegated to bottom of
list, dependency syndrome
Results: Lack of access to services, illiteracy, economic
disempowerment, bias towards priorities of males
DESIRED OUTCOME:
• Women to have appropriate
representation and be actively involved
in development projects
• The empowerment of women to
actively participate in development
Encourage the development of an
awareness of women’s rights
• Develop a clear policy statement on
gender equity
• Procurement policy to address gender
equity + Skills development for female
staff and councillors
5-YEAR OBJECTIVE:
• The development of a comprehensive
gender policy within the district
addressing the role of women in
development, and addressing social
and economic empowerment, gender
equity in employment, awareness of
women’s rights
• Implementation of policy from 2003
onwards
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
3.
Integrate gender equity in programmes of District
Municipality
Establishment of gender unit
Gender equity focal point managers
57
STRATEGY 5.1: INTEGRATE GENDER EQUITY IN PROGRAMMES
OF DISTRICT MUNICIPALITY
DESCRIPTION:
Incorporation of the gender equity theme into all District
Programme: There is a tendency to ignore and allocate less
resources to gender issues. This can be addressed by incorporating
gender equity theme in all District Programme.
RESOURCES
FINANCIAL
• District Levies
• Office of the Status of
Women in the President’s
Office
• Commission on Gender
Equity
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Identification of programmes within District
Departments where gender equity intervention
required.
2. Gender equity awareness programme (capacity
building) and the role of men in achieving this
HUMAN / INSTITUTIONAL
•
•
•
•
•
District Municipality
Various NGOs
Commission on Gender Equity
Provincial Focal Points
Local municipalities
KEY PERFORMANCE INDICATORS:
Integration of gender equity theme into all District Programmes by
end of 2002.
Attendance of capacity building workshop on gender equality by all
(100%) District Staff and Councillors by middle of 2003.
By year 2005 we will have at least (a minimum) 30% of women in
management positions.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Gender Equity
SECONDARY:
58
STRATEGY 5.2: GENDER FOCAL POINT MANAGERS
DESCRIPTION:
Appointment of Gender Equity Focal Point Managers: All Provincial
Departments will be appointing gender equity focal point individuals.
Main responsibility for these incumbent will be to ensure that gender
issues from respective departments are dealt with. Each District
department must have a gender equity focal point. These
incumbents must be senior managers.
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
• District Levy
• Provincial Gender Equity
Focal Points
• Commission on Gender
Equity
• District: Management
• District: Human Resource
Committee
• District Gender Unit
• Provincial Gender Equity
Focal Points
KEY PERFORMANCE INDICATORS:
Appointment of Gender Equity Focal point Managers by end of
2002.
Completion of gender equity policy by end of 2002
uMGUNGUNDLOVU IDP PHASE 2
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Gender equity policy formulation
2. Establish approach and programme for
monitoring
3. Projects aimed at economic empowerment
of women
4. Focus on increasing opportunities
(integration activity)
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Gender Equity
SECONDARY:
59
STRATEGY 5.3: ESTABLISHMENT OF GENDER UNIT
DESCRIPTION:
Establishment of District Gender Unit: The main purpose of the Unit
would be to ensure that gender issues are dealt with, enforcement
of gender equity policy and assume overall responsibility on gender
equity matters within the District Council.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Appointment of Gender Equity Focal Point
Managers
RESOURCES
FINANCIAL
• District Levy
• Commission on Gender
Equity
HUMAN / INSTITUTIONAL
• District Focal Point Managers
• Provincial Focal Point Managers
• Various NGOs/CBOs
KEY PERFORMANCE INDICATORS:
Establishment Gender Equity Unit by end of 2002
Completed Gender Equity Policy by end of 2002
Staff representation reflecting gender sensitivity
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Gender Equity
SECONDARY:
60
ISSUE 6: EDUCATION
ISSUE STATEMENT:
Education is referred to in its wider context to include school-based
education, literacy and life skills training and specialised education
(e.g. tertiary education). The access of communities to appropriate
and high quality education is limited, this impacting directly on
social and economic development.
OVERVIEW:
RESOURCES:
FINANCIAL
•
•
•
•
•
National Skills Fund
Department of Education
Department of Labour
European Union
Department of Works
Causes: Apartheid education system, lack of integrated settlement
planning, lack of qualified educators, quality of facilities, range of
subjects on offer, lack of coordination
Results: High illiteracy rates, inappropriate education, lack of
specialised training
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
• Achieve higher levels literacy
• Develop a literate and trained
workforce to support economic
development strategies of the District
• High quality education infrastructure
• Promote national skills training
through system of learnership
• Through coordination with the
Department of Education ensure the
provision of relevant (i.t.o. economic
development policies of District) quality
education and infrastructure.
• Through SETAs (Sector Education and
Training Auth) establish and support
learnership programmes
uMGUNGUNDLOVU IDP PHASE 2
HUMAN/INSTITUTION
•
•
•
•
Department of Education
Department of Labour
SETAs
Tertiary Institutions (University,
Technicon, Colleges)
• NGOs
STRATEGIES:
1.
2.
3.
Promotion of adult basic education and training
Facilitation of funding for improved facilities and maintenance
Encourage post school training
61
STRATEGY 6.1: PROMOTION OF ADULT BASIC EDUCATION
AND TRAINING
DESCRIPTION:
Adult Basic Education and Training: District needs to achieve a
high literacy rate, especially with out of school population.
Promotion of adult basic education and training and skills
training will achieve this desired outcome.
RESOURCES
FINANCIAL
•
•
•
•
•
National Skills Fund
Department of Education
Department of Labour
EU
Department of Works
HUMAN /
INSTITUTIONAL
•
•
•
•
•
•
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Skills training programme
2. Training programme for SMMEs (also
industrial)
3. Training on labour intensive projects
4. In-service training of District staff
5. Promote effective use of ABET training
centres
Department of Education
Department of Labour
SETA
Tertiary Institutions
NGOs
ABET Centres (DoE)
KEY PERFORMANCE INDICATORS:
Improve literacy rate (long term)
Improve skills levels (long term)
* Poverty reduction (long term)
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Education
SECONDARY: Skills Development
62
STRATEGY 6.2: FACILITATION OF FUNDING FOR IMPROVED
FACILITIES AND MAINTENANCE
DESCRIPTION:
Facilitation of funding for construction of additional classrooms and
provision of services in schools: Analysis undertaken during the first
phase indicate that the District is not short of schools, however,
more classrooms need to be constructed. This will address the
problem of overcrowding in schools.
RESOURCES
FINANCIAL
• Department of Education
• Department of Public
Works
• European Union
• Private Sector
• Church based foundations
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
1.
2.
3.
4.
5.
RESP.
Provision of basic services in rural schools
Construction of classrooms
Liaison with Dept. on maintenanc
Establishment of information centres
ID/preparation of land for facilities
HUMAN / INSTITUTIONAL
• Department of Education
• Department of Public Works
KEY PERFORMANCE INDICATORS:
Reduce learner classroom ratio in the District to 32 learners per
classroom (obtain current ratios from Dept)
Number of schools with access to basic services
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Education
SECONDARY:
63
STRATEGY 6.3: ENCOURAGE POST SCHOOL TRAINING
DESCRIPTION:
Encourage post schooling training: The high rate of
unemployment can, among other things, be attributed to the
lack of skills which is a direct consequence of poor post school
training. Matriculants who cannot afford tertiary education do not
have sufficient skills to enter the job market.
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
• Department of Labour
• Department of Trade and
Industry
• National Skills Fund
• Department of Labour
• Tertiary Institutions
Sector Education and Training
Authority
KEY PERFORMANCE INDICATORS:
Reduction in unemployment.
Increase SMMEs
Reduced crime rate
uMGUNGUNDLOVU IDP PHASE 2
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
1.
2.
3.
4.
RESP.
Learnership training programme
Internship programme
Needs identification on training in district
District to obtain representation on boards
of tertiary education facilities
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Education
SECONDARY: Skills development
64
ISSUE 7: ADDRESSING HEALTH
ISSUE STATEMENT:
Various factors impact on general health conditions of the
population of the district including poor sanitation, lack of access
to water, epidemics such as AIDS and cholera, limited health
facilities and others.
RESOURCES:
FINANCIAL
• Department of Health
• District Levies
OVERVIEW:
HUMAN/INSTITUTION
•
•
•
•
Department of Health
District (Health Department)
Local Municipalities
NGOs
Causes: Poor sanitation, lack of access to water, AIDS, limited
well-located health facilities (urban bias), poor road infrastructure,
access to medicine
Results: Range of illnesses (AIDS, TB, Cholera), lack of access
to health services
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
• Establish a District Health System
• Developing health awareness
programmes focussed on health and
hygiene
• Considering the impact of
infrastructure on health and
supplying this in line with SDF
• Access to primary health care for all
district citizens
• Acquire the status of a District
Health Authority by the end of 2003
and developing an integrated health
service
• All residents of the District to have
access to primary health care
facilities within walking distance of 5
kilometres by end of 2004/5 financial
year
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
3.
4.
Establish a District Health Authority
The provision of basic service
Coordinate / facilitate the provision health services
Establish programme of volunteerism
65
STRATEGY 7.1: ESTABLISH A DISTRICT HEALTH AUTHORITY
DESCRIPTION:
Establish a district health system in line with national guidelines
RESOURCES
FINANCIAL
• Dept of Health District and
Local Municipalities
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish a task team to investigate and
explore the establishment of a DHA
2. Undertake capacity audit
3. Initiate the establishment of health forum in DM
and LMs
HUMAN / INSTITUTIONAL
•
•
•
•
Dept of Health
District Municipality
Local Municipalities
KwaNaloga and SALGA
KEY PERFORMANCE INDICATORS:
STRATEGIC ISSUES IMPACTED ON:
Increasing regularity of meetings of the Task Team
Establishment of health forums in wards, municipalities and
District Municipality by end of next financial year (June 2003)
uMGUNGUNDLOVU IDP PHASE 2
66
STRATEGY 7.2: THE PROVISION OF BASIC SERVICES
DESCRIPTION:
Programme on provision of services: Poor delivery of services,
particularly in rural areas contributes significantly to the poor
health of these communities. Essential basic services such as
sanitation, water and road infrastructure should be addressed. A
programme focusing on provision of these services is central to
successful implementation of health programme.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Linked to strategies on access to water,
sanitation, electricity, roads, solid waste
removal, cemeteries (See Strategic Issues 3.1
to 3.6)
RESOURCES
FINANCIAL
•
•
•
•
•
•
District
Department of Transport
Department of Works
DWAF
Dept of Health
CMIP (DLG)
HUMAN / INSTITUTIONAL
•
•
•
•
•
District
Department of Transport
Department of Works
DWAF
Dept of Health
KEY PERFORMANCE INDICATORS:
Number of health services with adequate access (within 5km of
residents)
Increased accessibility to clean water
Improved quality of care
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Health
SECONDARY: (Home based care)
67
STRATEGY 7.3: COORDINATE / FACILITATE THE PROVISION
HEALTH SERVICES
DESCRIPTION:
Facilitate funding for provision of health services: Acquiring the
Status of District Health Authority will mean that the District
provide health care service to its citizens. District should
facilitate the funding of health facilities.
RESOURCES
FINANCIAL
• Department of Health
• District Levies
HUMAN / INSTITUTIONAL
•
•
•
•
•
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Provision of mobile clinics in remote areas
(coordinate with pension payment points)
2. Construction of clinics and CHCs and
specialised clinics
3. Health awareness programme
4. Involve traditional healers in health
Department of Health
District (Health Department)
Local Municipalities
NGO
Volunteers and GIPA
KEY PERFORMANCE INDICATORS:
Percentage of population with access to health facilities
Percentage of population with access to mobile clinics (Access to primary health care
facilities for all by end of 2004/5 (access within 5 kilometres - once a week where mobile
clinics))
(Indicator addressing the current urban bias (develop))
Health facility per x population
Health professionals per x population
Reduce cases of TB, Cholera etc.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Health
SECONDARY:
68
STRATEGY 7.4: ESTABLISH PROGRAMME OF VOLUNTEERISM
DESCRIPTION:
Establish volunteerism programme within the District aimed at
augmenting the already strained health services.
RESOURCES
FINANCIAL
•
•
•
•
•
Dept of Health
Faith Community
NGOs/CBOs
Donor funding
Private Sector
HUMAN / INSTITUTIONAL
•
•
•
•
Dept of Health
Faith Community
NGOs/CBOs
Men and women
KEY PERFORMANCE INDICATORS:
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1.
2.
3.
4.
Volunteerism desk in District Health System
ID + secure funding for program
Establish database of volunteers
Greater involvement of people living with AIDS
(GIPA)
5. Promote (+manage) the programme of home
based care
6. Community Health Workers
STRATEGIC ISSUES IMPACTED ON:
No. of volunteers deployed in the health sector
Ratio – number of volunteers per municipality
uMGUNGUNDLOVU IDP PHASE 2
69
ISSUE 8: ADDRESSING HIV/AIDS
ISSUE STATEMENT:
The HIV/AIDS epidemic affects all sectors of society within the District. As
there is currently no cure for HIV/AIDS it will continue to also impact negatively
on all development sectors, i.e. social, economic, infrastructure and welfare
sectors. The current uncoordinated approach to addressing the predisposing
factors and symptoms of the disease is a concern. (Living positively with
AIDS) Prevention and control interventions plus comprehensive care for
those already infected or affected within the context of the Bill of Rights are of
great importance.
RESOURCES:
FINANCIAL
• Department of Health
• NGOs
OVERVIEW:
Predisposing factors: Migrant labour system, extreme levels of poverty,
stigma associated with HIV/AIDS, approach to relationships, promiscuity,
unsafe sex, unprotected sex, gender issues, no cure exists. Results: Lack of
formal health care facilities, alternative support systems not established,
cemeteries no capacity, high number of AIDS orphans, impact on all
development sectors.
DESIRED
OUTCOME:
5-YEAR OBJECTIVE:
• All citizens of the District is
made aware of the causes and
impact of AIDS
• People living with AIDS
(PLWA) are integrated into
society
• Appropriate facilities available
for PLWA sufferers, orphans,
aged left behind
• Coordinated efforts to address
AIDS
• AIDS support Centre and other means
(programmes) to care for orphans (various
age groups) be established within each
Municipal Service Centre
• The District fulfill a facilitative role in
promoting home based care through using
volunteers
uMGUNGUNDLOVU IDP PHASE 2
HUMAN/INSTITUTION
•
•
•
•
•
•
•
Department of Health
District Health Committee
District (Health Department)
NGOs / CBOs
Local Municipalities
Community Health Workers
Department of Welfare and
Population Development
STRATEGIES:
1.
2.
3.
4.
Co-ordinating and supporting municipality based AIDS
awareness.
Promoting HIV/AIDS awareness in conjunction with
Department Of Health
Developing HIV/AIDS support programme
Planning with the impact of AIDS in mind
70
STRATEGY 8.1: COORDINATING AND SUPPORTING
MUNICIPALITY BASED AIDS AWARENESS
DESCRIPTION:
Establish a local municipality based AIDS awareness and support
programme aimed at coordinating all AIDS related activities on the
local level through the offices of the Mayors. The District Mayors
office is to fulfill an overall coordinating role in terms of the
programme.
RESOURCES
FINANCIAL
• Approach based on more effective
use of existing resources available
from the national, provincial and
local government as well as
NGOs/CBOs
• No additional funding required
• Provincial AIDS Action Unit
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Develop municipality based AIDS awareness and
support programme
2. Establish District and Local Municipality AIDS
forums (Mayors)
3. Ongoing monitoring and coordination
HUMAN / INSTITUTIONAL
•
•
•
•
•
•
Department of Health
NGOs/CBOs
Health Manager (District)
Health Officials – LCs
Mayors – DC and LCs
Volunteers (PLWA)
KEY PERFORMANCE INDICATORS:
Operational AIDS awareness and support programme
Operation DC and LC AIDS Forums
(Effective coordination of activities)
Increased demand and supply of condoms and other preventative medicines
and drugs
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Addressing HIV/AIDS
SECONDARY:
71
STRATEGY 8.2: PROMOTING HIV/AIDS AWARENESS IN
CONJUNCTION WITH DEPARTMENT OF HEALTH
DESCRIPTION:
Developing a coordinated HIV/AIDS awareness programme with
local leadership fulfilling a key role in this regard. The programme
to be coordinated through the Municipal AIDS Forums.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. HIV/AIDS awareness training for councillors and
officials (staff)
2. Develop leadership involvement programme
RESOURCES
FINANCIAL
•
•
•
•
Department of Health
District Municipal Levies
NGO/CBOs
Other programmes: e.g.
Love Life
HUMAN / INSTITUTIONAL
•
•
•
•
•
Councillors
District Facilitation Dept.
DC/LC Health Officials
Department of Health
NGOs/CBOs
KEY PERFORMANCE INDICATORS:
Number of councillors actively involved in AIDS awareness
programme
Coordinated AIDS awareness programmes
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Addressing HIV/AIDS
SECONDARY:
72
STRATEGY 8.3: DEVELOPING AIDS/HIV SUPPORT
PROGRAMME
DESCRIPTION:
Developing a comprehensive AIDS support programme aimed at
AIDS sufferers and those affected by AIDS (i.e. AIDS sufferers,
AIDS orphans, the elderly). The programme to include the
establishment of a home-based care system, orphanages, old age
(retirement) homes, and AIDS care centres. Coordination to occur
through the Municipal AIDS Forums
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
• Department of Housing
• Department
of
Social
Welfare
• Department of Health
• NGOs/CBOs
• District and Local Health
Officials
• Department of Health
• Department of Social Welfare
• NGOs/CBOs
• Lifeline (voluntary testing and
counseling centres)
KEY PERFORMANCE INDICATORS:
The development of one AIDS Care Centre per municipality
The development of at least one AIDS orphanage/home per
municipality
The successful establishment and ongoing development of an
home-based care system
uMGUNGUNDLOVU IDP PHASE 2
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
1.
2.
3.
4.
RESP.
Coordinate development of AIDS Care
Centres (incl. voluntary testing/counselling +
drugs available)
Develop home based care system
Develop approach to caring for orphans (all
ages) and the aged
Legal rights relating to AIDS
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Addressing HIV/AIDS
SECONDARY:
73
STRATEGY 8.4: PLANNING WITH THE IMPACT OF AIDS IN
MIND
DESCRIPTION:
IMPLEMENTATION FRAMEWORK
?????
ACTIVITY/PROJECTS
RESP.
1. Promote the consideration of the impact of AIDS
in all planning and development activities
RESOURCES
FINANCIAL
???
HUMAN / INSTITUTIONAL
???
KEY PERFORMANCE INDICATORS:
•
???
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: ???
SECONDARY:
74
ISSUE 9A: SPORT AND RECREATION
ISSUE STATEMENT:
At present sport and recreationis not provided the prominent
place which it deserves in development policies. This sector can
contribute to educating the youth, building a sense of community
and in the medium to longer term reducing crime levels. Lack of
facilities is a major constraint in this sector and in many cases
facilities that exist are inappropriate.
OVERVIEW:
Causes: Lack of facilities, lack of funding to promote sport and
recreation, top-down planning for facilities and events, lack of
focus on traditional culture, absence of a comprehensive strategy
to promote sport and recreation.
DESIRED OUTCOME:
• Provide everyone with access to an
appropriate range of sport facilities
and sport codes on a district level.
• Effective use of existing facilities
through upgrading and needs
assessments
• Better integration and coordination
• Facilities aimed specifically at the
youth and women
5-YEAR OBJECTIVE:
• Ensure communities have access to a
full range of sport and recreation
facilities within each Municipal Service
Centre
• District to strive for various sports
codes to achieve provincial status
• Promote the effective use and
maintenance of facilities
uMGUNGUNDLOVU IDP PHASE 2
RESOURCES:
FINANCIAL
HUMAN/INSTITUTION
• Department of Sport,
Recreation
• District Levy
• Private Sector investors
• National Lottery
• Various sport codes (e.g.
cricket, soccer etc)
• South African Sport
Commission
• Department of Sport and
Recreation
• Sport Councils
• Sport associations
• Professional sport clubs
• Department of Education
STRATEGIES:
1. Establish a district based sport and recreation programme
2. Facilitate access to full basic range of facilities on the municipal
level
3. Upgrade sport code status to provincial
75
STRATEGY 9A.1: ESTABLISH A DISTRICT BASED SPORT AND
RECREATION PROGRAMME
DESCRIPTION:
In cooperation with the Department of Sport and Recreation establish a
district based sport and recreation programme. Such programme is
aimed at establishing a basis for sport development, which will include
accessing relevant training skills, involvement in national and
international events taking place within the municipality and
intercommunity and inter municipality sport events (potential focus on
traditional sports).
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish a sport and recreation forum involving
national Sport Councils
2. Identify, plan and implement series of sport
events (incl traditional sport)
3. Build/strengthen KwaNaloga Games
RESOURCES
FINANCIAL
• Dept
of
Sport
and
Recreation
• District Municipality
• Sport Organisations / Clubs
HUMAN / INSTITUTIONAL
• District Facilitation Dept.
• Sport Organisations / Clubs
• Dept of Sport and Recreation
KEY PERFORMANCE INDICATORS:
Number of District-wide sport events
Expenditure on sport development in the District
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Sport and Recreation
SECONDARY:
76
STRATEGY 9A.2: FACILITATE ACCESS TO FULL BASIC RANGE
OF FACILITIES ON THE MUNICIPAL LEVEL
DESCRIPTION:
Facilitate the development of a full range of basic sport facilities in
each of the municipal centres in the district. Where facilities
currently exist ensure access to all to such facilities and encourage
the establishment of local sport development programmes.
RESOURCES
FINANCIAL
• Cluster Programme – Public
Works
• Dept
of
Sport
and
Recreation
• Private Sector
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Identify facilities required at municipal service
centre level
2. Facilitate access to funding for facilities
3. Facilitate broader access
4. Establish District sports facility
HUMAN / INSTITUTIONAL
• DC Facilitation Dept
• Dept of Sport and Recreation
• Local Municipalities
KEY PERFORMANCE INDICATORS:
Full range of basic facilities in each Municipality.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Sport and Recreation
SECONDARY:
77
STRATEGY 9A.3: UPGRADE SPORT CODES STATUS TO
PROVINCIAL
DESCRIPTION:
.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESOURCES
FINANCIAL
RESP.
1. Establish task team to upgrade sport code to
provincial status
2. Attract international, national and provincial
events (build on existing resources and District
Council’s competitive advantage.
3. Investigate establishment of sport academies
HUMAN / INSTITUTIONAL
KEY PERFORMANCE INDICATORS:
.
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Sport and Recreation
SECONDARY:
uMGUNGUNDLOVU IDP PHASE 2
78
ISSUE 9B: ART AND CULTURE
ISSUE STATEMENT:
At present arts and culture is not provided the prominent place
which it deserves in development policies. This sector can
contribute to educating the youth, building a sense of community
and promote economic development. Lack of facilities is a major
constraint in this sector and in many cases facilities that exist are
inappropriate.
RESOURCES:
FINANCIAL
• Department of Arts and
Culture
• NGOs
HUMAN/INSTITUTION
• DC Facilitation Dept
OVERVIEW:
Causes: Lack of facilities, lack of funding to promote sport,
recreation, art and culture, top-down planning for facilities and
events, lack of focus on traditional culture, absence of a
comprehensive strategy to promote sport, recreation, art and
culture.
DESIRED OUTCOME:
• Utilise Multi-Purpose Community
Centre programme to establish
arts and culture centres
• Promoting arts and culture to
unlock potential for economic
development
• Facilitate the coordination of arts
and culture related activities
5-YEAR OBJECTIVE:
• Establish dedicated art and culture
training and awareness centres in
Municipal Service Centres
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1. Establish a district based arts and culture programme
2. Establish municipal arts and culture training facilities
79
STRATEGY 9B.1: ESTABLISH A DISTRICT BASED ARTS AND
CULTURE PROGRAMME
DESCRIPTION:
Establish a coordinated district based arts and culture programme
aimed at facilitating the development of art and culture in the area
through the hosting of regular events, competitions and shows.
Access for all communities to participating in such events will be a
critical success factor.
RESOURCES
FINANCIAL
• Department of Sport, Arts
and Culture
HUMAN / INSTITUTIONAL
• DC Facilitation
KEY PERFORMANCE INDICATORS:
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish Arts and Culture Forum on a District
Level (link with Arts Council and other
stakeholders)
2. Identify, plan and hold diverse arts and culture
events on a district level (in cooperation with LMs)
3. Facilitate access to training, funding and expertise
for participants (link arts and culture with
economic development
4. Annual competition or festival focussing on for
example African Renaissance
STRATEGIC ISSUES IMPACTED ON:
PRIMARY:
SECONDARY:
uMGUNGUNDLOVU IDP PHASE 2
80
STRATEGY 9B.2: ESTABLISH MUNICIPAL ARTS AND CULTURE
TRAINING FACILITIES
DESCRIPTION:
An arts and culture training facility is to be established in each
municipal centre. Funding for the establishment of such facilities is
to be obtained from the sources earmarked for the establishment
of Multi-Purpose Community Centres.
RESOURCES
FINANCIAL
• Funds for Multi-Purpose
Community Centres
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Facilitate the development of arts and culture
centres on a municipal level
2. Encourage the upgrading and effective utilisation
of existing facilities (e.g. Winston Churchill,
Hexagon Theatre, Hilton etc.)
HUMAN / INSTITUTIONAL
• DC Facilitation Department
• Local Muncipalities
KEY PERFORMANCE INDICATORS:
Establishment and operation of a arts and culture training facility in
each municipal centre
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Arts and Culture
SECONDARY:
81
ISSUE 10: DISASTER MANAGEMENT
ISSUE STATEMENT:
The District is faced by a wide variety of disasters the extent of
which differs substantially. At present disaster management in the
district is uncoordinated and the only substantial capacity exists
with the Msunduzi Municipality. This impacts substantially on the
ability of the District to fulfill its role in terms of disaster
management (only reactive service to date).
RESOURCES:
FINANCIAL
• District Municipality
• Local Municipalities
HUMAN/INSTITUTION
• District Municipalities
• Local Municipalities
OVERVIEW:
Direct causes: Inability to identify and prevent disasters
irrespective of whether they are person-made or natural
Causes of inability to address: no dedicated staff, absence of
legal framework, lack of appropriate funding, planning, capacity
and equipment, also lack of coordination between various councils
DESIRED
OUTCOME:
5-YEAR OBJECTIVE:
STRATEGIES:
• A district disaster management plan
and disaster management centre to
be established by the end of 2002
• Promote the pro-active integration of
disaster management in all activities
of the district and local municipalities
1. Establishment of District Disaster (and local) Management Plan
2. Establishment of District Disaster Management Centre
uMGUNGUNDLOVU IDP PHASE 2
82
STRATEGY 10.1: ESTABLISHMENT OF DISTRICT (AND LOCAL)
DISASTER MANAGEMENT PLAN
DESCRIPTION:
In terms of the Disaster Management Bill each District must
develop a disaster manangement plan in consultation with its local
municipalities. Local municipalities in turn should establish local
disaster management plan.
RESOURCES
FINANCIAL
District Municipality
Local Municipality
Provincial Disaster
Management
HUMAN / INSTITUTIONAL
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Appoint dedicated disaster management official
2. Establish disaster management consultative
forum
3. Develop disaster management plan and facilitate
development of plans on local level
4. Disaster management guidelines for development
activities
District Municipality / Local Municipality
/ Dept of Health / Dept of Social
Welfare / Dept of Transport / Provincial
Disaster Management / DWAF / NGOs
/ SAPS / SANDF / Farmers /
Communities
KEY PERFORMANCE INDICATORS:
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Land Reform and Housing
SECONDARY:
uMGUNGUNDLOVU IDP PHASE 2
83
STRATEGY 10.2: ESTABLISHMENT OF DISTRICT DISASTER
MANAGEMENT CENTRE
DESCRIPTION:
In terms of the Disaster Management Bill each District Municipality
must establish a disaster management centre in its area of
jurisdiction. This centre serves the district as a whole and should
therefore be established in consultation with the local
municipalities.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. On completion of Plan appoint Task Team to
establish Disaster Management centre (possibly
improve on existing)
RESOURCES
FINANCIAL
• District municipality
• Local municipalities
• Private Sector
HUMAN / INSTITUTIONAL
• District municipality
• Local municipalities
• Private Sector
KEY PERFORMANCE INDICATORS:
Operational disaster management centre by end of 2002/2003
financial year
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Disaster Management
SECONDARY:
84
ISSUE 11: CRIME AND SECURITY
ISSUE STATEMENT:
Crime and security is within the South African context an issue
impacting negatively on all sectors of society and therefore also on
most development activities. Failure to address the issue of
crime/security will impact negatively on the Integrated
Development process and future initiatives of the District.
RESOURCES:
FINANCIAL
•
•
•
•
SAPS
District
Local Municipalities
Private Sector
HUMAN/INSTITUTION
•
•
•
•
SAPS
District
Local Municipalities
Private Sector
OVERVIEW:
Causes: Extreme levels of poverty, low moral values and limited
value afforded human life, differing views of different sectors of
society, lack of crime prevention strategies, lack of resources to
implement strategies, lack of public cooperation with SAPS
Results: High crime levels and general lawlessness
DESIRED OUTCOME:
• Basic safe and secure living and
working environment for all
residents of the District.
• A good working relationship
between public, police and justice
system.
• Improve access to justice system.
• Community awareness
programmes
5-YEAR OBJECTIVE:
• Through poverty alleviation, job
creation, community building,
and providing support and
cooperation with the SAPS to
reduce crime levels by 10% per
annum over the next five years
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1. Establish structures to support SAPS
2. Develop crime prevention programme focussed on poverty
alleviation and community building
85
STRATEGY 11.1: ESTABLISH STRUCTURES TO SUPPORT SAPS
DESCRIPTION:
Current safety and security infrastructure in the District is not
sufficient to curb the increasing levels of crime and violence.
Opportunities and mechanisms for supporting the activities
specifically of the SAPS needs to be established.
RESOURCES
FINANCIAL
• District Municipality
• SAPS
• Private Sector
HUMAN / INSTITUTIONAL
•
•
•
•
•
•
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish district level coordination with the SAPS
2. Develop a comprehensive system of Community
Police Forums
3. Investigate establishment of District
Protection/Police/Security Services
4. Encourage and coordinate activities of support
organisations through DMC
Local Municipalities
Safe city project
Farm Watch
Business Against Crime
SAPS (SANDF)
NGOs and CBOs (e.g. NICRO)
KEY PERFORMANCE INDICATORS:
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Crime and Security
SECONDARY:
uMGUNGUNDLOVU IDP PHASE 2
86
STRATEGY 11.2: DEVELOP CRIME PREVENTION PROGRAMME
DESCRIPTION:
Develop comprehensive crime prevention programme (to be
alligned with disaster management plan) for the district in
conjunction with the SAPS. The crime prevention programme to
clearly establish approaches to addressing and curbing specific
crimes, as well as allocate clear responsibilities for various
stakeholders.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Addressed through other strategies (e.g.
education, poverty alleviation, engineering
services etc.
2. Promote establishment of Victim Support Centres
RESOURCES
FINANCIAL
• Private Sector
HUMAN / INSTITUTIONAL
•
•
•
•
SAPS
District Municipalities
Local Municipalities
Private Sector
KEY PERFORMANCE INDICATORS:
Decrease in the level of criminal activity in the District
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Crime and Security
SECONDARY:
87
ISSUE 12: POVERTY ALLEVIATION
ISSUE STATEMENT:
Poverty is a multi-faceted problem which requires a multipronged approach for its eradication. Although poverty
alleviation is the focus of activities of various departments these
initiatives are said to have had limited success to date. Lack of
coordination is often indicated to be a key contributor to the lack
of success.
RESOURCES:
FINANCIAL
•
•
•
•
HUMAN/INSTITUTION
LED Fund of DEDT
Department of Agriculture
Department of Welfare
Working for Water Programme
• Non-governmental
Organisations (NGOs) in the
district
• LED Officer
OVERVIEW:
Causes: Lack of coordination, lack of community participation,
limited consideration for sustainability.
Results: Poverty alleviation projects that are not sustainable,
not addressing the needs of the community and do not relate to
the development policies of the District.
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
• Achieve coordination in all poverty
alleviation and LED programmes
• Promote the financial independence
of communities
• Every household in district to have
an income at least equal to the
household subsistence level.
• (Mobilise and facilitate communities
around projects)
• Through coordinated poverty
alleviation processes and LED
initiatives reduce the percentage
of households earning below
R1500 per month from 60% to
40% by the 2004/5 financial year
• Promote the productive use of
local resources and diversified
groups
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
3.
4.
Poverty alleviation coordination
Promote labour intensive infrastructural development
Promote household food security and nutrition
Establishment of self-help projects and cooperatives
88
STRATEGY 12.1: POVERTY ALLEVIATION COORDINATION
DESCRIPTION:
Poverty is a multi-faceted problem which requires a multi-pronged
approach for its eradication. Although poverty alleviation is the
focus of activities of various departments these initiatives are said to
have had limited success to date. Lack of coordination is often
indicated to be a key contributor to the lack of success.
RESOURCES
FINANCIAL
HUMAN / INSTITUTIONAL
• District Council
• Department of Welfare
• DEDT, CMIP, Welfare,
Health, Agriculture, Housing,
PW, DWAF
• Other agencies
• NGOs
• LED Officer
• DEDT, CMIP, Welfare, Health,
Agriculture, Housing, PW, DWAF
• Other agencies
KEY PERFORMANCE INDICATORS:
Results of Annual Quality of Life Survey
uMGUNGUNDLOVU IDP PHASE 2
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Prepare poverty alleviation plan identifying focus
areas and projects
2. Coordinate poverty alleviation programmes
through SPF
3. Database of poverty alleviation activities
4. Perform quality of life survey
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Poverty Alleviation
SECONDARY: Employment
89
STRATEGY 12.2: PROMOTE LABOUR INTENSIVE
INFRASTRUCTURAL DEVELOPMENT
DESCRIPTION:
Poverty levels are highest in the more rural local authority areas.
Infrastructural development, particularly in rural nodes is seen as a
critical step in driving economic development, which will thus
alleviate poverty in such areas. In this regard, infrastructural
development projects should follow affirmative procurement
guidelines and should be labour-intensive where possible.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Relate to issues 3.1 to 3.6 (provision of
engineering services) specifically promoting
labour intensive construction methods
RESOURCES
FINANCIAL
• Department of Transport
• Department of Water Affairs
and Forestry (DWAF)
• Eskom
HUMAN / INSTITUTIONAL
• NGOs in the district
• LED officer
KEY PERFORMANCE INDICATORS:
Annual Quality of Life Survey
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Unemployment
SECONDARY: Access to sustainable infrastructure / Poverty
alleviation
90
STRATEGY 12.3: PROMOTE HOUSEHOLD FOOD SECURITY AND
NUTRITION
DESCRIPTION:
???
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Agricultural projects of the Dept. of Agricultural
2. Implementation of LRAD (See Issue 1)
RESOURCES
FINANCIAL
•???
HUMAN / INSTITUTIONAL
•???
KEY PERFORMANCE INDICATORS:
???
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: ???
SECONDARY: ???
91
STRATEGY 12.4: ESTABLISHMENT OF SELF-HELP PROJECTS
AND COOPERATIVES
DESCRIPTION:
???
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Identify and promote the establishment of selfhelp projects and the cooperatives aimed
specifically at poverty alleviation
RESOURCES
FINANCIAL
•???
HUMAN / INSTITUTIONAL
•???
KEY PERFORMANCE INDICATORS:
???
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: ???
SECONDARY: ???
92
ISSUE 13: UNEMPLOYMENT
ISSUE STATEMENT:
Unemployment levels are generally high ranging from 52% in
Impendle to 39% in uMshwati, Msunduzi and Richmond
respectively. Unemployment will impact on development in a
number of ways, viz. it impacts on affordability levels of services,
the access of communities to services, levels of crime, general
health and welfare etc.
OVERVIEW:
RESOURCES:
FINANCIAL
• LED Fund of the Department of
Economic Development and
Tourism (DEDT)
• Khula Enterprise
• Ithala Bank
Causes: Economic situation (i.e. low growth), spatial location of
economic development, labour laws, lack of entrepreneurship
training, limited business support, uncoordinated economic
development strategies, lack of rural infrastructure
Results: High unemployment with limited opportunities
DESIRED OUTCOME:
• Attract labour intensive
economic development.
• Involvement of Unions in
job creation processes
5-YEAR OBJECTIVE:
• Through attracting investment
and encouraging local economic
development reduce
unemployment from 40% to 20%
by the end of the 2004/5
financial year
uMGUNGUNDLOVU IDP PHASE 2
HUMAN/INSTITUTION
•
•
•
•
Unions
Department of Labour
Department of Education
Employment / Recruitment
Agencies
• LED officer
STRATEGIES:
1.
2.
3.
4.
Plan and coordinate LED activities
Support entrepreneurial development
Promote entrepreneurship development in all activities of
district
Attract investment on entrepreneurial development
93
STRATEGY 13.1: PLAN AND COORDINATE LED ACTIVITIES
DESCRIPTION:
Supporting entrepreneurial development is the District Council’s
tool in creating job opportunities. The District Council’s key
interventions will be in unleashing the potential of the district,
which may involve identifying areas where training is needed
and in making available infrastructure such as unutilised
buildings for the purpose of entrepreneurial development.
RESOURCES
FINANCIAL
• LED Fund
• Khula Enterprise
• Ithala Bank
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish economic development desk in District
2. Integrate findings of LED related studies
undertaken for Msunduzi, Mooi River and
Richmond
3. Prepare LED plan for the District (DEDT
funding)
HUMAN / INSTITUTIONAL
• Unions
• Department of Labour
• LED Officer (District)
KEY PERFORMANCE INDICATORS:
Numbers of emerging entrepreneurs and projects recorded in
the district.
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Unemployment
SECONDARY: Poverty Alleviation
94
STRATEGY 13.2.: SUPPORT ENTREPRENEURIAL DEVELOPMENT
DESCRIPTION:
The promotion of investment in the district is critical for economic development
in particular, and social development in general. It is seen as the role of the
District Council to create the type of environment that investors will be
attracted to and create effective communication channels with them to enable
the District Council to address the problems that investors may face. An
efficient system of processing development applications is critical in attracting
investment to the district.
RESOURCES
FINANCIAL
• LED Fund
• Khula Enterprise
• Ithala Bank
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Support and promote the activities of the
BSC’s
2. Entrepreneurship development aimed at the
youth
3. Facilitate access of entrepreneurs to
markets, finance and other services
HUMAN / INSTITUTIONAL
• Unions
• Department of Labour
• LED Officer
KEY PERFORMANCE INDICATORS:
Two media conferences per annum
Two mini-Nedlac meetings per annum
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Investment
SECONDARY: Unemployment
95
STRATEGY 13.3.: PROMOTE ENTREPRENEURSHIP
DEVELOPMENT IN ALL ACTIVITIES OF DISTRICT
DESCRIPTION:
???
ACTIVITY/PROJECTS
RESOURCES
FINANCIAL
•???
IMPLEMENTATION FRAMEWORK
HUMAN / INSTITUTIONAL
RESP.
1. Achieve this through procurement policy for:
• Supply tenders
• Construction projects
• Services contracts
2. Promote this in all activities of local
municipalities + gov depts
•???
KEY PERFORMANCE INDICATORS:
???
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: ???
SECONDARY: ???
96
STRATEGY 13.4.: ATTRACT INVESTMENT FOCUSSED ON
ENTREPRENEURIAL DEVELOPMENT
DESCRIPTION:
???
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1.(See Issue 14)
RESOURCES
FINANCIAL
•???
HUMAN / INSTITUTIONAL
•???
KEY PERFORMANCE INDICATORS:
???
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: ???
SECONDARY: ???
97
ISSUE 14: INVESTMENT
ISSUE STATEMENT:
Attracting investment to the region is essential for ensuring
sustained economic development. Levels of investment is,
however, low which is attributed to a number of reasons. Attracting
investment will require a sustained effort from all stakeholders
within the municipality.
OVERVIEW:
RESOURCES:
FINANCIAL
• Industrial Development
Corporation (IDC)
• LED Fund of DEDT
• Ithala Bank
• DTI
HUMAN/INSTITUTION
• Personnel in District Council to
facilitate investment
applications
Causes: Crime, bureaucratic processes, lack of media exposure,
AIDS, lack of investment related information, attitude of local
business and local people, uncoordinated investment promotion
efforts
Results: Lack of investment
DESIRED OUTCOME:
5-YEAR OBJECTIVE:
• To become an economic
growth node by attracting
local and international
investors to the district.
• By creating an environment
conducive to economic
development and providing
incentives for investment. Grow
district economy to reflect at least
a real 6% increase per annum in
district levy
uMGUNGUNDLOVU IDP PHASE 2
STRATEGIES:
1.
2.
3.
4.
Establish environment conducive for investment (especially
labour intensive)
Promote major and community tourism investment
Diversify and promote agricultural development
Promote new and build on existing industrial development
98
STRATEGY 14.1: ESTABLISH ENVIRONMENT CONDUCIVE FOR
INVESTMENT
DESCRIPTION:
Due to the scenic environment, the district’s strategic location in
regards to national and local transport networks, and numbers
of tourists it currently attracts, the district illustrates a great a
potential to develop its tourism potential in order to boost
economic development.
RESOURCES
FINANCIAL
• LED Fund
• Tourism
KwaZulu-Natal
(TKZN)
• District
and
Local
Municipalities
HUMAN / INSTITUTIONAL
•
•
•
•
•
•
Tourism Unit (District)
LED Officer (District)
Local Municipalities
CTOs
Technicon Tourism
Department of Education
KEY PERFORMANCE INDICATORS:
The numbers of tourists per month, reported by all tourism
institutions to the Tourism Desk.
uMGUNGUNDLOVU IDP PHASE 2
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Establish investment promotion agency
(potentially Section 21)
2. Develop coordinated district incentive scheme
(not only finance)
3. Develop marketing strategy (focussing on
competitive advantages)
4. Mini-Nedlac (business, private sector and
labour)
5. Strategic infrastructure provision
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Investment
SECONDARY: Poverty Alleviation
99
STRATEGY 14.2: PROMOTE MAJOR AND COMMUNITY TOURISM
INVESTMENT
DESCRIPTION:
Although the national and district’s agricultural activity continues to
decline, it contributes significantly to most of the local economies
suggesting that it has an important role to play in the livelihoods of
the people of the district. It is for this reason that it is felt that
investment into the sector should continue. However, investment
should focus on agro-processing as a means of generating higher
levels of income.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. District coordination of CTFs
2. Develop database of tourism opportunities
(link in Dbn market)
3. Feasibility studies and implementation of key
tourism projects
RESOURCES
FINANCIAL
•
•
•
•
LED Fund
Department of Agriculture
Dept of Land Affairs
Dept
of
Economic
Development
HUMAN / INSTITUTIONAL
• LED Officer
• Department of Agriculture
• Dept of Land Affairs
KEY PERFORMANCE INDICATORS:
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Investment
SECONDARY:Unemployment
uMGUNGUNDLOVU IDP PHASE 2
100
STRATEGY 14.3: DIVERSIFY AND PROMOTE AGRICULTURAL
DEVELOPMENT
DESCRIPTION:
Manufacturing is the dominant economic sector in the district.
However, its performance has declined as a result of global
competition following trade liberalisation in the country. Investment
in manufacturing should be encouraged as it has potential to
create jobs on a relatively large scale, more so if interventions such
as SMME development and outsourcing are explored.
IMPLEMENTATION FRAMEWORK
ACTIVITY/PROJECTS
RESP.
1. Encourage diversification into niche
markets (e.g. flowers, bees, aquaculture)
2. Establish small farmers (Issue 1)
3. Support agricultural development
RESOURCES
FINANCIAL
• Industrial
Development
Corporation (IDC)
• LED Fund
• DTI
HUMAN / INSTITUTIONAL
• LED officer
• Business organisations
• Business support centre
KEY PERFORMANCE INDICATORS:
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: Investment
SECONDARY: Unemployment
uMGUNGUNDLOVU IDP PHASE 2
101
STRATEGY 14.4: PROMOTE NEW AND BUILD ON EXISTING
INDUSTRIAL DEVELOPMENT
DESCRIPTION:
???
ACTIVITY/PROJECTS
RESOURCES
FINANCIAL
•???
IMPLEMENTATION FRAMEWORK
HUMAN / INSTITUTIONAL
RESP.
1. Promote agri-processing
2. Build on existing strengths in aluminum,
footwear etc
3. Industrial park development
4. Market competitive advantages of District
(see Strategy 1)
•???
KEY PERFORMANCE INDICATORS:
STRATEGIC ISSUES IMPACTED ON:
PRIMARY: ???
SECONDARY: ???
uMGUNGUNDLOVU IDP PHASE 2
102