Transcript Slide 1
Pump Storage: A System Operations Perspective Pump Storage: A System Operations Perspective Sam Holeman Power System Engineer 25 years at Duke Energy 7 yrs - Energy Management System Development Generation Resource Commitment logic Generation Economic Dispatch logic Power Flow logic 18 yrs – Bulk Electric System Operations NERC Certified System Operator-Reliability 0 yrs – Pump Storage Asset Operations 0 yrs – Pump Storage Asset Main 2 In Light of This….The New Title is…… Pump Storage: The Duct Tape of System Operations 3 Duke Energy Carolinas Generation Mix These are approximations Total Generation Capability – 21,000 MWs Nuclear – 7000 MWs Fossil (Coal) – 7600 MWs Combustion Turbines – 3100 MWs Conventional Hydro – 1100 MWs Pump Storage Hydro – 2000 MWs Pump Storage Hydro (MWs) – approx. 9.5% of capacity Pump Storage Generation (MWhrs) – approx. 2.5% of energy generated 4 From the view of System Operations…… Bad Creek Pumped-Storage Generating Station Capacity: 1,065 megawatts Location: Oconee County, South Carolina Commercial Date: 1991 Jocassee Pumped-Storage Generating Station Capacity: 610 megawatts Location: Pickens County, South Carolina Commercial Date: 1973 Numbers don’t tell the story of the value of Pump Storage! 5 The Pump Storage System Operations Story NERC Interconnected Operations Services Operating Reserves Regulating Reserves/Load Following Contingency Reserves Reactive Power Supply Frequency Response From the eyes of System Operations Dependable Flexible Fast/ Nimble Our Duct Tape 6 0:00 0:28 0:56 1:24 1:52 2:20 2:48 3:16 3:44 4:12 4:40 5:08 5:36 6:04 6:32 7:00 7:28 7:56 8:24 8:52 9:20 9:48 10:16 10:44 11:12 11:40 12:08 12:36 13:04 13:32 14:00 14:28 14:56 15:24 15:52 16:20 16:48 17:16 17:44 18:12 18:40 19:08 19:36 20:04 20:32 21:00 21:28 21:56 22:24 22:52 23:20 23:48 Megawatts 2000 1000 500 10000 0 -500 -1500 Bad Creek Jocassee Load 8000 6000 4000 -1000 2000 0 Megawatts Operating Reserves/Load Following/Regulating Reserves 20000 18000 1500 16000 14000 12000 11:45 11:46 11:47 11:48 11:49 11:50 11:51 11:52 11:53 11:54 11:55 11:56 11:57 11:58 11:59 12:00 12:01 12:02 12:03 12:04 12:05 12:06 12:07 12:08 12:09 12:10 12:11 12:12 12:13 12:14 12:15 12:16 12:17 12:18 12:19 12:20 12:21 12:22 12:23 12:24 12:25 12:26 12:27 12:28 12:29 12:30 Megawatts Contingency Reserves/Emergency Response 800 600 400 200 0 -200 -400 -600 Emergency Energy Request - 500 MW Bad Creek Jocassee ACE 8:00 8:01 8:02 8:03 8:04 8:05 8:06 8:07 8:08 8:09 8:10 8:11 8:12 8:13 8:14 8:15 8:16 8:17 8:18 8:19 8:20 8:21 8:22 8:23 8:24 8:25 8:26 8:27 8:28 8:29 8:30 8:31 8:32 8:33 8:34 8:35 8:36 8:37 8:38 8:39 8:40 8:41 8:42 8:43 8:44 8:45 Megawatts 1200 800 400 0 -600 -1000 -1400 Bad Creek Jocassee ACE Freq 60 -200 -400 59.98 -800 59.96 -1200 59.94 Frequency The Real Time Whole Ball of Wax – Pump Storage At Its Best 60.06 1000 60.04 600 60.02 200