Transcript Slide 1

Draft discussion notes included.
To join the meeting:
Phone Number: +1 770-657-9270
Participant Passcode: 943377
WebEx link is on the wiki (link below)
Care Plan (CP) Team Meeting Notes
(As updated during meeting)
André Boudreau ([email protected])
Laura Heermann Langford ([email protected])
2011-06-08 (No. 15)
Care Plan wiki: http://wiki.hl7.org/index.php?title=Care_Plan_Initiative_project_2011
HL7 Patient Care Work Group
Agenda for June 8th
•
•
•
•
•
•
Update re S&I group progress (Laura)
Feedback from WGM in Orlando- Review meeting notes (All)
Storyboards (Laura, Danny, Susan) - deferred
Care plan situations update (Susan) - deferred
Summer period schedule
Next meeting agenda
Page 2
Agenda for June 22nd
• Storyboards (Laura, Danny, Susan)
 NOTE: this is our top priority deliverable
• Care plan situations update (Susan)
• Next meeting(s) agenda
Page 3
Future Topics
•
•
•
•
•
•
Review of the ISO CONTSYS work on care plan aspects
Review of EHR-S FM R2 work by the HL7 EHR WG
Care Plan elements from KP, Intermountain, VA, etc. (Laura)
Requirements (André)
EA Vs Eclipse: EA is preferred by many: Luigi, +++
Comparison of care plan contents (Ian, Laura)
 To inform the information model
 Start of spreadsheet (Laura…)
• Overarching term to use (Ian M.)
• Care Plan Glossary
• Forward plan- first cut
Page 4
Participants- WGM Meetg of 2011-06-08 p1
Name
email
Country
Yes
Notes
André Boudreau
[email protected]
CA
Yes
Co-Lead- Care Plan initiative/HL7 Patient Care WG. B.Sc.(Physics), MBA. Owner Boroan Inc.
Management Consultin. Chair, Individual Care pan Canadian Standards Collaborative Working Group
(SCWG). Sr project manager. HL7 EHR WG.
Laura Heermann
Langford
[email protected]
US
Yes
Co-Lead- Care Plan initiative/HL7 Patient Care WG. Intermountain Healthcare. RN PhD,: Nursing
Informatics; Emergency Informatics Association, American Medical Informatics Association; IHE
Stephen Chu
[email protected]
AU
Yes
NEHTA-National eHealth Transition Authority . RN, MD, Clinical Informatics; Clinical lead and Lead
Clinical Information Architecture; co-chair HL7 Patient care WG; vice-chair HL7 NZ
Peter MacIsaac
[email protected]
AU
HP Enterprise Services. MD; Clinical Informatics Consultant; IHE Australia; Medical Practitioner General Practice
Adel Ghlamallah
[email protected]
CA
Canada Health Infoway. SME at Infoway (shared health record); past architect on EMR projects
William Goossen
[email protected]
NL
Results 4 Care B.V. RN, PhD; -chair HL7 Patient Care WG at HL7; Detailed Clinical Models ISO TC 215
WG1 and HL7 ; nursing practicioner
Anneke Goossen
[email protected]
NL
Results 4 Care B.V. RN; Consultant; Co-Chair Technical Committee EHR at HL7 Netherlands; Member
at IMIA NI; Member of the Patient Care Working Group at HL7 International
Ian Townsend
[email protected]
UK
NHS Connecting for Health. Health Informatics; Senior Interoperability Developer, Data Standards and
Products; HL7 Patient Care Co-Chair
Rosemary Kennedy
[email protected]
US
Thomas Jefferson University School of Nursing . RN; Informatics; Associate Professor; HL7 EHR WG;
HL7 Patient care WG; terminology engine for Plan of care;
Jay Lyle
[email protected]
US
JP Systems. Informatics Consultant; Business Consultant & Sr. Project Manager
Margaret Dittloff
[email protected]
US
The CBORD Group, Inc.. RD (Registered Dietitian); Product Manager, Nutrition Service Suite; HL7 DAM
project for diet/nutrition orders; American Dietetic Association
Audrey Dickerson
[email protected]
US
HIMSS. RN, MS; Standards Initiatives at HIMSS; ISO/TC 215 Health Informatics, Secretary; US TAG
for ISO/TC 215 Health Informatics, Administrator; Co-Chair of Nursing Sub-committee to IHE-Patient
Care Coordination Domain.
Ian McNicoll
[email protected]
UK
Ocean Informatics . Health informatics specialist; Formal general medical practitioner; OpenEHR;
Slovakia Pediatrics EMR; Sweden distributed care approach
Danny Probst
[email protected]
US
Yes
Intermountain Healthcare. Data Manager
Kevin Coonan
[email protected]
US
Yes
MD. Emergency medicine. HL7 Emergency care WG.
Gordon Raup
[email protected]
US
Susan Campbell
[email protected]
US
Elayne Ayres
[email protected]
US
CTO, Datuit LLC (software industry).
Yes
PhD microbiologist. Principal at Care Management Professionals. HL7 Dynamic Care Plan Co-developer
NIH National Institutes of Health. MS, RD; Deputy Chief, Laboratory for Informatics Development, NIH
Clinical Center ; Project manager for BTRIS (Biomedical Translational Research Information System), a
Clinical Research Data Repository
Page 5
Participants- WGM Meetg of 2011-06-08 p2
Name
email
Country
Notes
Yes
David Rowed
[email protected]
AU
Charlie Bishop
[email protected]
UK
Walter Suarez
[email protected]
US
Peter Hendler
[email protected]
US
Ray Simkus
[email protected]
CA
Lloyd Mackenzie
[email protected]
CA
LM&A Consulting Ltd.
Serafina Versaggi
[email protected]
US
Clinical Systems Consultant
Sasha Bojicic
[email protected]
CA
Lead architect, Blueprint 2015, Canada Health Infoway
Agnes Wong
[email protected]
CA
RN, BScN, MN, CHE.
Clinical Adoption - Director, Professional Practice & Clinical
Informatics, Canada Health Infoway
Cindy Hollister
[email protected]
CA
RN, BHSc(N), Clinical Adoption -Clinical Leader, Canada Health
Infoway
Valerie Leung
[email protected]
CA
Pharmacist. Clinical Leader, Canada Health Infoway
Information Architect at LOINC and at HL7. Enterprise Data
Architect at VA. Developing standard for Detailed Clinical Models
(DCM), information models for Electronic Health Record (EHR)
Diabetes Project, etc.
Luigi Sison
[email protected]
US
Brett Esler
[email protected]
AU
Catherine Hoang
[email protected]
Hugh Leslie
[email protected]
Seam Heard
[email protected]
Yes
Pen Computer Sys
US
VA
Tom Kuhn
Mona
Sr. Systems Architect at American College of Physicians
???
??
Yes
Page 6
S&I FRAMEWORK GROUP
(TRANSITION OF CARE)
Page 7
S&I Framework
• Transition of Care sub-group, also some 20 others,
uncoordinated
• New Web site: http://wiki.siframework.org/
• Close liaison by Laura, and exchange of material
• S&IF: Moving very fast, dedicated resources
 Timeline driven, HITAC Act
 MU Phase 2 may be delayed; their specs being developed
independent of the S&IF work!
 Quality of deliverables is unknown and may not be a priority given the
deadline they have
• They like the dynamic care plan and the ad hoc communication
of care plans
• Not at the technical level
• Use CCR, CCD, CDA
Page 8
Other Comments
• ONC Policy Committee (Susan)
 They are backing off from the concept of a longitudinal care
plan
 History of encounters
Page 9
ORLANDO WGM MEETING
Page 10
Discussion- WGM Care Plan Meeting
• See updates.
• Additional discussion notes:
 Need to get close to EHR-S FM R2
o We need to understand functional requirements to best define
interchanged information
o Plan review of relevant R2 contents with EHR WG rep.
 Will there be links to Orders in the care plan messages?
o We need links to events
o We need to position interchanged information in the context of
continuity of care
o In nursing, not all details are documented
o We need to keep away from implementation aspects and from
the applications that are used to prepare and update care plans
Page 11
STORYBOARDS
Page 12
2011-05-11
Storyboards
• Home Care: André: yes
 Reviewed and updated
• Deferred after WGM
 Acute Care Plan Storyboard: Danny
o In progress
 Perinatology: Laura
 Stay healthy: Laura
 Pediatric and Allergy/Intolerance: Susan
• 20110608: André to update Storyboard document with
material from Danny and Susan
Page 13
FUTURE MEETINGS- SUMMER PERIOD
Page 14
Meetings During the Summer Period
• We will move to a meeting every second week until the end of
August. Schedule is:





June 22
July 6
July 20
August 3
August 17
• We will keep the intermediate slot in place in case we want to
use them for specific cases like…
 Review of the ISO CONTSYS work on care plan aspects
 Review of EHR-S FM R2 work by the HL7 EHR WG
Page 15
CONCLUSION
Page 16
Action Items as of 2011-06-08
No.
Action Items
By
Whom
For
When
Status
Laura
(Danny)
Active: Underway
André
Outstanding - Request
made
Stephen/
William
Reformulated
Draft a new PSS and review with project group
André
Deferred
10
Complete a first draft of requirements
André
Started
12
Complete storyboards
Multi
Started
14
Send updated summer schedule
André
2.
Do an inventory of use cases and storyboard on hand
3.
Ask William for an update (add in a diff colour to the appropriate pages)
5
Obtain OK from ISO to use their CONTSYS work on Care Plan for our work
9
NB: Completed action items have been removed.
Page 17
APPENDIX
Page 18