Transcript Slide 1

Draft City-wide Zoning
Ordinance Update
Discussion with Lindenville Property
Owners
February 9, 2010
General Plan & Zoning
• General Plan (GP)
– Adopted by the City in 1999
– Contains the policies used by the City to make landuse and development decisions
• Zoning Ordinance
– Last comprehensively updated in 1986
– Contains the rules and regulations used to
implement the General Plan
• The Zoning Ordinance is subordinate to the
General Plan, and by State law the two must be
consistent
Lindenville Land Use Diagram
• General Plan Land
Use Designations in
the area:
– Business
Commercial
– Office
– Mixed Industrial
We’ve Heard Your Concerns
• Office development is not feasible at this time
• The City must maintaining the industrial land
base
• There must be flexibility for reuse of industrial
buildings/sites
• There must be more certainty in the review
process
• Response to concerns provided in writing
So we’ve made the following changes…
Office Development:
Not Feasible At This Time
• Business and Professional Office (BPO) Zoning
now includes the following language:
“Until 2024 or such time a program is in place for
developing this essential infrastructure, whichever
comes first, industrial, general service, warehousing,
and related uses are permitted in order to maintain the
economic viability of the area and provide a range of
employment opportunities”.
• Legally established industrial uses in So.
Lindenville will no longer be considered “nonconforming”
Industrial Land In SSF
• Consistent with the adopted General Plan, the
amount of Industrial land remains unchanged
• Based on the adopted General Plan, much of the
southeast corner of the City remains Industrial
Flexibility:
Landscape and Fence Ht.
• Landscape Buffer for Open Parking
Abutting an Interior Lot Line:
– Used to be a 6’ landscape buffer requirement
– Proposing a 3’ landscape buffer requirement
• 8’ tall fence height allowed in rear yard with
Minor Use Permit (20.300.005(A)(3))
– More than 6’ tall fence currently requires CUP
Certainty:
BPO Uses and Required
Improvements
• When is a Use Permit Required
– Use Regulation Tables
– More uses allowed in Industrial Districts
– More uses permitted by right
• Public improvements are required with new
development or additions adding more than
25% of the gross FAR (20.300.009)
Certainty:
Parking and Warehousing
• Nonconforming Parking or Loading
(20.330.003(A)):
– An existing use of land or structure shall not be
deemed to be nonconforming solely because of a lack
of on-site parking and/or loading facilities
• Calculation of Required Parking (20.330.004(B)):
• Parking Reductions (through CUP)
• Standards for Freight/Truck Terminals and
Warehouses (20.350.019)
Certainty:
General Terms
• Warehousing, Storage and Distribution (Mixed
Industrial Zoning)
• Construction & Material Yards, and Industrial
(interim Business Professional Office Zoning)
• Standards and Requirement for Specific Uses
– Ex. Outdoor Storage
Certainty and Flexibility:
Building Transparency
• Building Transparency/Required Openings
(MI Zone):
– Certainty – The draft Code requires buildings
within 20 feet of a front or street side lot line to
include windows, doors, or other openings for
at lest 40% of the building wall area between
2.5 and 7 feet above the level of sidewalk.
– Flexibility – Reduction through Design Review
(this is not a Use Permit)
Certainty:
Site Clearance
• Site clearance application review:
– Existing informal process, now it is written
down for better understanding
• No site clearance is required for the continuation of
previously approved or permitted uses and
structures, or the uses and structures that are not
subject to any building or zoning regulations
Certainty and Flexibility:
Waivers and Exceptions
• Waivers and Exceptions
– Certainty: do NOT apply to:
•
•
•
•
•
Lot area, width, or depth
Maximum number of stories
Minimum number or dimension of required parking spaces
Residential density
Maximum FAR
– Flexibility: 10%, based on Required Findings for:
•
•
•
•
•
•
Minimum yards
Fence and freestanding wall height
Maximum building height
Maximum lot coverage
Minimum landscape requirements
Required ground-floor building transparency
Next Steps:
Zoning Ordinance Update
• Commence Public Hearings
– Planning Commission – February 18, 2009
– City Council must take final action to adopt the
Zoning Ordinance
Discussion and Comments