Transcript Document

Facilities Update
Site Improvements
Encinitas Union School District
September 5, 2006
Capri
•
•
•
•
•
New HVAC system
New campus entrance w/ student
drop-off / pick-up
Playground asphalt replacement
and regrade.
Moved in one relocatable to house
Media Center during construction
Next steps
–
–
–
–
–
–
–
Landscaping and irrigation at front
of site
New marquee
Parking area
Media Center
Outdoor patio
Elevator
New stucco and painting
El Camino Creek
• Completed three
cottage-style
classrooms
• Next steps
– Sandblast and repaint
stairways
– Replant slopes
Flora Vista
•
Preschool addition
– Added two offices and one
classroom
– Replaced carpet with VCT
– Replaced existing toilets
•
•
•
•
•
•
Remodeled main office
Remodeled principal’s office
Replaced school roof
Replaced lunch shade shelter
Sandblast and repaint windows
Next steps
– Remodel existing storage
– Add tack board to interior
hallways
– Replace asphalt (06-07)
– Paint exterior of school (06-07)
La Costa Heights
• Completing two new
bathrooms
• Added relocatable classroom
• Next steps
– Replace old playground
equipment
– Replace safety surfacing on
playgrounds
– Convert relocatables at back of
site to cottage-style classrooms
– Add modular cottage at front
of site
Mission Estancia
• Remodeled new computer
room
• Next steps
– Replace tiles on outside walls
– Move relocatables to south
side of site and convert to
cottage-style classrooms
– Replace school roof (solar?)
(06-07)
Ocean Knoll
• Remodel auditorium
• Remodel office entry
• Conversion of HVAC
plant to storage room
• New ball wall
• Playground asphalt
recycled and replaced
• Next steps
– Add school sign
– Asphalt striping
Ocean Knoll
Olivenhain Pioneer
• Added nine cottage-style
classrooms on east side
of site
• Added three bathrooms
• Replaced carpet, tile, and
painted throughout site
• Next steps
– Complete sink in existing
art room
– Replace school roof
(solar?) (06-07)
– Replace HVAC (07-08)
Olivenhain Pioneer
Park Dale Lane
• Office renovation
• Next steps
– Add modular
cottage at east side
of site
Paul Ecke Central
• Renovate teacher’s lounge into
kitchen and workroom
• New computer lab
• Replaced old portable classroom
w/ cottage-style classroom
• Next steps
– Remodel auditorium
– Add three classrooms adjacent to
auditorium
– Improve perimeter along Vulcan
– Add student drop-off/pick-up on
Vulcan
– Renovate parking on west side of
site
Next Steps…
• Adoption of standardized
classroom
• Renovate playgrounds at all sites
• Review facility priorities from
2004
• Site visits to determine current and
future facility needs and priorities