Strategy on Implementation of the FASRB
and
Action Plan for the Period 2011-2015
Third Meeting of the Parties to the FASRB
Brdo (Slovenia), May 31 – June 1, 2011
Background
• Why a new Strategy?
– A steady progress in the FASRB implementation
• Strength and functionality of the implementation mechanism reached
• Important achievements made so far
• The previous Strategy (5-year time horizon) “expired”
• Funding of a number of crucial projects secured
• Future priority projects identified and agreed upon by the Parties
• Challenges and obstacles identified
• Cooperation with numerous organizations and institutions established
• Remarkable experience from other river basins gained
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
2
Background
• Why a new Strategy?
– A continuously changing “environment” of the implementation process
• Declaration of the 2nd Meeting of the Parties to the FASRB (2009)
• Decisions of the ISRBC related to navigation development (2009, 2010)
• Conclusions of the Meeting on Fostering the FASRB Implementation in the Fields
of Water Management and Environment (2010)
• Joint Statement on Development of Inland Navigation and Environmental
Protection in the Danube River Basin (2008)
• Danube RBM Plan (2009)
• Danube Declaration (2010)
• EU Strategy for the Danube Region (2010)
• EU 2020 Strategy (2010)
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
3
Framework
Natural basis for cooperation
(high environmental and socio-economic
values of the Sava river)
- Natural beauty
- High biological and landscape diversity
- Large retention capacity
- High potential for different forms of
water use (navigation, hydropower,
water supply, recreation, tourism, etc.)
Legal framework for cooperation
-
FASRB and its protocols
Declaration of the 2nd MoP
EU direct., UNECE conv.
MoUs with ICPDR and DC
(recognition of the values)
Mechanism of cooperation
ISRBC
(Strategy on FASRB
implementation)
IMPLEMENTATION OF PROJECTS
Key objective of cooperation
Sustainable development
of the region
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
4
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
5
Sava River Basin
– Area: 97 713 km2 (the second largest Danube sub-basin; share: 12%)
– Average flow at the mouth: 1722 m3/s
(the largest Danube tributary; contribution: 25%)
– River length: 940 km (594 km of which is the waterway)
– Population: approx. 8.5 million
Country
Share of the
basin (%)
Share of the
territory (%)
Albania
0.2
0.6
Bosnia & Herzegovina
39.2
75.8
Croatia
26.0
45.2
7.1
49.6
Serbia
15.5
17.4
Slovenia
12.0
52.8
Montenegro
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
6
Sava River Basin
• High environmental and social value
– Natural beauty
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
7
Sava River Basin
• High environmental and social value
– High biological and landscape diversity
(natural wetlands, parks, protected areas)
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
8
Sava River Basin
• High environmental and social value
– Large retention areas
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
9
Sava River Basin
• High environmental and social value
– High potential for transport of cargo and passengers
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
10
Sava River Basin
• High environmental and social value
– High potential for tourism and recreation
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
11
FASRB
• Key objective:
Transboundary cooperation
for sustainable development of the region
• Particular objectives:
– To establish an international regime of navigation
– To establish sustainable water management
– To prevent/limit hazards (floods, droughts, ice and accidents) and
reduce/eliminate their negative consequences
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
12
FASRB
• Implementation coordinated by the ISRBC (BA, HR, RS, SI)
• Fields of work of the ISRBC
– Issues of sustainability:
•
•
•
•
Protection / improvement of water quality
Maintenance of water quantity
Protection of aquatic ecosystem
Protection against the harmful effects of water
(due to floods, ice, droughts, accidents)
– Development activities:
• Different kinds of water use
(navigation, hydropower generation, water supply,
sewerage and drainage, fishery, tourism and recreation)
• Broadest scope of work among European river commissions
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
13
ISRBC
• Governmental sector
– Officially nominated
national institutions
– Other national
institutions
• Non-gov. sector
• Academic sector
• Business sector
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
14
Current status of implementation
• Navigation, incl. nautical tourism
• Water management
• Other issues of importance
– Information management
– Hydrological and meteorological issues
– Cooperation, public participation, stakeholder involvement
• Lessons learned
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
15
Navigation
– Further unification / upgrade of legal and administrative framework
• Continuing activity
– Rehabilitation, development and maintenance of the waterway
• Finalization of planning phase: 2013
• Beginning of works: 2013
– Development of RIS
• Implementation of
basic services: 2013
Sisak
Bosanski Brod
3.5 – 9.6 million tonnes
Brcko
5.8 – 15.5 million tonnes
Belgrade
7.8 – 20.8 million tonnes
3-8
million
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
16
Navigation
– Establishment of the vessel waste management system
• Beginning of activities: 2014
– Creation of a positive image of inland navigation
• Continuing activity
Cruiser “Victor Hugo”, Sisak, June 2010
– Development of
nautical tourism
• Master Plan: 2013
• Development of infrastructure:
from 2013
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
17
River basin management
– Preparation and implementation of the Sava RBM Plan
• Finalization and adoption of the 1st Sava RBM Plan: 2012
• Implementation of the Programme of Measures:
facilitation of fund raising activities to start in 2012
• Preparation of the 2nd Sava RBM Plan: to start in 2012
– Coordination of integration of water policy with other policies
• Navigation & climate change: ongoing, to be continued
• Hydropower generation & flood risk management: to start in 2012
– Elaboration of other, potentially important issues
• Sediment: activities to start in 2013 (Protocol)
• Groundwater quantity, water demand
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
18
Flood management
– Preparation of the Sava FRM Plan
•
•
•
•
•
Preliminary flood risk assessment: by 2012
Linking flood management and climate change: by 2012
Flood hazard and risk mapping: by 2013
Development of the FRM Plan: to start in 2013
Further upgrade of the Sava hydrologic and hydraulic models: cont.
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
19
Accident prevention and control
– Establishment of a transnational contingency management system
• Development of a water pollution contingency management plan:
to start in 2012
– Permanent training of the existing structures responsible for APC
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
20
Information management
– Establishment of an integrated information system in accordance
with the Sava GIS Strategy
• Setup of the core functionalities: by 2012
• Implementation of dynamic tools and services: 2012 – 2015
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
21
Hydro-meteorological issues
– Strengthening the platform for
exchange and use of HM information
• Hydrological Yearbook: cont.
• System for exchange of HM data:
by 2012
• Hydrological study: by 2014
• Development of the Flood Forecasting
and Warning System for the Sava
River Basin: by 2015
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
22
Public part. and stakeholder involvement
– Strengthening of the public participation process for preparation
and implementation of the Sava RBM Plan
• Preparation of a stakeholder analysis: 2011
• Coordination of the public participation process: cont.
– Further improvement and broadening of stakeholder
involvement in the FASRB implementation process,
i.e. seeking a synergy of a top-down and bottom-up approach
• Feasibility study for establishment of Sava Water Partnership: 2011
• Broadening the multi-stakeholder platform: 2012
• Fostering contribution of the SME sector to sustainable development of
the Sava River Basin: to start in 2012
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
23
Prerequisites
– Securing adequate human and financial resources in the Parties
– Submission of the necessary data by the Parties
– Facilitating a free access to data
– Ratification of protocols to the FASRB
– Strengthening the capacity within the ISRBC framework
• Support of the Parties to the Expert Group members
• Strengthening the capacity of the Secretariat
– Securing funding for implementation
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
24
Opportunities
– Continued improvement of cooperation
• Institutions of the Parties
• International organizations and institutions
– Full conformity with priorities of other cooperation frameworks
• EU Strategy for the Danube Region
• EU 2020 Strategy
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
25
The 2015 vision
• Crucial progress toward the achievement of the FASRB goals
– Reaching the final phase of rehabilitation of the waterway
– Preparation (and implementation) of the strategic plans for the basin
• RBM Plan
• FRM Plan
– Advances in the establishment of integrated systems for the basin
•
•
•
•
GIS
HM information exchange system
Flood forecasting and warning system
Water pollution contingency management system
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
26
The 2015 vision
• Added value
– Integration of water policy with other policies
• Climate change
• Hydropower
• Flood risk management
– Elaboration of the issues potentially important in future (sediment)
• Progress to be fostered through establishment of
– a transparent public participation process
– a broad platform of stakeholders
(incl. governmental, civil, academic and business sectors)
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011
27
Contact information
International Sava River Basin Commission
Kneza Branimira 29/II
10000 Zagreb
Croatia
www.savacommission.org
3rd Meeting of the Parties to the FASRB, Brdo, 31 May - 1 June 2011