Transcript Slide 1

Tunnel
Engineering for
Indian Railways
Pir Panjal Tunnel
Pir Panjal Tunnel
The tunnel is almost straight, extending from north to
south. It is 8.4m wide and 7.3m high.
Pirpanjal Tunnel

Pir Panjal (or T-80) is
India's longest
transportation railway
tunnel at 10.96km.

The tunnel section is a
part of the 202km
Udhampur - Srinagar Baramulla rail link
project undertaken by
the Northern Railways
Pirpanjal Tunnel

It operates 440m below
the existing Jawahar
Tunnel, which is the only
road link from the
region to the rest of
India.
Tunnel engineering at a
glance
1. Topographic survey
• Topographic survey done for
2000m length and for a width of
100m on either side of centre line
of the tunnel
• Resolution with a grid of size
25m x 25m
• Gradient of 1 in 200 adopted in
the tunnel throughout for easy
drainage
2. Geotechnical investigations
• 9 bore holes with a
maximum
depth
of
51.0m below natural
ground level
• Rotary
type
boring
machine with diamond
bits was used.
• Jointed basalt (above
crown), breccia (in the
Tunnel
section),
Amygdaloidal
basalt,
volcanic ash (below
invert)
etc
are
encountered.
3. Field tests
(a) Electrical resisitivity tests
• Current applied in the outer pair of
electrodes
• Potential difference measured at the
central pair of electrodes
• Resistivity governed by the amount of
pore water and arrange of pores
3. Field tests
(b) Pressure meter tests (Stress – Strain relationship of
soil mass and deformation modulus, E)
• Determine rock strength parameters, E for Basalt is 5000
MPa
3. Field tests
(c) Lugeon tests (Permeability
characteristics of rock mass
• Permeability values are found
to be low.
•Assessment of grouting
requirement.
3. Field tests
(d) Seismic Tomography
• Fast emerging powerful tool and precise in-situ
determination of seismic velocities
• Detailed information about the soil and rockmass
properties
• Separation of drill bore holes not more than 60m to
give better resolution
4. Tunnel Design
Design parameters:
1. Density
2. Water absorption
3. UCS
4. Core recovery
5. RQD
6. E value
7. Tensile strength
8. RMR
9. Q value
Tunnelling Video

Manual

Tunnel Boring Machine
TUNNELS IN SOUTH
CENTRAL RAILWAY
Construction of BG Single line Railway Tunnel
between Margutti (H) and Kamalapur stations
In Bidar – Gulabarga section
• Tunnel length: 1500 RM
Tunnel layout
Trolley refuge at every 100m
Main tunnel
Escape tunnel
AREA-55.19 sqm
area:25.94 sqm
Tunnel radio system VIDEO
Thank you