2011 Changes Two Minute Drill - E Light Safety, Training

Download Report

Transcript 2011 Changes Two Minute Drill - E Light Safety, Training

INSTRUCTIONS
 Click on the slide show ICON in the lower left hand corner of this screen to start the slide
show. The timer will only work if you put the presentation into
Presentation Mode.
 A question will appear and stay on the screen for 2 minutes. The
question will then be replaced with the correct answer and code
reference. This process will repeat until you reach a slide with a
stop sign. You can then click on the slides and the questions and
answers will be repeated without the timer so you can look up the
answers or take notes.
 Do not worry about writing down the answers until after the timed
portion of the program.
 Concentrate on finding the answer and improving your speed
using the NEC. This drill is focused on changes to the 2014 NEC.
( C)
CO P Y RI G HT
2014
T E D " S M I TTY " S M I T H
2
1. Cords and cables of listed cord and plug and plug connected equipment in an
elevator hoistway ______________be required to be installed in a raceway.
A. Shal
B. Shall not
Answer 1.
B. Shall not
620.21 Ex.
2. Flexible cords and cables rated 105 degrees C. shall us correction factors in the
_____________ degrees C column of Table 310.15(B)(2) for temperature
correction.
A. 60
B. 75
C. 90
D. None of the above
2. Answer
C. 90
400.5(A)
3. PV system circuits installed on or in buildings shall include a rapid shutdown
function that controls PV system conductors of more than
________________________ feet in length.
A. 1
B. 5
C. 25
D. 100
3. Answer
B. 5 feet
690.12
4. If ungrounded conductors are increased in size from _____________________ the
equipment grounded conductors shall be increased in size proportionately
according to the circular mill of the ungrounded conductors.
A. the industry standard sizing method
B. minimum size that has sufficient ampacity for the intended installation, wire
type
C. the engineered wire size and installation specification
D. None of the above
4. B
250.122(B)
5. All nonlocking –type, 125-volt, 15 and 20 ampere receptacles that are controlled
by an automatic control device or incorporate control features that remove power
from the outlet for the purpose of energy management or building automation
shall ___________________________.
A. be permitted.
B. be prohibited
C. shall be listed and identified.
D. shall be marked with the universal power button symbol
5. D
406.3(E)
6. ________________ cables shall only be permitted to be installed in a raceway
where specifically listed and marked as part of an electrical circuit protective
system.
A. MC
B. AC
C. PLTC
D. CI
6. D. CI Circuit Integrity Cables
725.179(F)(1)
7. Nonmetallic cable ties and other nonmetallic cable accessories used to secure and
support cables for communications shall be listed as having low ____________
and ______________ release properties.
 A. stress, torque
 B. heat, smoke
 C. toxic, environmental
 D. probability, temperance
7. B
830.24
GENERATORS
8. Marking shall be provided by the manufacturer to indicate whether or not the
generator neutral is bonded to the generator frame. Where the bonding of a
generator is modified in the field, additional field marking shall be required to
indicate whether the generator neutral is bonded to the generator frame.
 A. True
 B. False
8. A. True
445.11
9. A concrete encased electrode of either the conductor type, reinforcing rod or bar
extended from its location with the concrete to an accessible location
______________ the concrete shall be permitted.
 A. adjacent to
 B. above
 C. below
 D. parallel
9. B. Above
250.68
10 If the circuit conductors of an existing dwelling unit bedroom receptacle outlet
120V circuit are extended five feet due to a service panel upgrade and relocation,
AFCI protection shall be required to be installed to protect the entire circuit.
 A. True
 B. False
10. B. False
Only required if longer the 6 feet of extension
210.12(B) Exception
11. Rigid metal conduit is cut at an electrical contractor’s prefabrication shop. It is cut
and threaded in a sealed and temperature controlled building. The NEC requires
that field threads shall be coated with an approved electrically conductive,
corrosion resistant compound. Are the threads made in the prefab shop
considered to be field threads?
A. Yes
B. No
11. A Yes, they are now according to the new informational note.
300.6(A)
12. A raceway may be used as a mean of supporting another raceway if it is identified
as ____________________.
 A. Rigid Metal Conduit
 B. Intermediate Metal Conduit
 C. as a means of support
 D. with a weight and stress rating
12. C. As a means of support
300.11(B)(1)
13. Approved ___________________ ______________ are permitted to be installed in
the field in boxes or conduit bodies listed for use in damp or wet locations in
accordance with manufacturer's instructions




A. form fittings
B. weatherproofing aftermarket accessories
C. drainage openings
D. artistic covers
13. C drainage openings (weep holes. Not bigger than ¼”)
314.15
14.The minimum number of receptacles which shall be installed in a patient bed
location of a health care facility is _______________.




A. 2
B. 4
C. 6
D. 8
14. D Eight
517.18(B)
15. Isolated ground receptacle may in stalled at a patient bed location if it is installed
in accordance with 250.146(D).
A. True
B. False
15. B False
517.16 The revision prohibit IG receptacles in patient bed locations
16. The essential electrical system for a hospital is comprised of the following
branches:
1. Life Safety
2. Critical
3. Equipment
4. Emergency




A. 1 and 2
B. 1 and 3
C. 1, 2 and 3
D. 1, 2 and 4
16. C
517.30(B) The essential electrical system used to be two branches and one of the
branches had two parts. They have simplified it now so that it is just three
branches.
17. Circuits and equipment operating in excess of 600V may not use wiring methods
installed in Liquidtight Flexible Nonmetallic Conduit.
A. True
B. False
17. B False
356.12 Line item 4 which limited it to 600V or less has been deleted in the 2014
NEC
18. Screws used for the purpose of attaching covers, or other equipment to an outlet
or switch box, shall be _____________________.
A. listed for the purpose
B. identified for the purpose
C. machine screws matching the thread gauge or size that is integral to the box
D. All of the above
18. C
314.25
19. At least _______________, 125V, single phase, 15 or 20 ampere rated receptacle
outlet(s) shall be installed within 50 feet of the electrical service equipment of a
single family dwelling.
A. 0
B. 1
C. 2
D. 4
19. A 0
210.64 One is required for other than single and multifamily dwellings. But the
exception makes the correct answer zero.
20. Each operating room of a health care facility shall have a minimum of __________
receptacles , at least _________ of which shall be connected to either the normal
system branch circuit or a critical branch circuit supplied by a different transfer
switch that the other receptacles at the same location.
A. 6, 2
B. 12, 4
C. 24, 8
D. 36, 12
20. D
A new requirement in 517.19(C) requires this many receptacles because surgeons
often utilize stereo systems, etc in operating rooms.
CLICK THE MOUSE BUTTON TO CONTINUE TO
THE UNTIMED REVIEW. YOU WILL NEED TO
CLICK EACH SLIDE TO ADVANCE TO THE NEXT
SLIDE.
1. Cords and cables of listed cord and plug and plug connected equipment in an
elevator hoistway ______________be required to be installed in a raceway.
A. Shal
B. Shall not
Answer 1.
B. Shall not
620.21 Ex.
2. Flexible cords and cables rated 105 degrees C. shall us correction factors in the
_____________ degrees C column of Table 310.15(B)(2) for temperature
correction.
A. 60
B. 75
C. 90
D. None of the above
2. Answer
C. 90
400.5(A)
3. PV system circuits installed on or in buildings shall include a rapid shutdown
function that controls PV system conductors of more than
________________________ feet in length.
A. 1
B. 5
C. 25
D. 100
3. Answer
B. 5 feet
690.12
4. If ungrounded conductors are increased in size from _____________________ the
equipment grounded conductors shall be increased in size proportionately
according to the circular mill of the ungrounded conductors.
A. the industry standard sizing method
B. minimum size that has sufficient ampacity for the intended installation, wire
type
C. the engineered wire size and installation specification
D. None of the above
4. B
250.122(B)
5. All nonlocking –type, 125-volt, 15 and 20 ampere receptacles that are controlled
by an automatic control device or incorporate control features that remove power
from the outlet for the purpose of energy management or building automation
shall ___________________________.
A. be permitted.
B. be prohibited
C. shall be listed and identified.
D. shall be marked with the universal power button symbol
5. D
406.3(E)
6. ________________ cables shall only be permitted to be installed in a raceway
where specifically listed and marked as part of an electrical circuit protective
system.
A. MC
B. AC
C. PLTC
D. CI
6. D. CI Circuit Integrity Cables
725.179(F)(1)
7. Nonmetallic cable ties and other nonmetallic cable accessories used to secure and
support cables for communications shall be listed as having low ____________
and ______________ release properties.
 A. stress, torque
 B. heat, smoke
 C. toxic, environmental
 D. probability, temperance
7. B
830.24
GENERATORS
8. Marking shall be provided by the manufacturer to indicate whether or not the
generator neutral is bonded to the generator frame. Where the bonding of a
generator is modified in the field, additional field marking shall be required to
indicate whether the generator neutral is bonded to the generator frame.
 A. True
 B. False
8. A. True
445.11
9. A concrete encased electrode of either the conductor type, reinforcing rod or bar
extended from its location with the concrete to an accessible location
______________ the concrete shall be permitted.
 A. adjacent to
 B. above
 C. below
 D. parallel
9. B. Above
250.68
10 If the circuit conductors of an existing dwelling unit bedroom receptacle outlet
120V circuit are extended five feet due to a service panel upgrade and relocation,
AFCI protection shall be required to be installed to protect the entire circuit.
 A. True
 B. False
10. B. False
Only required if longer the 6 feet of extension
210.12(B) Exception
11. Rigid metal conduit is cut at an electrical contractor’s prefabrication shop. It is cut
and threaded in a sealed and temperature controlled building. The NEC requires
that field threads shall be coated with an approved electrically conductive,
corrosion resistant compound. Are the threads made in the prefab shop
considered to be field threads?
A. Yes
B. No
11. A Yes, they are now according to the new informational note.
300.6(A)
12. A raceway may be used as a mean of supporting another raceway if it is identified
as ____________________.
 A. Rigid Metal Conduit
 B. Intermediate Metal Conduit
 C. as a means of support
 D. with a weight and stress rating
12. C. As a means of support
300.11(B)(1)
13. Approved ___________________ ______________ are permitted to be installed in
the field in boxes or conduit bodies listed for use in damp or wet locations in
accordance with manufacturer's instructions




A. form fittings
B. weatherproofing aftermarket accessories
C. drainage openings
D. artistic covers
13. C drainage openings (weep holes. Not bigger than ¼”)
314.15
14.The minimum number of receptacles which shall be installed in a patient bed
location of a health care facility is _______________.




A. 2
B. 4
C. 6
D. 8
14. D Eight
517.18(B)
15. Isolated ground receptacle may in stalled at a patient bed location if it is installed
in accordance with 250.146(D).
A. True
B. False
15. B False
517.16 The revision prohibit IG receptacles in patient bed locations
16. The essential electrical system for a hospital is comprised of the following
branches:
1. Life Safety
2. Critical
3. Equipment
4. Emergency




A. 1 and 2
B. 1 and 3
C. 1, 2 and 3
D. 1, 2 and 4
16. C
517.30(B) The essential electrical system used to be two branches and one of the
branches had two parts. They have simplified it now so that it is just three
branches.
17. Circuits and equipment operating in excess of 600V may not use wiring methods
installed in Liquidtight Flexible Nonmetallic Conduit.
A. True
B. False
17. B False
356.12 Line item 4 which limited it to 600V or less has been deleted in the 2014
NEC
18. Screws used for the purpose of attaching covers, or other equipment to an outlet
or switch box, shall be _____________________.
A. listed for the purpose
B. identified for the purpose
C. machine screws matching the thread gauge or size that is integral to the box
D. All of the above
18. C
314.25
19. At least _______________, 125V, single phase, 15 or 20 ampere rated receptacle
outlet(s) shall be installed within 50 feet of the electrical service equipment of a
single family dwelling.
A. 0
B. 1
C. 2
D. 4
19. A 0
210.64 One is required for other than single and multifamily dwellings. But the
exception makes the correct answer zero.
20. Each operating room of a health care facility shall have a minimum of __________
receptacles , at least _________ of which shall be connected to either the normal
system branch circuit or a critical branch circuit supplied by a different transfer
switch that the other receptacles at the same location.
A. 6, 2
B. 12, 4
C. 24, 8
D. 36, 12
20. D
A new requirement in 517.19(C) requires this many receptacles because surgeons
often utilize stereo systems, etc in operating rooms.