Subproject HADES 2
Forward Wall
FP6 Meeting September 26, 2006
1
2
3
Progress report
•
Management activities
P -Number
8
12
13
P-Name
IKF
NPI
INR
MM
1
1
1
Date
Title of Meeting
Location
Attendees
WEB
05-04-06
HADES Technical Board
Dresden
5
HADES
12-05-06
FWall Project
Darmstadt
5
-
08-08-06
FWall Project
Darmstadt
3
-
4
Progress report
•
Construction activities
P -Number
8
12
13
P-Name
IKF
NPI
INR
MM
1(0)
3 (5)
4(5)
Milestone
Name
complete
M9-1
Few element read-out
100%
M9-2
All det. elements ready
100%
M9-3
Forward Hod. assembled
80%
5
Progress report
•
Deliverables
Task
Deliverable
D-name
D by contractor
comple
te
9
D9-1
380 channel forward Wall
NPI, INR
100%
9i
D9-2
380 channel HV system
IKF
40%
9
D9-3
380 channel time and
charge digit.
GSI(?)
60%
6
Helium vessel between FWall and Target (RICH)
7
Progress report
Comments
- Table contents reflect the current status; it will be different at the end
of the year
-The following multi annual implementation plan (see below) contains a
new (sub-) task. It reflects the decision to construct a new mechanical
frame to house the detector elements. This new frame will be
manufactured in 2006 and added to the HADES detector in 2007.
-The HV system is delayed because of problems with the bidding
procedure. Orders are out now, delivery and commissioning will take
place by the end of this year. The total cost of the system is up from 60
k Euro to 80 kEuro.
-Since the front end electronics has been designed by and is being built
at GSI, the material has also been bought by GSI. Frankfurt will spend
this money partly on the additional cost of the HV system and partly for
a He-gas vessel (see pictue on page 7 below) between the target and
the FWall, which is needed to reduce the interactions of the spectator
particles on their way to the Fwall. Total cost for this item 27 kEuro. The
remaining budget will be spent on cables, and a VME crate for the
FEE.
8
multi annual implementation plan
9
Backup information
•
•
NPI will spent 6 kEuro personnel money this year; construction of the new frame
will cost about 4 kEuro. They have received 14546.9 Euro from GSI and 7966.16
from EU. Can they spend part of the GSI money for investment (this is material
used to build the new frame)? See also copy of email in the appendix
Until now INR has spent 6050 Euro for salaries, 2650 Euro for travel to GSI, and
1800 Euro on overhead. There remains 7350 Euro which will be spend in similar
ratios.
10
Appendix 1
From [email protected] Fri Sep 15 11:22:11 2006
Date: Fri, 15 Sep 2006 13:19:56 +0200
From: Andrej Kugler <[email protected]>
To: Herbert Stroebele <[email protected]>
Cc: FEDOR GUBER <[email protected]>
Subject: Re: FP6 review
Dear Herbert,
As concern money, this year we are starting spending manpower money for
Sobolev, estimate 6 kEuro till end of this year. Construction of frame
will cost about 3kEuro plus about 1kEuro for outer frame (still have to
check), but this is not manpower money, therefore I did not know if I can
use EU money for it? In fact we got 14546.9 from GSI and 7966.16 from EU, so maybe GSI part
can be used to cover cost of frame production?
11
Appendix 2
From [email protected] Sat Sep 16 07:15:06 2006
Date: Sat, 16 Sep 2006 11:14:58 +0400 (MSD)
From: FEDOR GUBER <[email protected]>
To: Herbert Stroebele <[email protected]>
Cc: [email protected]
Subject: Re: FP6 review
Dear Herbert,
I read your mail just now at the last moment! - I leave on the CBM meeting at Strasburg on Monday and will be not
accessible until 23 September when I appear at GSI. But I can write you some words about INR team participation
in FP6. We have been written it two tasks - RPC and FW, but really participate now only in FW (it will be very nice
if you can officially change this INR status in FP6!). During the first year we have disassemled old FW, checked all
elements (PMTs, scint., LG etc.,), and assembled FW again. Photomultipliers for scint. detectors close to the
beam axis (128 detectors) have been replaced to Russian phomultipliers with C-W dividers. All detectors have
been checked and are now in working condition. In addition, we have done a lot of FW simulation as for dp
reaction and HADES-8 (Au-Au).
Now about spend of money: We got at first tranch17894 Euro. At present, we spent
-about 6050 Euro -salary (including taxes)
-about 2650 Euro -travel (Aeroflot tickets-, because we need to come at GSI for FW assembling at tests).
- about 1800 Euro - overheads, which INR took from transfered money.
In total. we spent up to now 10350 Euro and the rest of first transh is
about 7350 Euro.
This rest we intend to spend in the similar way (about 30% travel and 70% salary).