Transcript Document
Western Irrigation Futures Customer Information sessions May 2010 Bacchus Marsh Irrigation District Today’s discussion… 1. Feedback from customer workshops and surveys 2. Key findings from WIF – Bulk water options – Infrastructure options investigated – On-farm management practices 3. Future water supply – Longer term – Next season 4. Next steps – Customer reference group 2 Recap… WIF Atlas Customer Consultation Technical Workshops Bulk Water Environment Infrastructure On farm Draft Options Paper Detailed Technical Work Final Options Paper Government / Agency consultation Today’s 3 discussion Customer engagement and consultation 1. Customer Feedback 4 What you told us you would like… • Key issues – Secure source of water – Sufficient volume to support historic production levels – Water at affordable price – Make recycled water available, and – Fix leaky channels • Other concerns raised – Farming viability – Agricultural practices – Future of the district And, we gave a commitment to keep you informed 5 2. Key Findings: Bulk Water Supply Options 6 Bulk water options investigated • River water supply • Trading options – – – Connection to Goldfields super pipe • Supply to Pykes Creek reservoir • Supply direct to Bacchus Marsh • Reinstate Central Highlands Scheme North/South pipeline Macalister Irrigation District • Metro water – Accessing water from the Melbourne pool • Government announced access to 3,000ML for BMID • Recycled water – – – Supply from WTP Caroline Springs Other sources • Groundwater – – 7 Increasing bore numbers (allocation) Accessing deeper aquifer River water supply – climate scenarios… Lerderderg River Seasonal Inflows (at Sardine Creek) 8 Goldfields Superpipe • 760 mm diameter pipe – Urban supply for Ballarat – Water from Goulburn system via pipe to Bendigo • Pipe route located near top of Werribee catchment • 3 options – Pipe to upper Werribee – Reinstate Central Highlands scheme – Pipe to BMID 9 Trading options… • Purchase Goulburn Water • Pay transfer cost through via Bendigo and Goldfields Super pipe • Build connecting infrastructure Option Reinstate Central Highlands Scheme Supply to Upper Werribee Supply direct to Bacchus Marsh 11 Capital Cost Key issue $ per ML $4.5 m High water loss $2,150 $15.2 m High water loss $2,200 $65 m High capital cost $3,000 Trading options… • North South Pipeline – Government committed to maximum 75,000 ML/year cap – Commitment to Northern Irrigators that this would be maximum amount – Option to access water from northern Victoria not available • MID – Thomson Dam 12 – 11,000 ML Entitlement on key rivers in the MID (trading zone) – 30% can be transferred across the system – Water must be purchased and water transferred through district. – Cost to transfer is $745 per ML for 2009/10. – Limited flow rate and timing of delivery Metro water supply… • Available to access up to 3,000ML per year • Delivery via Western Water’s urban water supply system • Contract details – Supply by Agreement (Entitlement) with City West Water to SRW – Delivery agreement with Western Water • Access and pricing arrangements reviewed every five years • Price structure set by Essential Services Commission (ESC) • Same structure for all water authorities 13 Other Options… • Recycled Water – Caroline Springs • Option no longer available commitments made elsewhere in investment and usage and has high operating cost – Bacchus Marsh • Fully contracted by Western Water and • Fully committed in the future – Western Treatment Plant • Not economic – $50m pipe/pump investment plus • Cost to expand Class A plant • Groundwater – Merrimu – full allocated, hydro assessment no further water available – Parwan – full allocated, hydro assessment no further water available – Other – accessing groundwater elsewhere and pipeline to BMID is capital intensive and high risk 14 2. Key Findings: Infrastructure Options 15 Infrastructure options …. • Pipelining – – – – Piping from weir technically difficult due to flat grade Large pipes and low velocities Uncertainty if some existing pipes can take higher pressure Not costed • Channel lining – Lining of Werribee Vale Road channel unfeasible due to silting – Liners damaged with silt removal • Balancing Storage (320 ML) – Cost $6.2m, plus – 2 kilometre transfer pipe $1.5m • Reconfiguration… – Suggested at first workshops – Focus on upgrading parts of the supply system – Improve operational flexibility and reduce delivery losses 16 Total upgrade cost estimated $12.9m (assumes main channel mothballed) If option to include lining then section 5 & 3 are not needed. Section 6 – Balancing Storage Transfer Pipe Cost - $1.5M - Plus balancing storage cost approx $6.2m Section 7 - Channel lining from siphon to spur 12 cost approx $2.8m Section 5 – Connecting pipe spur 3/12 Cost - $1.26m Section 4 – Pipe section of spur 12 Cost - $1.4m Section 3 – Upgrade connection 2/2 to 5 Cost - $150k Infrastructure Options Section 1 – Werribee Vale Road Pipeline Cost - $2.4m 17 Section 2 – Abandon 10/5 Channel Infrastructure options …. • Reconfiguration option 1 – cost $12.9m – – – – – – Interconnection of existing pipelines Pipelining supply to Werribee Vale Road customers Mothballing main channel Balancing storage and transfer pipe Pipe section of spur 12 Expected efficiency 85% – 90% • Reconfiguration option 2 – $14.3m – – – – – 18 Pipelining supply to Werribee Vale Road customers Balancing storage and transfer pipe Pipe section of spur 12 Channel lining from siphon to spur 12 crossing Expected efficiency 85% – 90% 2. Key Findings: On-farm issues 19 On-farm issues addressed… • Commercial considerations – – – – Cost of production Choice, mix and rotation of crop types Scale of operation and constraints Land values, planning regulations and impacts of development on farming • Water resource availability – Security of water supply to grow crops – Scope to reduce water use by utilising other irrigation methods • Agronomy and water quality – Identification and costing of best practice requirements for irrigation, soil salinity and nutrient management • Environmental implications – Understanding of potential impacts on environmental assets • Social factors – Social, cultural, adoption of technology, management practices and business decisions 20 3. Future Water Supply 21 Future supply options… • Government announced access to 3,000ML of metro water • Access limited to 10ML/d flow rate with possible reduction during peak demand days • Addition of balancing storage would provide ability to increase up to 20 ML/d during summer on limited days • Supply may include a mix of river water (when available), and metro water to maximise supply and flow rate and minimise losses 22 Water availability – 2011/12… • Water outlook 1 July 2010 – River water allocation likely to commence at 6% • Based on zero inflows and no deliveries – Emergency water supply not used by 30 June 2010 to be reallocated • Supplementary options – Access a volume of the metro water for next season • Price is $1,357 per ML – Potential trading Options • Macalister trading • Trading with Werribee (if water balance OK) 23 BMID water balance – 2009/10 Delivered Volumes (2009/10) Target Volume (25% equivilent allocation) Emergency water carried over from 2008/09 (Thomson and Merrimu unallocated)* River Water - 2009/10 2009/10 Thomson Water (inc second connection) Total Estimated Actual Minimum Actual Usage Target 2009/10 to 18 ML ML Apr – *Remaining river water based on 14% allocation 24 Remaini ng 2009/10 1085 556 180 530 616 295 302 235 314 350 1086 425 1571 190 787 235 784 BMID estimated water balance – 2010/11 Source Current Emergency supply Estimated usage remainder 2009/10 Estimated Starting allocation - 6% Minimum inflows (4%) Minimum available volume 25 ML 470 Comments Current volume available 100 264 180 814 Based on last year pus about 15% Based on current usage and no further inflows Based on historical minimum inflows Similar to usage in 2009/10 Effective charges including usage from Metro system… $2,000 100 $1,800 90 $1,600 80 $1,400 70 $1,200 60 $1,000 50 $800 40 $600 $400 30 20 $200 10 $- 0 Status Quo 26 Next season ML Average charges - 150ML Entitlement 4. Next steps 27 Consultation process… • Establish Customer Reference Groups – Separate groups for WID and BMID • Seek nominations – 1 WBMCCC for each group – 6 customer representatives for each group – Stakeholder representatives • Appoint independent chair • Terms of reference to include – Bulk water supply options – Pricing matters – Infrastructure issues (e.g. channels and storages) – Environmental matters – Contract matters (metro water supply) 28