Transcript Case Study

Approaches to Historic Bridge Rehabilitation
Case Study #2
Lake Park North Lion Bridge Rehabilitation
Milwaukee, Wisconsin
Darrell Berry, PE, SE
1
Case Study #2
Lake Park North Lion Bridge

Steel arch with concrete deck
 Originally built in 1896, narrowed in the 1960s
 Length: 90 feet; Width: 10 feet clear
 Single span steel arch
 Design Live Load: 85 psf or 15,000 lb. vehicle
North Lion Bridge
Lake Michigan
2
Milwaukee, Wisconsin
Case Study #2
Lake Park North Lion Bridge Rehabilitation

Owner: Milwaukee County Department of Parks,
Recreation and Culture

Design Engineer: Mead & Hunt, Inc.

General Contractor: Vista Design &
Construction, LLC

Project Cost: $1.6 Million

Project dates: started Feb 2009, completed Oct
2009.
3
Case Study #2
Significant Issues Associated With Project
4
1.
Arch Structure
2.
Railing
3.
Stone Facing on Abutments
4.
Lion Statues
1. Steel arch structure, including bearings & concrete deck
5
Case Study #2
How Arch Issue Was Resolved
6

Deteriorated structural steel was removed and replaced, with details
matching original.

Bearings were removed and replaced.

Concrete deck was removed and replaced
 Precast concrete panels
 Cast-in-place concrete surface
Case Study #2
2. Metal Railings
7
Case Study #2
How Railing Issue Was Resolved
8

Railings were removed from bridge and delivered to a fabrication shop.

New finials were added and made larger to fill the openings.

Edges were welded to uprights.

Railings were painted and reinstalled.
Case Study #2
3. Stone facing on abutments
9
Case Study #2
How Stone Facing Issue Was Resolved
10

Missing stones were replaced with matching stones.

Entire abutments were tuckpointed, with color to match existing.

All surfaces were gently cleaned to remove moss and dirt.
Case Study #2
4. Lion Statues
11
Case Study #2
How Lion Statue Issue Was Resolved
12

110 year old statues were in good condition with minimal graffiti.

Cleaning used a gentle process with water and light power wash.

Digital 3D image will be prepared in near future.
Case Study #2
Lessons Learned/Conclusions
13

Rehabilitated bridge is part of beloved, historic park.

Bridge and lion statues are enduring symbols of a celebrated Milwaukee landmark.

Cooperation and collaboration between all parties lead to an extremely successful, award-winning
project.