Transcript Document
brites – Fuel for the Future Balcas the Business • Established 1960’s - £90m turn over • Leading timber products supplier • Pioneered biomass renewable energy in UK & ROI • Largest manufacturer of wood pellets in UK & Ireland • CHP plants in Enniskillen & Invergordon • >5,000 brites direct Customers • We buy > 1,000,000 tonnes wood fibre pa brites – what are they? • • • • • Produced from virgin sawdust from sawmills Available blown bulk delivery and 10kg bagged product EN+ A1 certified Carbon Neutral Fuel 100% of energy used in production generated from CHP on site biomass CHP • Manufacturing and distributing brites for over 10 years Renewable Heat Incentive • Primary objective to increase the uptake of renewable heat to 10% by 2020 • 10% target equates to 1.6 TWh • This target included in the Strategic Energy Framework, interim target of 4% Renewable Heat by 2015 has been included in the Programme for Government • RHI is expected to strengthen fuel security, lower carbon emissions and create green jobs Renewable Heat Incentive (NI) • Non domestic introduced April 2013 • Available for Biomass Boilers, Biogas Combustion, Ground Source Heat Pumps and Solar Thermal Installations • Will pay end users for heat produced during 20 year period • Less than 20kWth – 6.6p per kWh • 20 kWth and above, up to but not including 100kWth – 6.3p per kWh • 100kWth and above, up to but not including 1000kWth – 1.5p per kWh Commercial Business Case • • • • • Green Credentials Example in Community/Sector Fuel Savings RHI Income for 20 years Increases by RPI annually Installation • • • • • • MSC Accredited Installers must be used Balcas Preferred Installer list available Boilers are fully automated, minimal intervention required Plug and Play/Turn Key application recommended Retain existing heating system as back up 99kW maximise RHI payment, multiple units dependent on space available • Typical costs of 99kW - £50K - turnkey • Full maintenance package recommended • EN + A1 fuel should be used, Biomass Suppliers List Capex/Funding • • • • • Boiler 5-7 times cost of fossil fuel equivalents Boiler should be selected to last 20 years of RHI payments Project Funding/Finance options available Carbon Trust Loan available ESCO suppliers available Case Study 1 • • • • 25 bedroom Nursing Home 1 x 99kW boiler required Capex approx. £50k 40,000 litres home heating oil used pa • Savings including RHI - £25,200 per year • Less than 2 year payback • Contractual Fuel Supply Index Linked Case Study 2 • • • • 80 bedroom hotel 2 x 99 Kw boilers required Capex approx. £100k 111,000 litres home heating oil used pa • Savings including RHI - £71,000 per year • Less than 2 year payback • Contractual Fuel Supply Index Linke Case Study 3 • • • • Industrial drying process 5 x 99kW boiler required Capex approx. £250k 260,000 litres oil used pa • Savings including RHI - £163,000 per year • Less than 2 year payback • Contractual Fuel Supply Index Linked Conclusion • • • • • Domestic RHI to be open in Jan 2015 RHPP available £2500 up front payment 5.6p/kWh Get your boiler installed! Contact Details and Further information available at our stand