Facilities Update Site Improvements Encinitas Union School District September 5, 2006 Capri • • • • • New HVAC system New campus entrance w/ student drop-off / pick-up Playground asphalt replacement and regrade. Moved in one relocatable to house Media Center during construction Next steps – – – – – – – Landscaping and irrigation at front of site New marquee Parking area Media Center Outdoor patio Elevator New stucco and painting El Camino Creek • Completed three cottage-style classrooms • Next steps – Sandblast and repaint stairways – Replant slopes Flora Vista • Preschool addition – Added two offices and one classroom – Replaced carpet with VCT – Replaced existing toilets • • • • • • Remodeled main office Remodeled principal’s office Replaced school roof Replaced lunch shade shelter Sandblast and repaint windows Next steps – Remodel existing storage – Add tack board to interior hallways – Replace asphalt (06-07) – Paint exterior of school (06-07) La Costa Heights • Completing two new bathrooms • Added relocatable classroom • Next steps – Replace old playground equipment – Replace safety surfacing on playgrounds – Convert relocatables at back of site to cottage-style classrooms – Add modular cottage at front of site Mission Estancia • Remodeled new computer room • Next steps – Replace tiles on outside walls – Move relocatables to south side of site and convert to cottage-style classrooms – Replace school roof (solar?) (06-07) Ocean Knoll • Remodel auditorium • Remodel office entry • Conversion of HVAC plant to storage room • New ball wall • Playground asphalt recycled and replaced • Next steps – Add school sign – Asphalt striping Ocean Knoll Olivenhain Pioneer • Added nine cottage-style classrooms on east side of site • Added three bathrooms • Replaced carpet, tile, and painted throughout site • Next steps – Complete sink in existing art room – Replace school roof (solar?) (06-07) – Replace HVAC (07-08) Olivenhain Pioneer Park Dale Lane • Office renovation • Next steps – Add modular cottage at east side of site Paul Ecke Central • Renovate teacher’s lounge into kitchen and workroom • New computer lab • Replaced old portable classroom w/ cottage-style classroom • Next steps – Remodel auditorium – Add three classrooms adjacent to auditorium – Improve perimeter along Vulcan – Add student drop-off/pick-up on Vulcan – Renovate parking on west side of site Next Steps… • Adoption of standardized classroom • Renovate playgrounds at all sites • Review facility priorities from 2004 • Site visits to determine current and future facility needs and priorities