Cormac Limited

Download Report

Transcript Cormac Limited

Cormac Engineering
Zambia Limited
The Finance and Construction of
12 Airports
For The Republic of Zambia
Presented by Steve Pearson
Programme Director
Page 1 of 19
Cormac Engineering Zambia Limited
Presented by Steve Pearson Programme Director
Page 2 of 19
Cormac Engineering Zambia Limited
 Endorsed by African Regional High Commissions:
 Leadership and Consultation;
 Providing High Tier Management in Infrastructure Development.
 Setting the standards for Quality and Technology Development.
 High Quality Engineering Expert Implementation;
 Value Added construction solutions.
 Long lasting environmental and humanitarian benefits.
 Sharing your Vision in Partnership;
 We will develop solutions to achieve your objectives.
Presented by Steve Pearson Programme Director
Page 3 of 19
Cormac Engineering Zambia Limited
 Our Accolades:
 Cormac Limited understands the infrastructure requirements
of African countries
 Customer focused and we aim to exceed all expectations
 Adaptive approach to development phasing and
requirements
 Provision of economies of scale to benefit project and
programme implementation.
Presented by Steve Pearson Programme Director
Page 4 of 19
Cormac Engineering Zambia Limited
 Portfolio Examples
Client: Metropolitan Washington Airports Authority
President Ronald Reagan International Airport
Contract Period: April 2011 – March 2012
Contract Value: £8.7 million
===========================================================
Client: Sierra Leone Airport Authority
Lungi International Airport
Contract Period: April 2010 – April 2011
Contract Value: £8 million
Presented by Steve Pearson Programme Director
Page 5 of 19
Cormac Engineering Zambia Limited
 Portfolio Examples
Client: Namibia Airports Company (NAC)
Hosea Kutako International Airport
Contract Period: September 2012 - July 2013
Contract Value: US $ 3.5 million
======================================================
Client: Ilembe Consortium
King Shaka International Airport
Contract Period: Jun 2006 - Apr 2010
Contract Value: $ 45million
Presented by Steve Pearson Programme Director
Page 6 of 19
Cormac Engineering Zambia Limited
 Airports Team
Presented by Steve Pearson Programme Director
Page 7 of 19
Cormac Engineering Zambia Limited
 Outline of Aerodromes
Aerodromes












Presented by Steve Pearson Programme Director
Nakonde
Choma
Kitwe
Chingola
Mufulira
Luanshya
Samfya
Zambezi
Kabwe
Katete
Petauke
Kalabo
Page 8 of 19
Cat 3
Cat 4
Cat 4
Cat 4
Cat 4
Cat 4
Cat 3
Cat 4
Cat 4
Cat 4
Cat 3
Cat 3
International
International
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Domestic
Cormac Engineering Zambia Limited
 List of Services and Deliverables
Engineering & Design Phase








Presented by Steve Pearson Programme Director
Topological And Geotechnical Survey
Boundary Security Construction Drawings
Airfield Pavement Design Construction Drawings
Service Pavement Design Construction Drawings
Car Park Ticket Revenue Design Drawings
Airfield Ground Lighting Design Drawings
Capacity Assessments
Airport Master Plan Development
Page 9 of 19
Cormac Engineering Zambia Limited
 List of Services and Deliverables
Construct
Construction
of Phase
Runways,
Taxiways, Aprons
Construction
1 - Overview
Lighting, Signage, Safety

Implementation
Airport
Access Roadsof Boundary Security

of Runway, Taxiway and RESA
Car Implementation
Parks
Pavements
 Implementation of Apron Pavements
 Implementation of Car Park Pavements & Ticket
Systems
 Implementation of Access Road Pavements
 Implementation of Airfield Ground Lighting
 Implementation of Airfield Signage
Presented by Steve Pearson Programme Director
Page 10 of 19
Cormac Engineering Zambia Limited
 List of Services and Deliverables
Construct
Construction
of Phase
Runways,
Aprons
Construction
1 - Taxiways,
Airfield Pavements
Lighting, Signage, Safety
Airport
Access
Roads at ~ 3ft depth:
 Asphalt
Pavements
Car Parks




Runways: Total 22.4 Km Asphalt
Taxiways: Total 1.8 Km Asphalt
RESAs: Total 72,000 m2 Asphalt
RESAs: Total 28,800 m2 Non-Asphalt
 Concrete Pavements at ~ 3.5 ft depth:
 Aprons: Total 230,958 m2 Concrete
Presented by Steve Pearson Programme Director
Page 11 of 19
Cormac Engineering Zambia Limited
 List of Services and Deliverables
Construct
Construction
of Phase
Runways,
Aprons
Construction
1 - Taxiways,
Service Facilities
Lighting, Signage, Safety
Airport
Access
Roads
 Asphalt
Pavements:
Car Parks
 Car Parks: Total 133,650 m2
 Access Roads: Total 20.98 Km
 Car Parking Systems:
 4 Parking systems each comprising:
 2 Automated Entrance
 2 Automated Exit
 2 Automated Payment Machines
Presented by Steve Pearson Programme Director
Page 12 of 19
Cormac Engineering Zambia Limited
 Building Facilities
Terminal, Tower, Fuel Farm Areas – Phase 2











Presented by Steve Pearson Programme Director
Terminal Design and Construction
ATC Tower Design and Construction
Mechanical Systems Fit out
Electrical Distribution
HVAC
Lighting and Signage
Baggage Handling
Security Screening
Immigration and Transit Areas
Arrivals and Departure areas / lounges
Fuel Farms and Fire Fighting Facilities
Page 13 of 19
Cormac Engineering Zambia Limited
 Communications
Communications Systems – Phase 2





Presented by Steve Pearson Programme Director
ATC VHF Communication Systems
Ground Management Communications
Crash Fire Rescue Communications
Intercom and Public Address Systems
Digital Voice Switch Systems
Page 14 of 19
Cormac Engineering Zambia Limited
 Surveillance
Surveillance Systems – Phase 2




Presented by Steve Pearson Programme Director
Time Reference Systems
Meteorological Systems
Record and Replay Systems
Time Stamping Systems
Page 15 of 19
Cormac Engineering Zambia Limited
 Navigation
Navigation Systems – Phase 3




Presented by Steve Pearson Programme Director
VHF Omnidirectional Range System (VOR)
Instrument Landing Systems (ILS)
Approach Lighting
Runway Centre Line Lighting
Page 16 of 19
Cormac Engineering Zambia Limited
 Commercial:
 Engineering Design and Construction Phase 1:




Financed Programme dependant on arrangement
Two Year Six Month Programme to completion
Programme Price $143, 278, 742 US Dollars
Programme Down Payment of 30%
 Runway Price (per Km) $2, 600 000 or < 20m Kw
Presented by Steve Pearson Programme Director
Page 17 of 19
Cormac Engineering Zambia Limited
 Conclusions:





Dependable Airport Expertise
Proven Airport Programmes
Flexible approach to Client’s needs
Tailored solutions
Cost-effective phased approach
Presented by Steve Pearson Programme Director
Page 18 of 19
Cormac Engineering Zambia Limited
Thank you
for your valuable time!
Any Questions?
Presented by Steve Pearson Programme Director
Page 19 of 19